Attach_08_construction_cost_breakdown.pdf
PDF 2 MB Posted
- Attached to
- Replace HVAC Bldg. 6525 Federal contract opportunity
- Solicitation number
- FA461019RA037
About this file
Construction Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_question_45.pdf | ||
| RFI_PM_response.pdf | ||
| DO_0016-Award.pdf | ||
| 16-1165_2nd_Sign_in.pdf | ||
| 16-1165B_2nd_Site_Validation_Visit_Minutes.pdf | ||
| Solicitation_Amendment_-_FA461019RA0370001.pdf | ||
| Solicitation_Amendment_FA461019RA0370001_SF_30.pdf | ||
| 16-1165B_Site_Validation_Visit_Minutes.pdf | ||
| 16-1165B_Site_Validation_Visit_Sign_In.pdf | ||
| Attach_05_DOL_Wage_Determination_F.pdf | ||
| Attach_09_Solicitation_-_FA461019RA037.pdf | ||
| Attach_04_Environmental_Specs.pdf | ||
| Attach_07_Schedule_Material_Submittals.pdf | ||
| Attach_01__SOW.pdf | ||
| Attach_02_010000_General_Requirements.pdf | ||
| Attach_03_014400_QC.pdf | ||
| Attach_06_RMDF.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Cost Estimate
Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive.
The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute
Attach 08
FA4610-19-R-A037
Fill Here
COMPANY
PROJECT
Fill Here
LOCATION PROJECT NO.
EGLIN AIR FORCE BASE, FLORIDA
DIVISION 01 GENERAL REQUIREMENTS 28.7% 50.00
DIVISION 02 EXISTING CONDITIONS 34.2% 59.48
DIVISION 03 CONCRETE WORK 37.1% 64.45
DIVISION 04 MASONRY -
DIVISION 05 METALS -
DIVISION 06 WOOD, PLASTICS AND COMPOSITES - GC Overhead 10.00% DIVISION 07 THERMAL AND MOISTURE PROTECTION - GC Profit 15.00% DIVISION 08 OPENINGS - Sub Overhead 5.00% DIVISION 09 FINISHES - Sub Profit 11.00% DIVISION 10 SPECIALTIES - Sales Tax 6.00% DIVISION 11 EQUIPMENT - Risk/Bonding 2.00%
DIVISION 12 FURNISHINGS -
DIVISION 13 SPECIAL CONSTRUCTION -
DIVISION 14 CONVEYING EQUIPMENT -
DIVISION 21 FIRE SUPRESSION -
DIVISION 22 PLUMBING -
DIVISION 23 HEATING, VENTILATING AND A/C -
DIVISION 25 INTEGRATED AUTOMATION -
DIVISION 26 ELECTRICAL -
DIVISION 27 COMMUNICATIONS -
DIVISION 28 ELECTRONIC SAFETY AND SECURITY -
DIVISION 31 EARTHWORK -
DIVISION 32 EXTERIOR IMPROVEMENTS -
DIVISION 33 UTILITIES -
DIVISION 34 TRANSPORTATION -
DIVISION 35 WATERWAYS AND MARINE CONSTRUCTION -
DIVISION 40 PROCESS INTEGRATION -
DIVISION 41 MATERIAL PROCESING AND HANDLING EQUIPMENT -
DIVISION 42 PROCESS HEATING, COOLING AND DRYING EQUIPMENT -
DIVISION 43
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND
STORAGE EQUIPMENT -
DIVISION 44 POLLUTION CONTROL EQUIPMENT -
DIVISION 45 INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT -
DIVISION 48 ELECTRICAL POWER GENERATION -
100% 173.93
10% 17.39
SUBTOTAL 191.32
15% 28.70
SUBTOTAL 220.02
2% 4.40
224.42$
Fill Here
Division Total
Fill Here
% by DivisionDESCRIPTIONDIVISION
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)
CONTRACT TOTAL
FILL IN AS REQUIRED
(this will link to the entire document)
This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
CONSTRUCTION COST ESTIMATE Date:
HARD COST TOTAL
PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
GENERAL REQUIREMENTS
Sample Input 2 - 10.00 20.00 20.00
Sample Input 3 1.00 10.00 30.00 - 30.00
TOTAL LABOR/MATERIALS 30.00 20.00
SUBTOTAL 50.00
Sub-Contractor's Overhead -
Sub-Contractor's Profit -
FL State Sales Tax -
TOTAL 50.00$
CONSTRUCTION COST ESTIMATE
Fill Here Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
EXISTING CONDITIONS
Sample Input 2 - 10.00 20.00 20.00
Sample Input 3 10.00 30.00 - 30.00
TOTAL LABOR/MATERIALS 30.00 20.00
SUBTOTAL 50.00
Sub-Contractor's Overhead 5.00% 2.50
Sub-Contractor's Profit 11.00% 5.78
FL State Sales Tax 6.00% 1.20
TOTAL 59.48$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
CONCRETE WORK
Sample Input 2 - 10.00 20.00 20.00
Sample Input 3 10.00 30.00 - 30.00
TOTAL LABOR/MATERIALS 30.00 20.00
SUBTOTAL 50.00
Sub-Contractor's Overhead 10.00% 5.00
Sub-Contractor's Profit 15.00% 8.25
FL State Sales Tax 6.00% 1.20
TOTAL 64.45$
CONSTRUCTION COST ESTIMATE
Fill Here Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
MASONRY
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
METALS
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
WOOD, PLASTICS AND COMPOSITES
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
THERMAL AND MOISTURE PROTECTION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
OPENINGS
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
FINISHES
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
SPECIALTIES
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
FURNISHINGS
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
SPECIAL CONSTRUCTION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
CONVEYING EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
FIRE SUPRESSION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill HereFill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
PLUMBING
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
HEATING, VENTILATING AND A/C
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
INTEGRATED AUTOMATION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
ELECTRICAL
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
COMMUNICATIONS
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
ELECTRONIC SAFETY AND SECURITY
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
EARTHWORK
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
EXTERIOR IMPROVEMENTS
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
UTILITIES
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
TRANSPORTATION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
RESERVED
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
PROCESS INTEGRATION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
POLLUTION CONTROL EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify) Fill Here
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
CONSTRUCTION COST ESTIMATE
Fill Here
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
ELECTRICAL POWER GENERATION
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
A B C D E F G H
DATE
Fill Here
PROJECT BASIS FOR ESTIMATE
Fill Here CODE A (No design completed) LOCATION CODE B (Preliminary design) EGLIN AIR FORCE BASE, FLORIDA CODE C (Final design) COMPANY PROJECT NO. OTHER (Specify)
DRAWING NO. ESTIMATOR CHECKED BY
QUANTITY LABOR MATERIAL
ITEM DESCRIPTION
NO.
UNITS
UNIT
MEAS. PER UNIT TOTAL PER UNIT TOTAL
TOTAL COST
RESERVED
TOTAL LABOR/MATERIALS - -
SUBTOTAL -$
Sub-Contractor's Overhead 5.00% -
Sub-Contractor's Profit 11.00% -
FL State Sales Tax 6.00% -
TOTAL -$
Fill Here Fill Here
CONSTRUCTION COST ESTIMATE
| Instructions |
| Summary |
| Div1 |
| Div2 |
| Div3 |
| Div4 |
| Div5 |
| Div6 |
| Div7 |
| Div8 |
| Div9 |
| Div10 |
| Div11 |
| Div12 |
| Div13 |
| Div14 |
| Div15 |
| Div16 |
| Div20 |
| Div21 |
| Div22 |
| Div23 |
| Div24 |
| Div25 |
| Div26 |
| Div27 |
| Div28 |
| Div29 |
| Div30 |
| Div31 |
| Div32 |
| Div33 |
| Div34 |
| Div35 |
| Div36 |
| Div37 |
| Div38 |
| Div39 |
| Div40 |
| Div41 |
| Div42 |
| Div43 |
| Div44 |
| Div45 |
| Div46 |
| Div47 |
| Div48 |
| Div49 |
File details come from the government source that posted it.