Attach_2_-_Price_List_for_soliciation_-_FINAL.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Oil/Water Separator Services
- Solicitation number
- FA4621-13-R-0001
About this file
Attach 2 - Price List
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Oil/Water Separator Services | |||||
| Base Year - 1 Oct 13 to 30 Sep 14 | (FY14) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 0001 AA | Maintenance of Oil/Water Separators: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary for the inspection, cleaning, pumping, and maintenance of oil/water separators listed in Appendix A and in accordance with the PWS para. 1.1.1. through 1.1.2., 1.1.4., 1.1.6., and 1.1.7. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
SIGNAL CODE: A
| 12 | Month(s) | $ - 0 | ||
| 0001 AB | Testing/Analysis: FFP Non-Personal Services. The Contractor shall provide all materials, equipment, tools, supervision, and labor necessary to perform sampling , and testing/analysis of oil/water separators in accordance with the PWS, Appendix A, and B, and para. 1.1.1., 1.1.3. through 1.1.3.3. (Each item includes sampling of 24 oil/water separators, and a total of (18) individual and composite testing/analysis samples as required by the quarterly, and annual test requirements in the PWS). (Item description same for all subsequent option year CLINs) |
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 4 | Each (Quarterly) | $ - 0 | ||
| 0001 AC | MFH and Base Sewer Line Flush: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervision and labor necessary to flush 186,000 (estimate) linear feet of base sewer lines as listed in Appendix A and in accordance with PWS para. 1.4 - 1.4.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 1 | Each | $ - 0 | ||
| 0001 AD | Septic/Holding Tank Pump: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to pump septic/holding tanks (As needed basis) listed in Appendix A and in accordance with PWS para. 1.3. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 53 | Each | $ - 0 | ||
| 0001 AE | Clean Grease Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary to service each grease trap listed in Appendix A, and in accordance with PWS para. 1.2., and 1.2.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
SIGNAL CODE: A
| 12 | Each | $ - 0 | ||
| 0001 AF | Maintain Sand Traps: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the maintenance of 4 sand traps located at separators 2, 3, and 5 as listed in Appendix A, and in accordance with PWS para. 1.1.5. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ - 0 | ||
| 0001 AG | Disposal of Non-Hazardous Waste: FFP |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of Non-Hazardous Waste (liquid and solid) in accordance with PWS para. 1.1.1.1. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 12 | Month(s) | $ - 0 | ||
| 0001 AH | Disposal of Hazardous Waste: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the pumping and disposal of hazardous waste (liquid and solid) in accordance with PWS para. 1.1.1.2. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 1,600 | Gallon(s) | $ - 0 | ||
| 0001 AJ | Parts: FFP - Requirements |
Non-Personal Services. Reimburse contractor for parts used to repair the oil/water serparator systems in accordance with PWS para. 1.1.1. and 1.1.2. in an amount not to exceed $6,457.00. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 1 | Lot | $6,457.00 | $ 6,457.00 | ||
| 0001 AK | Labor Hours for Parts Installation: FFP - Requirements |
Non-Personal Services. Labor hours for parts installation for oil/water separator maintenance and repairs in accordance with PWS para. 1.1.1. and 1.1.2. The contractor will be paid for the amount actually used. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination
| SIGNAL CODE: A | 20 | Hour(s) | $ - 0 | ||
| 0001 AL | Emergency Service Calls: FFP - Requirements |
Non-Personal Services. The contractor shall provide all materials, equipment, tools, supervison and labor necessary for the inspection, maintenance, testing, analysis and cleaning of oil/water separators listed in Appendix A and in accordance with PWS para. 1.6. (Item description same for all subsequent option year CLINs)
Base Year (1 Oct 13 to 30 Sept 14) FOB: Destination SIGNAL CODE: A 10 Hour(s) $ - 0
TOTAL FY 14: $ 6,457.00
| Option Year (1) - 1 Oct 14 to 30 Sep 15 | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 1001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 12 | Month(s) | $ - 0 | |
| 1001 AB | Testing/Analysis: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 4 | Each (Quarterly) | $ - 0 | |
| 1001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 1 | Each | $ - 0 | |
| 1001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 53 | Each | $ - 0 | |
| 1001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 16 | Each | $ - 0 | |
| 1001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 12 | Month(s) | $ - 0 | |
| 1001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 12 | Month(s) | $ - 0 | |
| 1001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 1,600 | Gallon(s) | $ - 0 | |
| 1001 AJ | Parts: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 1 | Lot | $6,457.00 | $ 6,457.00 |
| 1001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 20 | Hour(s) | $ - 0 | |
| 1001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Oct 14 to 30 Sept 15) | 10 | Hour(s) | $ - 0 |
TOTAL FY 15: $ 6,457.00
| Option Year (2) - 1 Oct 15 to 30 Sep 16 | (FY16) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 2001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 12 | Month(s) | $ - 0 | |
| 2001 AB | Testing/Analysis: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 4 | Each (Quarterly) | $ - 0 | |
| 2001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 1 | Each | $ - 0 | |
| 2001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 53 | Each | $ - 0 | |
| 2001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 16 | Each | $ - 0 | |
| 2001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 12 | Month(s) | $ - 0 | |
| 2001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 12 | Month(s) | $ - 0 | |
| 2001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 1,600 | Gallon(s) | $ - 0 | |
| 2001 AJ | Parts: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 1 | Lot | $6,457.00 | $ 6,457.00 |
| 2001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 20 | Hour(s) | $ - 0 | |
| 2001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Oct 15 to 30 Sept 16) | 10 | Hour(s) | $ - 0 |
TOTAL FY 16: $ 6,457.00
| Option Year (3) - 1 Oct 16 to 30 Sep 17 | (FY17) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 3001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 12 | Month(s) | $ - 0 | |
| 3001 AB | Testing/Analysis: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 4 | Each (Quarterly) | $ - 0 | |
| 3001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 1 | Each | $ - 0 | |
| 3001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 53 | Each | $ - 0 | |
| 3001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 16 | Each | $ - 0 | |
| 3001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 12 | Month(s) | $ - 0 | |
| 3001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 12 | Month(s) | $ - 0 | |
| 3001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 1,600 | Gallon(s) | $ - 0 | |
| 3001 AJ | Parts: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 1 | Lot | $6,457.00 | $ 6,457.00 |
| 3001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 20 | Hour(s) | $ - 0 | |
| 3001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Oct 16 to 30 Sept 17) | 10 | Hour(s) | $ - 0 |
TOTAL FY 17: $ 6,457.00
| Option Year (4) - 1 Oct 17 to 30 Sep 18 | (FY18) | ||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT COST | TOTAL |
| 4001 AA | Maintenance of Oil/Water Separators: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 12 | Month(s) | $ - 0 | |
| 4001 AB | Testing/Analysis: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 4 | Each (Quarterly) | $ - 0 | |
| 4001 AC | MFH and Base Sewer Line Flush: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 1 | Each | $ - 0 | |
| 4001 AD | Septic/Holding Tank Pump: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 53 | Each | $ - 0 | |
| 4001 AE | Clean Grease Traps: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 16 | Each | $ - 0 | |
| 4001 AF | Maintain Sand Traps: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 12 | Month(s) | $ - 0 | |
| 4001 AG | Disposal of Non-Hazardous Waste: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 12 | Month(s) | $ - 0 | |
| 4001 AH | Disposal of Hazardous Waste: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 1,600 | Gallon(s) | $ - 0 | |
| 4001 AJ | Parts: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 1 | Lot | $6,457.00 | $ 6,457.00 |
| 4001 AK | Labor Hours for Parts Installation: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 20 | Hour(s) | $ - 0 | |
| 4001 AL | Emergency Service Calls: Option Year Period of Performance: (1 Oct 17 to 30 Sept 18) | 10 | Hour(s) | $ - 0 |
TOTAL FY 18: $ 6,457.00
| PRICE LIST SUMMARY | |||
| BASE YEAR - 1 Oct 13 to 30 Sep 14 | |||
| 0001 | Oil/Water Separator Services | FY14 TOTAL: | $ 6,457.00 |
| Option Year (1) 1 Oct 14 to 30 Sep 15 | |||
| 1001 | Oil/Water Separator Services | FY15 TOTAL: | $ 6,457.00 |
| Option Year (2) 1 Oct 15 to 30 Sep 16 | |||
| 2001 | Oil/Water Separator Services | FY16 TOTAL: | $ 6,457.00 |
| Option Year (3) 1 Oct 16 to 30 Sep 17 | |||
| 3001 | Oil/Water Separator Services | FY17 TOTAL: | $ 6,457.00 |
| Option Year (4) 1 Oct 17 to 30 Sep 18 | |||
| 4001 | Oil/Water Separator Services | FY 18 TOTAL: | $ 6,457.00 |
CONTRACT GRAND TOTAL: (BASE PLUS OPTION YEARS) $ 32,285.00
| &"Times New Roman,Regular"&12FA4621-13-R-0001 | &"-,Bold"&12&UPRICE LIST |
| &"Times New Roman,Regular"&12ATTACHMENT 2 |
&"Times New Roman,Regular"&12&P
Sheet2
Sheet3
File details come from the government source that posted it. Updated .