Attach_2_-_Price_List_for_soliciation_-_FINAL.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Oil/Water Separator Services
Solicitation number
FA4621-13-R-0001
Issued by

About this file

Attach 2 - Price List

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Oil/Water Separator Services
Base Year - 1 Oct 13 to 30 Sep 14(FY14)
ITEMDESCRIPTIONQTYUNITUNIT COSTTOTAL
0001 AAMaintenance of Oil/Water Separators: FFP

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary for the inspection, cleaning, pumping, and maintenance of oil/water separators listed in Appendix A and in accordance with the PWS para. 1.1.1. through 1.1.2., 1.1.4., 1.1.6., and 1.1.7. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A

12Month(s)$ - 0
0001 ABTesting/Analysis: FFP Non-Personal Services. The Contractor shall provide all materials, equipment, tools, supervision, and labor necessary to perform sampling , and testing/analysis of oil/water separators in accordance with the PWS, Appendix A, and B, and para. 1.1.1., 1.1.3. through 1.1.3.3. (Each item includes sampling of 24 oil/water separators, and a total of (18) individual and composite testing/analysis samples as required by the quarterly, and annual test requirements in the PWS). (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A4Each (Quarterly)$ - 0
0001 ACMFH and Base Sewer Line Flush: FFP

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary to flush 186,000 (estimate) linear feet of base sewer lines as listed in Appendix A and in accordance with PWS para. 1.4 - 1.4.2. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A1Each$ - 0
0001 ADSeptic/Holding Tank Pump: FFP - Requirements

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to pump septic/holding tanks (As needed basis) listed in Appendix A and in accordance with PWS para. 1.3. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A53Each$ - 0
0001 AEClean Grease Traps: FFP

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to service each grease trap listed in Appendix A, and in accordance with PWS para. 1.2., and 1.2.1. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A

12Each$ - 0
0001 AFMaintain Sand Traps: FFP

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the maintenance of 4 sand traps located at separators 2, 3, and 5 as listed in Appendix A, and in accordance with PWS para. 1.1.5. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A12Month(s)$ - 0
0001 AGDisposal of Non-Hazardous Waste: FFP

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of Non-Hazardous Waste (liquid and solid) in accordance with PWS para. 1.1.1.1. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A12Month(s)$ - 0
0001 AHDisposal of Hazardous Waste: FFP - Requirements

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of hazardous waste (liquid and solid) in accordance with PWS para. 1.1.1.2. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A1,600Gallon(s)$ - 0
0001 AJParts: FFP - Requirements

Non-Personal Services. Reimburse contractor for parts used to repair the oil/water serparator systems in accordance with PWS para. 1.1.1. and 1.1.2. in an amount not to exceed $6,457.00. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A1Lot$6,457.00$ 6,457.00
0001 AKLabor Hours for Parts Installation: FFP - Requirements

Non-Personal Services. Labor hours for parts installation for oil/water separator maintenance and repairs in accordance with PWS para. 1.1.1. and 1.1.2. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination

SIGNAL CODE: A20Hour(s)$ - 0
0001 ALEmergency Service Calls: FFP - Requirements

Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the inspection, maintenance, testing, analysis and cleaning of oil/water separators listed in Appendix A and in accordance with PWS para. 1.6. (Item description same for all subsequent option year CLINs)

Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination SIGNAL CODE: A 10 Hour(s) $ - 0

TOTAL FY 14: $ 6,457.00

Option Year (1) - 1 Oct 14 to 30 Sep 15
ITEMDESCRIPTIONQTYUNITUNIT COSTTOTAL
1001 AAMaintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)12Month(s)$ - 0
1001 ABTesting/Analysis: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)4Each (Quarterly)$ - 0
1001 ACMFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)1Each$ - 0
1001 ADSeptic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)53Each$ - 0
1001 AEClean Grease Traps: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)16Each$ - 0
1001 AFMaintain Sand Traps: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)12Month(s)$ - 0
1001 AGDisposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)12Month(s)$ - 0
1001 AHDisposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)1,600Gallon(s)$ - 0
1001 AJParts: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)1Lot$6,457.00$ 6,457.00
1001 AKLabor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)20Hour(s)$ - 0
1001 ALEmergency Service Calls: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15)10Hour(s)$ - 0

TOTAL FY 15: $ 6,457.00

Option Year (2) - 1 Oct 15 to 30 Sep 16(FY16)
ITEMDESCRIPTIONQTYUNITUNIT COSTTOTAL
2001 AAMaintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)12Month(s)$ - 0
2001 ABTesting/Analysis: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)4Each (Quarterly)$ - 0
2001 ACMFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)1Each$ - 0
2001 ADSeptic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)53Each$ - 0
2001 AEClean Grease Traps: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)16Each$ - 0
2001 AFMaintain Sand Traps: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)12Month(s)$ - 0
2001 AGDisposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)12Month(s)$ - 0
2001 AHDisposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)1,600Gallon(s)$ - 0
2001 AJParts: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)1Lot$6,457.00$ 6,457.00
2001 AKLabor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)20Hour(s)$ - 0
2001 ALEmergency Service Calls: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16)10Hour(s)$ - 0

TOTAL FY 16: $ 6,457.00

Option Year (3) - 1 Oct 16 to 30 Sep 17(FY17)
ITEMDESCRIPTIONQTYUNITUNIT COSTTOTAL
3001 AAMaintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)12Month(s)$ - 0
3001 ABTesting/Analysis: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)4Each (Quarterly)$ - 0
3001 ACMFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)1Each$ - 0
3001 ADSeptic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)53Each$ - 0
3001 AEClean Grease Traps: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)16Each$ - 0
3001 AFMaintain Sand Traps: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)12Month(s)$ - 0
3001 AGDisposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)12Month(s)$ - 0
3001 AHDisposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)1,600Gallon(s)$ - 0
3001 AJParts: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)1Lot$6,457.00$ 6,457.00
3001 AKLabor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)20Hour(s)$ - 0
3001 ALEmergency Service Calls: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17)10Hour(s)$ - 0

TOTAL FY 17: $ 6,457.00

Option Year (4) - 1 Oct 17 to 30 Sep 18(FY18)
ITEMDESCRIPTIONQTYUNITUNIT COSTTOTAL
4001 AAMaintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)12Month(s)$ - 0
4001 ABTesting/Analysis: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)4Each (Quarterly)$ - 0
4001 ACMFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)1Each$ - 0
4001 ADSeptic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)53Each$ - 0
4001 AEClean Grease Traps: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)16Each$ - 0
4001 AFMaintain Sand Traps: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)12Month(s)$ - 0
4001 AGDisposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)12Month(s)$ - 0
4001 AHDisposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)1,600Gallon(s)$ - 0
4001 AJParts: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)1Lot$6,457.00$ 6,457.00
4001 AKLabor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)20Hour(s)$ - 0
4001 ALEmergency Service Calls: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18)10Hour(s)$ - 0

TOTAL FY 18: $ 6,457.00

PRICE LIST SUMMARY
BASE YEAR - 1 Oct 13 to 30 Sep 14
0001Oil/Water Separator ServicesFY14 TOTAL:$ 6,457.00
Option Year (1) 1 Oct 14 to 30 Sep 15
1001Oil/Water Separator ServicesFY15 TOTAL:$ 6,457.00
Option Year (2) 1 Oct 15 to 30 Sep 16
2001Oil/Water Separator ServicesFY16 TOTAL:$ 6,457.00
Option Year (3) 1 Oct 16 to 30 Sep 17
3001Oil/Water Separator ServicesFY17 TOTAL:$ 6,457.00
Option Year (4) 1 Oct 17 to 30 Sep 18
4001Oil/Water Separator ServicesFY 18 TOTAL:$ 6,457.00

CONTRACT GRAND TOTAL: (BASE PLUS OPTION YEARS) $ 32,285.00

&"Times New Roman,Regular"&12FA4621-13-R-0001&"-,Bold"&12&UPRICE LIST
&"Times New Roman,Regular"&12ATTACHMENT 2

&"Times New Roman,Regular"&12&P

Sheet2

Sheet3

File details come from the government source that posted it. Updated .