Repair Sewer Lagoon at MAF N-01
Solicitation number
FA461319RA007
Issued by

About this file

This document addresses questions received at the site visit held on Thursday, 28 February 2019 at 8:30 a.m. (Mountain Time) as well as questions received in regards to the Q&A posted in Amendment 0001.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA461319RA007

Questions and Answers 2 Questions Received at Site Visit, 28 February 2019 at 0830

Question 1: What kind of rock should the Ballast be (i.e. river rock)?

Answer 1: 3” Layer of Ballast Rock is called out on Bid Drawing Sheet 4 of 4 and should match the existing Ballast of the other Evaporation Pond (1-1/2” Nominal Crushed Stone) as was discussed at the site visit.

Question 2: Can the fencing be temporarily torn down?

Answer 2: Yes, please review Section 01 11 00 of the Statement of Work (SOW) on page 4 “Temporary fencing shall be utilized during times when the Pond fence is open for access in order to keep animals out and secure the area for safety reasons.”

Question 3: Are there any MIL SPECS on the new PVC liner?

Answer 3: Yes, please review the Section 33 47 13 of the SOW on page 3 “PVC manufactured in accordance with and conforming to ASTM D7176, 30 mils thick.”

Question 4: Are there drawings/plans available?

Answer 4: Yes, Bid Dwgs (19-LAGOON) R1. The Contractor can request the drawings by acknowledging/filling out Attachment 2 – MFR UCNI Receipt and Control and e-mailing it to the Contract Specialist and Contracting Officer.

Question 5: Can any of the excavated material be reused?

Answer 5: Yes, please review Section 31 23 00.00 20 of the SOW on page 7 “Reuse excavated materials that meet the specified requirements for the material type required at the intended location.”

Question 6: Are there eyelets on the concrete slab to lift it?

Answer 6: This information is not known at this time.

Question 7: Where are the Government property lines where Contractor can conduct work?

Answer 7: This information can be seen upon reviewing Bid Dwgs (19-LAGOON) R1.

Questions and Answers 2 Questions Regarding Amendment 0001

Question 1: I believe your response is not answering his question...“Question 2: Does this bid require a bond? Answer 2: Yes, please review attachment RFQ FA461319RA007-0001 SF 30 (page 1, Blocks 12a and 12b.” I think he is asking is there a Bid Bond required. You have NO selected. Is that correct?

Answer 1: An offer guarantee is not required; however, the contractor must furnish any required performance and payment bonds within 20 calendar days after award. Please review attachment Solicitation – FA461319RA007 (page 1, Blocks 12a, 12b, and 13b).