Atch_4-_Submittal_Register.pdf

PDF 183 KB Posted

Attached to
Repair Underground Electric at MAFs/LFs
Solicitation number
FA4613-18-R-0003
Issued by

About this file

AF Form 66

View the file

Other files

File Type Posted
FA461318R0003-0001.pdf PDF
Q&A__1-_23Apr2018.pdf PDF
Atch_1-_Specs_04-60(01-05).pdf PDF
Atch_2-_MFR_UCNI_Receipt_and_Control_A.pdf PDF
FA461318R0003_Solicitation.pdf PDF
Atch_3-_Wage_Determinations.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Replace Electric Service at 55 MMIII Sites (319th)

01 20 00.00 20 SD-01 Preconstruction Submittals

1.2 GProgress Report (3065)

01 32 01.00 10 SD-01 Preconstruction Submittals

3.2 GProject Schedule

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GConstruction schedule

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 50 00 SD-01 Preconstruction Submittals

1.4 GConstruction site plan

01 78 00 SD-03 Product Data 1.2.1As-Built Record of Equipment and Materials SD-08 Manufacturer’s Instructions

1.3Preventative Maintenance 1.3Condition Monitoring (Predictive

Testing) 1.3Inspection

SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

SD-11 Closeout Submittals

1.4 GCertification of EPA Designated

Items 26 05 00.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

FA4613-18-R-0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

26 05 00.00 40 1.5Material, Equipment, and Fixture Lists

3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches

SD-03 Product Data 3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches 1.4Spare Parts 1.5Certification

SD-06 Test Reports 3.5Continuity Test 3.5Phase-Rotation Tests 3.5Insulation Resistance Test

SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions

26 20 00 SD-02 Shop Drawings

2.14 GWireways

3.1.5.1 GMarking strips

SD-03 Product Data

2.6 GSwitches

2.8 GEnclosed circuit breakers

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

26 20 00 3.4.2 G600-volt wiring test SD-07 Certificates

2.7 GFuses

26 36 00.00 10 SD-02 Shop Drawings

1.3.1Detail Drawings 2.1Equipment 3.1Installation

SD-03 Product Data 2.1Equipment

SD-06 Test Reports

2.6 GTesting

SD-07 Certificates 2.1Equipment 1.3.2Switching Equipment

SD-10 Operation and Maintenance Data

1.3.2 GSwitching Equipment

3.2 GInstructions

28 05 26.00 40 SD-01 Preconstruction Submittals 3.6.2Grounding Systems

SD-02 Shop Drawings 1.4Record Drawings

SD-03 Product Data 2.1Ground Rods 2.2Ground Wires 2.3Connectors and Fasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

28 05 26.00 40 3.5Bonding SD-06 Test Reports

3.5.1.1Welding 3.6.1Bond Resistance Test 3.6.2Ground Resistance Tests 3.6.3Ground Isolation Test 3.6.4Continuity Isolation Test

SD-08 Manufacturer’s Instructions 3.6.2Grounding Systems

33 71 02.00 20 SD-02 Shop Drawings

1.4.1 GPrecast underground structures

SD-03 Product Data

2.5 GMedium voltage cable

2.7 GMedium voltage cable joints

2.6 GMedium voltage cable

terminations

2.8 GLive end caps

SD-06 Test Reports

3.16.1 GField Acceptance Checks and

Tests 3.3Cable Installation Plan and

Procedure SD-07 Certificates

1.4.2 GCable splicer/terminator

1.4.3Cable Installer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it.