About this file
Amendment 2 - Answer questions from a prospective offeror.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4620-15-Q-A017-0003.pdf | ||
| FA4620-15-Q-A017-0001.pdf | ||
| Attach_1 _SOW.pdf | ||
| FA4620-15-Q-A017 _Dual_Spindle_Lathe.pdf | ||
| Attach_3_Past_Performance_Questionnaire.pdf | ||
| Attach_2_Technical_Evaluation_Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions from a prospective offeror.
POC: SSgt Zachery Ray CO: Edw ard Campbell Phone: 509-247-2608 Phone: 509-247-1970 Email: zachery.ray@us.af.mil Email: edaw rd.campbell.2@us.af.mil
Please ensure blocks 8, 15A, 15B, and 15C are filled out and returned w ith your company`s proposal.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4620-15-Q-A017
X 9B. DATED (SEE ITEM 11)
04-Sep-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Sep-2015
CODE
92 CONTRACTING SQUADRON
BLDG 2451
110 W ENT ST
STE 200
FAIRCHILD AFB WA 99011-8568
FA4620 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4620-15-Q-A017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 2
The following questions were received from a contractor on 16 Sep 15:
Question: Do you require rigging and utility hookup to a breaker?
Answer: Yes
Question: The characteristics are for boxed ways. Is this a preference or requirement? Many of the leading lathe manufacturers use box ways, which are producing the same rigidity and accuracy.
Answer: The Fairchild subject matter expert consider Box ways and boxed ways as interchangeable terms.
Either is acceptable.
Question: If the design of the machine provides adequate cooling, is coolant through casted parts required?
Answer: Yes, cooling through casted parts produces a more accurate product as all of the parts are cooled evenly. This reduces thermal expansion and deformation (warping) from the heat built up from the machining process. Coolant applied to just the outside of the part does not cool the inside to prevent deformation and thermal expansion due to the temperature difference from the outside of the part to the inside.
Question: We can offer a machine with 23” Max cutting length and 30” Z. Does you work require 26” and 30”?
Answer: We require at least 26” max cutting length and at least 30” Z-axis travel to accommodate part size
Question: Is 28” over the cross slide required, or would 20.75” (with Y axis) be acceptable?
Answer: At least 28” swing over the cross slide is required not including the Y-axis
Question: Is 10k rpm on the live spindle a requirement?
Answer: 10K rpm on the live spindle is required as a lower spindle rpm slows production time.
(End of Summary of Changes)