Attach 2 Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Drawings.zip | ZIP file | |
| Amendment__1.pdf | ||
| 32_13_11_PCC_Airfield_Pavements_revised.docx | DOCX document | |
| Slab_Repair_Questions_-_5-07-15.doc | DOC document | |
| Site_Visit_Minutes.pdf | ||
| Attch_1_Specifications.zip | ZIP file | |
| Attch_6_Base_Entry_Policy_Letter.pdf | ||
| Solicitation.doc | DOC document | |
| Attch_3_Schedule_of_Drawings.doc | DOC document | |
| Attch_5_Wage_Determination.docx | DOCX document | |
| Attch_4_Drawings.zip | ZIP file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 15-0044 | Bi-annual PCC Slab Repair | FA4626-15-R-0008 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | Shop Drawings 01 00 00 3.10 | 2 | PTSW | ||||||||||||||||||
| 1 | Start of Work Notification 01 00 00 - 3.11 | 1 | PTSW | ||||||||||||||||||
| 2 | Notice of Final Inspection 01 00 00 - 3.12 | 1 | PTFI | ||||||||||||||||||
| 3 | Construction Near Utility Systems 01 00 00 - 3.13 (AF Form 103) | 1 | PTSW | ||||||||||||||||||
| 4 | Utility Outage Notices 01 00 00 - 3.14 | 1 | 14 PTO | ||||||||||||||||||
| 5 | Quality Control Plan 01 00 00 - 3.18.2 | 2 | PTSW | ||||||||||||||||||
| 6 | Quality Control Records 01 00 00 - 3.18.4 | 1 | EWD | ||||||||||||||||||
| 7 | Progress Schedule 01 00 00 - 3.20 (AF Form 3064) | 2 | PTSW | ||||||||||||||||||
| 8 | Nuclear Densometers 01 00 00 - 3.22 | 2 | PTSW | ||||||||||||||||||
| 9 | Authority to Direct the Contractor Form MALMCEP 1000 - 01 00 00 - 3.25 | 2 | PTSW | ||||||||||||||||||
| 10 | Entry Authorization Letter - 01 00 10 | 2 | 45 PTSW | ||||||||||||||||||
| 11 | Property Inventory Checklist (AF Form 1354) 01 78 54 | 2 | PTFI | ||||||||||||||||||
| 12 | Construction Dewatering Permit - 13 60 00 - 2.3 & 4.1.1 | 2 | PTSW | ||||||||||||||||||
| 13 | Construction Storm Water Notice of Intent 13 60 00 - 2.3 & 4.3.1.A | 2 | PTSW | ||||||||||||||||||
| 14 | Construction Storm Water Polution Prevention Plan 13 60 00 - 2.3 & 4.3.1.B | 2 | PTSW | ||||||||||||||||||
| 15 | Construction Storm Water Notice of Termination 13 60 00 - 2.3 & 4.3.1.1 | 2 | PTSW | ||||||||||||||||||
| 16 | Demolition Activities Notification 01 36 00 - 2.4 | 2 | PTSW | ||||||||||||||||||
| 17 | Hazardous Materials Report EESOH-MIS 3952 - 01 36 00 - 8.1.2 | 2 | PTSW | ||||||||||||||||||
| 18 | Monthly Report of Solid Waste Disposal and Diversion - 01 36 00 - 11.3 | 2 | Monthly | ||||||||||||||||||
| 19 | Waste Management Plan - 01 36 00 - 11.6 | 2 | PTSW | ||||||||||||||||||
| 20 | Recovered Materials Written Determination Form - 01 36 00 - 12.4 | 2 | PTSW | ||||||||||||||||||
| 21 | Recycled Material Use Report - 01 36 00 - 12.5 | 2 | PTSW | ||||||||||||||||||
| 22 | Aggregates for Base Course - 32 11 23.1.4 | 2 | PTSW | ||||||||||||||||||
| 23 | Base Course Compaction Tests - 32 11 23.1.4 | 2 | PTCW | ||||||||||||||||||
| 24 | Proposed Paving Techniques - 32 13 11.1.4 | 2 | ACA | ||||||||||||||||||
| 25 | Dowel Material - 32 13 11.1.4 | 2 | 2 | ACA | |||||||||||||||||
| 26 | Dowel Assemblies - 32 13 11 1.4 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 27 | Curing Compound - 32 13 11 1.4 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 28 | Construction/Expansion Joint Material - 32 13 11 1.4 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 29 | Epoxy for Dowels - 32 13 11 1.4 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 30 | Epoxy for Spall Repair - 32 13 11 1.4 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 31 | Mix Design and Proportioning Studies - 32 13 11 1.4 | 2 | ACA | ||||||||||||||||||
| 32 | Sampling and Testing Reports - 32 13 11 1.4 | 2 | 10 PTSW | ||||||||||||||||||
| 33 | Quality Control Staff Certification - 32 13 11 1.4 | 2 | ACA | ||||||||||||||||||
| 34 | Lab Accreditation - 32 13 11 1.4 | 2 | ACA | ||||||||||||||||||
| 35 | Commercial Lab Cert - 32 13 11 1.4 | 2 | ACA | ||||||||||||||||||
| 36 | Joint Seal Material - 32 13 11 2.1.2 | 2 | 10 PTSW | ||||||||||||||||||
| 37 | Blotter Material (if used) - 32 13 11 2.1.2 | 2 | 2 | 10 PTSW | |||||||||||||||||
| 38 | Pavement Marking Equipment - 32 17 24.00 10 | 2 | ACA | ||||||||||||||||||
| 39 | Paint Data - 32 17 24.00 10 1.3 | 2 | 2 | 10 PSTW | |||||||||||||||||
| 40 | Painting Personnel Qualifications - 32 17 24.00 10 1.3 | 2 | 10 PSTW | ||||||||||||||||||
| 41 | VOC Certification - 32 17 24.00 10 1.3 | 2 | 10 PTSW | ||||||||||||||||||
| 42 | CTB Mfrs Recommendations - 32 11 34 1.3 | 2 | ACA | ||||||||||||||||||
| 43 | CTB Mix Design - 32 11 34 1.3 | 2 | 10 PTSW | ||||||||||||||||||
| 44 | Mixing System and Methods - 32 11 34 1.3 | 2 | ACA | ||||||||||||||||||
| 45 | CTB Curing Compound - 32 11 34 1.3 | 2 | 10 PTSW | ||||||||||||||||||
| 46 | CTB Waybills and Delivery Tickets - 32 11 34 1.3 | 2 | PTFI | ||||||||||||||||||
| 47 | Reinforcing Steel (tie down) - 32 13 11 1.4 | 2 | 10 PTSW | ||||||||||||||||||
| 48 | |||||||||||||||||||||
| 49 | |||||||||||||||||||||
| 50 | |||||||||||||||||||||
| Schedule of Abbreviations: | |||||||||||||||||||||
| AWC | = After Work Completed | BMD | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | AN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action | |||||||||||||||||
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&L&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA&R&"Times New Roman,Regular"&12FA4626 15 R0008 &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12
REQUIRED TECHNICAL SUBMITTALS