Attach 1 Statement of Work.pdf
PDF 54 KB Posted
- Attached to
- Airfield Rubber Removal and Pavement Markings
- Solicitation number
- FA462120R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 3 Specifications.pdf | ||
| Attach 4 Wage Determination KS20200147.pdf | ||
| RFQ FA462120R0005.pdf | ||
| Attach 1-1 Airfield Layout.pdf | ||
| Attach 2 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1093925 REPAIR (R&M) AIRFIELD
PAVEMENT MARKINGS SOW - 1 APRIL 2020
McConnell AFB
PROJECT 1093925
REPAIR (R&M) AIRFIELD
PAVEMENT MARKINGS
Statement of Work
APRIL 2020
PAVEMENT MARKINGS SOW - 2 APRIL 2020
STATEMENT OF WORK
1. GENERAL:
1.1. This Statement of Work is for 1093925 REPAIR (R&M) AIRFIELD PAVEMENT
MARKINGS..
1.2. Work includes the furnishing of all plant, labor, equipment, supervision, materials, incidentals, and operations as required for removing airfield painted markings and airfield Portland Cement Concrete (PCC) pavement coatings, and painting airfield markings in strict accordance with the contract technical specifications as specified herein, drawings, attachments, etc. subject to the terms and conditions of the contract.
1.3. Period of construction shall be such that work will be accomplished in the month of
April through October, 2020.
2. BASE BID 1093925 REPAIR (R&M) AIRFIELD PAVEMENT MARKINGS:
2.1. Echo Apron: Remove 100% of pavement taxilane centerline, vehicle lane, hatch area, vehicle lane arrow, and sign markings as shown in the attachments/drawings. Remove 85% of pavement apron edge line and shoulder deceptive shoulder markings as shown in the attachments/drawings. All pavement marking removal shall be on PCC pavement other than a very small amount of asphalt deceptive shoulder marking removal. Paint apron edge lines and deceptive shoulder markings as shown in the attachments/drawings.
Layout new apron aircraft parking layout and paint new taxilane centerline, vehicle lane, aircraft stop blocks, aircraft parking stall number sign and security sign markings as shown in the attachments/drawings. Use diamond grinding to remove 1/16 to 1/8 inch thick PCC pavement coatings as shown in the attachments/drawings.
2.2. North Apron: Remove 100% of PCC pavement equipment storage markings and Taxiway B wing tip clearance training lines. Paint new pavement equipment storage box markings as shown in the attachments/drawings. Paint existing vehicle lane markings, and layout and paint new vehicle lane markings as shown in the attachments/drawings.
2.3. MAPA: Remove 100% of PCC pavement aircraft stall number sign markings, vehicle lane arrow markings, and wingtip clearance training line and sign markings as shown in the attachments/drawings. Paint apron taxilane centerline markings where aircraft number sign markings have been removed. Paint vehicle lane, equipment storage box, wingtip clearance line and aircraft stop bar markings as shown in the attachments/drawings. Layout and paint new aircraft stall number sign markings as shown in the attachments/drawings.
2.4. Runway 01L/19R: Paint both north and south overrun markings non-reflective black.
Layout and paint new overrun markings per UFC 3-260-04-2018 Airfield & Heliport
PAVEMENT MARKINGS SOW - 3 APRIL 2020
Marking (see specifications) on both south and north overruns.
2.5. Runway 01R/19L: 85% remove both north and south overrun markings (on asphalt pavement). Layout and paint new overrun markings per UFC 3-260-04-2018 Airfield & Heliport Marking (see specifications) on both south and north overruns.
2.6. Deicing Pads: Layout and paint wingtip clearance training line and sign markings as shown in the attachments/drawings.
2.7. Foxtrot Apron: Remove 100% of PCC pavement aircraft stall number sign markings as shown in the attachments/drawings. Paint apron taxilane centerline markings where aircraft number sign markings have been removed. Layout and paint aircraft stop blocks, aircraft stall number signs and AGE storage lines as shown in attachments/drawings.
2.8. AGE Storage Area Markings: Layout and paint AGE storage line markings for Building
1107, 1108, 1126 and 1128 as shown in the attachments/drawings.
3. COORDINATION AND ACCESS: All operations shall be coordinated with the Contracting Officer throughout the course of this project. The Contractor shall notify the Contracting Officer before initiating any work, ordering any materials, and shall make written notification of any proposed changes of location or operations. For air traffic scheduling purposes, the Contractor shall notify the Contracting Officer and the Airfield Manager at least 5 working days before arriving with his equipment. All operations shall be coordinated between the contractor, the government inspector, and the Airfield Manager throughout the course of the project. The Contractor personnel shall be briefed by the Airfield Manager on airfield safety, access and other procedures, policies, etc. before work commences. The airfield pavements adjacent to work areas will be in use by aircraft during contractor operations; therefore, not all of the area included in the project will be available to the contractor at one time. One runway and access taxiway capabilities shall be operational at all times. The contractor shall exercise extreme caution during contract performance to ensure that no equipment, materials, or other items are allowed to enter areas of the airfield other than the immediate work areas.
4. GENERAL REQUIREMENTS
4.1. Project is located at McConnell AFB, KS. All contractors bidding on this project should familiarize themselves with the MAFB General Conditions document prior to bidding.
Contact the 22d Contracting Squadron Construction Flight to request a copy.
4.2. In addition to the standards/codes/regulations identified in the specifications, the work shall comply with the following standards/codes/regulations:
• Engineering Technical Letters (ETL’s) in conjunction with Military Handbook 1190
• UFC 3-260-04 AIRFIELD AND HELIPORT MARKING 16 May 2018
• UFC 3-400-01 Energy Conservation
• ]UFC 4-010-2 Dod Minimum Antiterrorism Standards for Buildings
PAVEMENT MARKINGS SOW - 4 APRIL 2020
• National Electric Code, NFPA 70
• National Electric Safety Code
• NFPA 25 Standard for Inspection, Testing , and Maintenance of Water-Based Fire
Protection Systems
• NFPA 101 Life Safety Code
• AFI 31-101 The Air Force Installation Security Program
• International Building Code
• International Mechanical Code
• International Plumbing Code
• Occupational Safety and Health Agency (OSHA) Standards
• Uniform Federal Accessibility Standard
• McConnell AFF Affirmative Procurement Plan
• AFI 32-7080 Pollution Prevention Program
• Resource Conservation and Recovery Act (RCRA)
END OF SOW