Atch_4-_Submittal_Register.pdf
PDF 183 KB Posted
- Attached to
- Repair Underground Electric at MAFs/LFs
- Solicitation number
- FA4613-18-R-0003
About this file
AF Form 66
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA461318R0003-0001.pdf | ||
| Q&A__1-_23Apr2018.pdf | ||
| Atch_1-_Specs_04-60(01-05).pdf | ||
| Atch_2-_MFR_UCNI_Receipt_and_Control_A.pdf | ||
| FA461318R0003_Solicitation.pdf | ||
| Atch_3-_Wage_Determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
Replace Electric Service at 55 MMIII Sites (319th)
01 20 00.00 20 SD-01 Preconstruction Submittals
1.2 GProgress Report (3065)
01 32 01.00 10 SD-01 Preconstruction Submittals
3.2 GProject Schedule
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GConstruction schedule
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 50 00 SD-01 Preconstruction Submittals
1.4 GConstruction site plan
01 78 00 SD-03 Product Data 1.2.1As-Built Record of Equipment and Materials SD-08 Manufacturer’s Instructions
1.3Preventative Maintenance 1.3Condition Monitoring (Predictive
Testing) 1.3Inspection
SD-10 Operation and Maintenance Data
1.5Operation and Maintenance Manuals
SD-11 Closeout Submittals
1.4 GCertification of EPA Designated
Items 26 05 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FA4613-18-R-0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
26 05 00.00 40 1.5Material, Equipment, and Fixture Lists
3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches
SD-03 Product Data 3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches 1.4Spare Parts 1.5Certification
SD-06 Test Reports 3.5Continuity Test 3.5Phase-Rotation Tests 3.5Insulation Resistance Test
SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions
26 20 00 SD-02 Shop Drawings
2.14 GWireways
3.1.5.1 GMarking strips
SD-03 Product Data
2.6 GSwitches
2.8 GEnclosed circuit breakers
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
26 20 00 3.4.2 G600-volt wiring test SD-07 Certificates
2.7 GFuses
26 36 00.00 10 SD-02 Shop Drawings
1.3.1Detail Drawings 2.1Equipment 3.1Installation
SD-03 Product Data 2.1Equipment
SD-06 Test Reports
2.6 GTesting
SD-07 Certificates 2.1Equipment 1.3.2Switching Equipment
SD-10 Operation and Maintenance Data
1.3.2 GSwitching Equipment
3.2 GInstructions
28 05 26.00 40 SD-01 Preconstruction Submittals 3.6.2Grounding Systems
SD-02 Shop Drawings 1.4Record Drawings
SD-03 Product Data 2.1Ground Rods 2.2Ground Wires 2.3Connectors and Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
28 05 26.00 40 3.5Bonding SD-06 Test Reports
3.5.1.1Welding 3.6.1Bond Resistance Test 3.6.2Ground Resistance Tests 3.6.3Ground Isolation Test 3.6.4Continuity Isolation Test
SD-08 Manufacturer’s Instructions 3.6.2Grounding Systems
33 71 02.00 20 SD-02 Shop Drawings
1.4.1 GPrecast underground structures
SD-03 Product Data
2.5 GMedium voltage cable
2.7 GMedium voltage cable joints
2.6 GMedium voltage cable
terminations
2.8 GLive end caps
SD-06 Test Reports
3.16.1 GField Acceptance Checks and
Tests 3.3Cable Installation Plan and
Procedure SD-07 Certificates
1.4.2 GCable splicer/terminator
1.4.3Cable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS