Attach_08_construction_cost_breakdown.pdf

PDF 2 MB Posted

Attached to
Replace HVAC Bldg. 6525 Federal contract opportunity
Solicitation number
FA461019RA037
Issued by
Department of the Air Force Space Command

About this file

Construction Cost Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC Bldg. 6525, newest first.
File Type Posted
RFI_question_45.pdf PDF
RFI_PM_response.pdf PDF
DO_0016-Award.pdf PDF
16-1165_2nd_Sign_in.pdf PDF
16-1165B_2nd_Site_Validation_Visit_Minutes.pdf PDF
Solicitation_Amendment_-_FA461019RA0370001.pdf PDF
Solicitation_Amendment_FA461019RA0370001_SF_30.pdf PDF
16-1165B_Site_Validation_Visit_Minutes.pdf PDF
16-1165B_Site_Validation_Visit_Sign_In.pdf PDF
Attach_05_DOL_Wage_Determination_F.pdf PDF
Attach_09_Solicitation_-_FA461019RA037.pdf PDF
Attach_04_Environmental_Specs.pdf PDF
Attach_07_Schedule_Material_Submittals.pdf PDF
Attach_01__SOW.pdf PDF
Attach_02_010000_General_Requirements.pdf PDF
Attach_03_014400_QC.pdf PDF
Attach_06_RMDF.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Cost Estimate

Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive.

The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

Attach 08

FA4610-19-R-A037

Fill Here

COMPANY

PROJECT

Fill Here

LOCATION PROJECT NO.

EGLIN AIR FORCE BASE, FLORIDA

DIVISION 01 GENERAL REQUIREMENTS 28.7% 50.00

DIVISION 02 EXISTING CONDITIONS 34.2% 59.48

DIVISION 03 CONCRETE WORK 37.1% 64.45

DIVISION 04 MASONRY -

DIVISION 05 METALS -

DIVISION 06 WOOD, PLASTICS AND COMPOSITES - GC Overhead 10.00% DIVISION 07 THERMAL AND MOISTURE PROTECTION - GC Profit 15.00% DIVISION 08 OPENINGS - Sub Overhead 5.00% DIVISION 09 FINISHES - Sub Profit 11.00% DIVISION 10 SPECIALTIES - Sales Tax 6.00% DIVISION 11 EQUIPMENT - Risk/Bonding 2.00%

DIVISION 12 FURNISHINGS -

DIVISION 13 SPECIAL CONSTRUCTION -

DIVISION 14 CONVEYING EQUIPMENT -

DIVISION 21 FIRE SUPRESSION -

DIVISION 22 PLUMBING -

DIVISION 23 HEATING, VENTILATING AND A/C -

DIVISION 25 INTEGRATED AUTOMATION -

DIVISION 26 ELECTRICAL -

DIVISION 27 COMMUNICATIONS -

DIVISION 28 ELECTRONIC SAFETY AND SECURITY -

DIVISION 31 EARTHWORK -

DIVISION 32 EXTERIOR IMPROVEMENTS -

DIVISION 33 UTILITIES -

DIVISION 34 TRANSPORTATION -

DIVISION 35 WATERWAYS AND MARINE CONSTRUCTION -

DIVISION 40 PROCESS INTEGRATION -

DIVISION 41 MATERIAL PROCESING AND HANDLING EQUIPMENT -

DIVISION 42 PROCESS HEATING, COOLING AND DRYING EQUIPMENT -

DIVISION 43

PROCESS GAS & LIQUID HANDLING, PURIFICATION AND

STORAGE EQUIPMENT -

DIVISION 44 POLLUTION CONTROL EQUIPMENT -

DIVISION 45 INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT -

DIVISION 48 ELECTRICAL POWER GENERATION -

100% 173.93

10% 17.39

SUBTOTAL 191.32

15% 28.70

SUBTOTAL 220.02

2% 4.40

224.42$

Fill Here

Division Total

Fill Here

% by DivisionDESCRIPTIONDIVISION

BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)

CONTRACT TOTAL

FILL IN AS REQUIRED

(this will link to the entire document)

This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas

CONSTRUCTION COST ESTIMATE Date:

HARD COST TOTAL

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)

PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

GENERAL REQUIREMENTS

Sample Input 2 - 10.00 20.00 20.00

Sample Input 3 1.00 10.00 30.00 - 30.00

TOTAL LABOR/MATERIALS 30.00 20.00

SUBTOTAL 50.00

Sub-Contractor's Overhead -

Sub-Contractor's Profit -

FL State Sales Tax -

TOTAL 50.00$

CONSTRUCTION COST ESTIMATE

Fill Here Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

EXISTING CONDITIONS

Sample Input 2 - 10.00 20.00 20.00

Sample Input 3 10.00 30.00 - 30.00

TOTAL LABOR/MATERIALS 30.00 20.00

SUBTOTAL 50.00

Sub-Contractor's Overhead 5.00% 2.50

Sub-Contractor's Profit 11.00% 5.78

FL State Sales Tax 6.00% 1.20

TOTAL 59.48$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

CONCRETE WORK

Sample Input 2 - 10.00 20.00 20.00

Sample Input 3 10.00 30.00 - 30.00

TOTAL LABOR/MATERIALS 30.00 20.00

SUBTOTAL 50.00

Sub-Contractor's Overhead 10.00% 5.00

Sub-Contractor's Profit 15.00% 8.25

FL State Sales Tax 6.00% 1.20

TOTAL 64.45$

CONSTRUCTION COST ESTIMATE

Fill Here Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

MASONRY

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

METALS

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

WOOD, PLASTICS AND COMPOSITES

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

THERMAL AND MOISTURE PROTECTION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

OPENINGS

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

FINISHES

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

SPECIALTIES

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

FURNISHINGS

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

SPECIAL CONSTRUCTION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

CONVEYING EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

FIRE SUPRESSION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill HereFill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

PLUMBING

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

HEATING, VENTILATING AND A/C

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

INTEGRATED AUTOMATION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

ELECTRICAL

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

COMMUNICATIONS

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

ELECTRONIC SAFETY AND SECURITY

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

EARTHWORK

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

EXTERIOR IMPROVEMENTS

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

UTILITIES

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

TRANSPORTATION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

WATERWAYS AND MARINE CONSTRUCTION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

RESERVED

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

PROCESS INTEGRATION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

MATERIAL PROCESING AND HANDLING EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

PROCESS HEATING, COOLING AND DRYING EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

POLLUTION CONTROL EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

CONSTRUCTION COST ESTIMATE

Fill Here

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

ELECTRICAL POWER GENERATION

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

A B C D E F G H

DATE

Fill Here

PROJECT BASIS FOR ESTIMATE

Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)

DRAWING NO. ESTIMATOR CHECKED BY

QUANTITY LABOR MATERIAL

ITEM DESCRIPTION

NO.

UNITS

UNIT

MEAS. PER UNIT TOTAL PER UNIT TOTAL

TOTAL COST

RESERVED

TOTAL LABOR/MATERIALS - -

SUBTOTAL -$

Sub-Contractor's Overhead 5.00% -

Sub-Contractor's Profit 11.00% -

FL State Sales Tax 6.00% -

TOTAL -$

Fill Here Fill Here

CONSTRUCTION COST ESTIMATE

Instructions
Summary
Div1
Div2
Div3
Div4
Div5
Div6
Div7
Div8
Div9
Div10
Div11
Div12
Div13
Div14
Div15
Div16
Div20
Div21
Div22
Div23
Div24
Div25
Div26
Div27
Div28
Div29
Div30
Div31
Div32
Div33
Div34
Div35
Div36
Div37
Div38
Div39
Div40
Div41
Div42
Div43
Div44
Div45
Div46
Div47
Div48
Div49