This document addresses questions received at the site visit held on Thursday, 28 February 2019 at 8:30 a.m. (Mountain Time) as well as questions received in regards to the Q&A posted in Amendment 0001.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA461319RA007
Questions and Answers 2 Questions Received at Site Visit, 28 February 2019 at 0830
Question 1: What kind of rock should the Ballast be (i.e. river rock)?
Answer 1: 3” Layer of Ballast Rock is called out on Bid Drawing Sheet 4 of 4 and should match the existing Ballast of the other Evaporation Pond (1-1/2” Nominal Crushed Stone) as was discussed at the site visit.
Question 2: Can the fencing be temporarily torn down?
Answer 2: Yes, please review Section 01 11 00 of the Statement of Work (SOW) on page 4 “Temporary fencing shall be utilized during times when the Pond fence is open for access in order to keep animals out and secure the area for safety reasons.”
Question 3: Are there any MIL SPECS on the new PVC liner?
Answer 3: Yes, please review the Section 33 47 13 of the SOW on page 3 “PVC manufactured in accordance with and conforming to ASTM D7176, 30 mils thick.”
Question 4: Are there drawings/plans available?
Answer 4: Yes, Bid Dwgs (19-LAGOON) R1. The Contractor can request the drawings by acknowledging/filling out Attachment 2 – MFR UCNI Receipt and Control and e-mailing it to the Contract Specialist and Contracting Officer.
Question 5: Can any of the excavated material be reused?
Answer 5: Yes, please review Section 31 23 00.00 20 of the SOW on page 7 “Reuse excavated materials that meet the specified requirements for the material type required at the intended location.”
Question 6: Are there eyelets on the concrete slab to lift it?
Answer 6: This information is not known at this time.
Question 7: Where are the Government property lines where Contractor can conduct work?
Answer 7: This information can be seen upon reviewing Bid Dwgs (19-LAGOON) R1.
Questions and Answers 2 Questions Regarding Amendment 0001
Question 1: I believe your response is not answering his question...“Question 2: Does this bid require a bond? Answer 2: Yes, please review attachment RFQ FA461319RA007-0001 SF 30 (page 1, Blocks 12a and 12b.” I think he is asking is there a Bid Bond required. You have NO selected. Is that correct?
Answer 1: An offer guarantee is not required; however, the contractor must furnish any required performance and payment bonds within 20 calendar days after award. Please review attachment Solicitation – FA461319RA007 (page 1, Blocks 12a, 12b, and 13b).