15-R-A007 _Attachment_2_-_QASP.pdf
PDF 721 KB Posted
- Attached to
- Elevator Maintenance Services Federal contract opportunity
- Solicitation number
- FA4620-15-R-A007
About this file
Attachment 2 - QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis_of_Award_-_Fairchild_AFB_Elevator_Maintenance.pdf | ||
| FA4620-15-R-A007_0002_Answer_Questions.pdf | ||
| FA4620-15-R-A007-0001.pdf | ||
| 15-R-A007 _Attachment_4 _OperationalSecurity_Information.pdf | ||
| 15-R-A007 _Attachment_1 __PWS_VTE.pdf | ||
| FA4620-15-R-A007 _Elevator_Maintenance_(RFP).pdf | ||
| 15-R-A007 _Attachment_6 _Hazmat_Forms.pdf | ||
| 15-R-A007 _Attachment_3_-_Wage_Determination.pdf | ||
| 15-R-A007 _Attachment_5 _OPSEC_1_Criteria.pdf | ||
| 15-R-A007 _Attachment_7 _Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
FOR
VERTICAL TRANSPORTATION EQUIPMENT
MAINTENANCE, REPAIR & INSPECTION
SERVICES
30 March 2015
FAIRCHILD AFB WA
FA4620-15-R-A007
Quality Assurance Surveillance Plan
Attachment 2
1. OVERVIEW. This Quality Assurance Surveillance Plan (QASP) details how the Vertical
Transportation Equipment Maintenance, Repair & Inspection Services contract will be managed from award throughout its lifecycle. This plan will focus on the level of performance required by the Performance-based Work Statement (PWS), and not the methodology or process used by the contractor.
2. OBJECTIVE. The objective of this contract is to provide Fairchild Air Force Base (FAFB), WA with Vertical Transportation Equipment (VTE) services: preventative maintenance, inspection/testing, repair, certification, and load testing. The contractor shall perform all required services in accordance with best commercial practices, through innovation, technology, manufacturer’s recommendation or any other means necessary to provide the government with its desired outcome.
3. GOALS. By virtue of this Quality Assurance Surveillance Plan (QASP), a multi-functional team will be formed to manage the contract and strive to achieve efficiencies, improved customer service, contractor performance, and cost savings as permitted. Additional goals are as follows:
Maximize performance
Encourage innovation
Promote performance-based services
Increase awareness that performance-based services require participation from all team members
4. MULTI-FUNCTIONAL TEAM MEMBERS AND RESPONSIBILITIES. The following is a list of recommended MFT members(In accordance with MP5346.103 and MP5301.602-2
(d)):
Contracting Officer
Contract Specialist/Administrator
Quality Assurance Program Coordinator (QAPC)
Contracting Officer’s Representative (COR)
Contracting Officer’s Representative (COR) (Supervisor) Management
Contractor
5. PERFORMANCE ASSESSMENT. This section identifies the processes that measure success towards achieving identified performance objectives within the performance thresholds in the Services Summary and achieving the objectives/goals developed in the PWS and this
Quality Assurance Surveillance Plan (QASP).
5.1. Surveillance Approach. The intent of this plan is to primarily rely on the contractor’s internal quality control processes, changing the government’s role from “oversight” to “insight”.
The contractor’s original surveillance approach may not stay the same throughout the duration of the contract; therefore, the government should be prepared to periodically update the surveillance approach when necessary. The goal of our surveillance approach is to gain confidence in the
FA4620-15-R-A007
contractor’s way of doing business and then adjust the level of insight to a point that maintains that confidence.
5.1.1. Quality Assurance. Quality assurance shall be based on the Government’s evaluation of results, not the frequency or method of performance. All key performance objectives must meet the prescribed standards and thresholds identified in the Services Summary to be regarded as acceptable.
5.1.2. Quality Control. The contractor shall utilize its own internal quality control processes to ensure services are performed in accordance with commonly accepted commercial practices and the PWS. Should there be instances of recurring unsatisfactory performance, the contractor’s quality control plan and supporting documentation shall be made available to the government upon request. The COR will verify the key performance objectives and subsequent thresholds in addition to other contract requirements are being performed in accordance with the applicable standards.
5.2. The following is a list of the key performance objectives that will be verified as contractually compliant by government personnel; however, inspection of any contract requirements is authorized.
SERVICES SUMMARY
Performance Objective PWS Para Performance Threshold Method of
Surveillance
All Vertical Transport
Equipment are in Safe, Reliable, Operating
Condition.
1.1 – 1.4, Appendix A
No more than 1 valid customer complaint for units installed after the year
2000 No more than 3 valid customer complaints for units installed prior to the year 2000
Periodic
Surveillance/Customer
Complaint
Service Call response and completion within
PWS specified time.
Emergency –
Routine -
1.4.1 -1.4.2.2. No valid customer complaints during an emergency response.No more than 2 valid customer complaints on Routine responses
Periodic
Surveillance/Customer
Complaint
Reports are accurate and timely
1.3.7., 1.4.1.3., 1.4.2.3.
No more than 2 valid customer complaints per report.
Periodic
Surveillance/Customer
Complaint
FA4620-15-R-A007
5.2.1. In accordance with the CONTRACTOR MANPOWER REPORTING criteria requirements at http://www.ecmra.mil and the Performance-based Work Statement (PWS), CORs shall follow the directions in the user manual for ensuring contractor compliance.
5.2.2. Periodic Inspection. Utilizing periodic inspection of selected areas of work, the COR will ensure that all aspects of contract performance have been validated in order to ensure contract requirements are being met. In addition to areas identified in the Services
Summary/PWS, the COR will monitor any areas of interest such as Human Trafficking, Environmental, and other contract requirements. Those areas found to be unsatisfactory shall be documented through the Customer Feedback Program.
5.3. Customer Feedback Program.
5.3.1 Unsatisfactory Performance. In addition to the COR’s periodic assessment of subject services, any base personnel that observe unacceptable services, either incomplete or not performed, should immediately contact the COR. If found to be valid, the COR will in turn submit a customer feedback/complaint to the contractor with copies to all applicable parties. The contractor shall review and take immediate corrective action.
5.3.2. Customer Complaints. All valid customer complaints shall be re-performed if applicable, as soon as possible after notification, but prior to the next service period. Re-performance however; does not eliminate the customer complaint and it still applies against the contractor’s performance threshold. If the contractor challenges the validity of the complaint and the COR and contractor cannot come to agreement, the customer complaint will be forwarded to the Contracting Officer (CO) for resolution. Customer complaints will be tracked and if the performance threshold is exceeded, action will be taken by the CO in accordance with the applicable Inspection/Acceptance clause.
5.3.3. Recurring Unsatisfactory Performance. If the COR identifies recurring instances of unsatisfactory performance, the COR may request to see the contractor’s internal quality control processes and the COR and MFT shall review it to ensure that the processes they are utilizing are sufficient.
5.3.4. Performance Objectives. Each performance objective includes a government determined performance threshold and the procedures used to ensure this standard is met are as follows:
5.3.5. Performance Surveillance. Contractor performance will be monitored to ensure services are accepted and received. Surveillance methods to be used are periodic review and customer complaint. The COR shall monitor contractor performancein the areas of monthly reports, observation of the Contractor’s hardware/software installations, training, maintenance processes, documentation, and continuity manual update. Performance of services will be evaluated to determine whether or not it meets the performance requirements of the contract.
6. CONTRACT MANAGEMENT. The following identifies areas where measurement information is documented and tracked to encourgage positive change in systemsand processes, helping to ensure completion of agreed upon goals, allocating and prioritizing resources, FA4620-15-R-A007 informing managers to either confirm or change current policy or program directions to meet those goals, and sharing results of performance between the contractor and the MFT.
6.1. Market Research. On-going market research is conducted to ensure the contract requirements remain current with commercial standards and industry performance evaluation methods.
6.2. Contracting Officer Representative Tracking (CORT) Tool . The CORT website is a
DoD electronic depository listing all of the CORs, COR Management, and contracting officials’ information to include the invoicing and payment information associated with each contract. It is located on the Wide Area Workflow WAWF) website at https://wawf.eb.mil/. The COR will initiate action to be assigned to a contract by self-nominating as a COR or in response to a request for COR Support Memorandum, by completing required training and issuing a nomination memorandum to their supervisor for approval. The COR shall initiate a DD2875, System Authorization Access Request (SAAR) for both the CORT and WAWF systems . The actual COR nomination process includes attaching training certificates required per “Type of
Contract” designation made by the Contracting Officer and any applicable refresher training as required.
6.3 Wide Area Work Flow. Upon receipt of an approved DD 2875, the COR can perform certification of services via the Wide Area Work Flow (WAWF) system. CORs are required to take the online course and schedule any additional required training with 92 CPTS/FMA.
Certificates of training shall be downloaded into the CORT Tool. A declining balance worksheet shall be utilized to track funding on all service contracts. In addition to ensuring the contract has sufficient funding to pay for the contracted services, the COR shall coordinate with their local
Resource Advisor to ensure any and all excess funding remaining at the end of each option period is de-obligated.
6.4. COR Records Review. The Contract Specialist/Administrator will review the COR’s surveillance files no less than -annually to ensure performance assessment is being properly conducted and documented, and that the contractor performance is within acceptable levels.
This review will be documented and acknowledged by the CO and COR Management.
a. Surveillance Files. An inspection file must be developed and maintained by the primary COR IAW DFARS PGI 201.602-2(ii) and MP5346.103. This folder is typically contained in hard copy, but may be maintained in a computer database provided there is adequate back up of the data to preclude accidental loss. The surveillance folder must contain the following sections, but may contain any other sections or information that the COR finds useful.
Section 1. Quality Assurance Surveillance Plan (QASP)
Section 2. Contractor’s Quality Control Plan (QCP) (if requested for validation)
Section 3. Surveillance Documents – The type of information that may be included are details of inspections or data gathering, conversations or meetings with the contractor, notes and comments that may be of value at some later date
FA4620-15-R-A007
Quality Assurance Surveillance Plan https://wawf.eb.mil/
Section 4. Contract/Modifications – The portions of the contract that apply to the functional area(s) of the surveillance folder, e.g., PWS chapters, directive documents, references, pertinent terms defined by the contract, equipment listings, etc.
Section 5. COR Support/Nomination/Designation and Termination Memorandums, Certificates of Training
Section 6. Records – A section used for filing all documentation associated with contract quality assurance, e.g., correspondence, CO inputs, customer complaints, Wide Area Work Flow
(WAWF) validation of payment.
6.5. Performance Feedback. Documentation is required to record, evaluate, and report contractor’s performance. On a quarterly basis, the COR will complete a narrative summary of contractor performance and forward it to the Contractor, COR Management, and CO that includes the following assessment elements. This information is a tool to provide the contractor and the Government a snapshot view of their performance.
6.5.1. Performance Ratings. Contractor ratings and criteria are described below:
Performance
Rating Criteria
Exceptional
(Green)
Performance meets contractual requirements and exceeds many of the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some of the
Performance Element Description
Quality of Service
Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety health standards).
Schedule
Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, and delivery schedule, administrative requirements
(e.g., efforts that contribute to or effect the schedule variance).
Business Relations
Assess the integration and coordination of all activities needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history or reasonable and cooperative behavior, customer satisfaction, timely award and management of subcontracts, and whether the contractor met small/small disadvantaged and woman owned business participation goals.
Management of Key
Personnel
Assess the contractor’s performance in selecting, retaining, supporting, and replacing, when necessary, key personnel.
FA4620-15-R-A007
(Green) government benefits. The contractual performance element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective.
Satisfactory
(Green)
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
(Yellow)
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
(Red)
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
6.6. Acquisition of Services Process.
6.6.1. Initial Contract Performance Review. All services acquisitions with a value in excess of $150,000 will be reviewed by the appropriate designated official within 30 days of the contractor’s full assumption of contract workload (for example, end of transition, phase-in, or similar event). The purpose of the review is to determine if the contractor successfully completed transition, is fully operational, and is within other performance parameters required by the contract. The Contracting Officer’s review shall be documented, identifying any negative information concerning contract execution and any corrective actions necessary. The
Contracting Officer can waive the initial 30 day review if the contract is awarded to the incumbent. Documentation of the Contracting Officer’s assessment or waiver of the 30 day review, will be reviewed/approved by the Services Designated Official (SDO).
6.6.2. Annual Execution Review. All services acquisitions with a value in excess of $150,000 will be reviewed annually by the Contracting Officer and the Services Designated Official. The review shall be conducted and documented prior to issuing the notification of the government’s intent to exercise an option to ensure identification of any negative variations in schedule and/or other significant performance measures required by the contract. If significant variations exist, include an explanation of the causes for the variance and an assessment of the contractor’s corrective action plan.
6.7. Changes. Changes to this QASP shall be submitted in writing through the Contracting
Officer.
7. Attachment.
1. Contractor Performance Assessment Checklist
CONTRACTOR PERFORMANCE ASSESSMENT CHECKLIST
Name: _____________________________ Date: _______________________
Contracting Officer Representative (COR)
Period of Assessment: ________________________
Contractor: _____________________ Contract No: _______________________
In accordance with the requirements outlined in the Vertical Transportation Equipment
Maintenance, Repair & Inspection Services Quality Assurance Surveillance Plan (QASP), the following areas of assessment are required to be completed.
1. Areas of Assessment.
Quality of Service. Assess the contractor’s conformance to contract requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety health standards).
Schedule. Assess the timeliness of the contractor against the completion of the contract, tasks, milestones, delivery schedule, and administrative requirements (e.g., efforts that contribute to or effect performance).
Business Relations. Assess the integration and coordination of all activity needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior, and customer satisfaction.
Management of Key Personnel. Assess the contractor’s performance in selecting, retaining, supporting, and replacing key personnel, when necessary.
2. Performance Ratings.
Exceptional (Green) – Performance meets contractual requirements and exceeds many to the governments benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good (Green) - Performance meets contractual requirements and exceeds some to the governments benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective.
Satisfactory (Green) - Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (Yellow) – Performance does not meet some contractual requirements. The contractual performance assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory (Red) – Performance does not meet most contractual requirements and recovery is not likely in a timely manner.
*Check all applicable blocks.
Exceptional Very
Good Satisfactory Marginal Unsatisfactory
Quality of
Service
Schedule
Business
Relations
Management of Key
Personnel
3. Remarks.
Note. Upon receipt of completed form, scan and file in Contracting Officer Representative
Tracking (CORT) tool.