Attach_07_Schedule_Material_Submittals.pdf
PDF 105 KB Posted
- Attached to
- Replace HVAC Bldg. 6525 Federal contract opportunity
- Solicitation number
- FA461019RA037
About this file
Schedule Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_question_45.pdf | ||
| DO_0016-Award.pdf | ||
| RFI_PM_response.pdf | ||
| 16-1165B_2nd_Site_Validation_Visit_Minutes.pdf | ||
| 16-1165_2nd_Sign_in.pdf | ||
| Solicitation_Amendment_-_FA461019RA0370001.pdf | ||
| Solicitation_Amendment_FA461019RA0370001_SF_30.pdf | ||
| 16-1165B_Site_Validation_Visit_Sign_In.pdf | ||
| 16-1165B_Site_Validation_Visit_Minutes.pdf | ||
| Attach_09_Solicitation_-_FA461019RA037.pdf | ||
| Attach_05_DOL_Wage_Determination_F.pdf | ||
| Attach_02_010000_General_Requirements.pdf | ||
| Attach_01__SOW.pdf | ||
| Attach_04_Environmental_Specs.pdf | ||
| Attach_08_construction_cost_breakdown.pdf | ||
| Attach_03_014400_QC.pdf | ||
| Attach_06_RMDF.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
Project Number:
[ enter here ]
Project Title:
[ enter here ]
Solicitation / Contract Number:
[ enter here ]
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
R eq ui re d Su bm is si on
D at e
Item or Description of Item, Contract Reference, Type of Submittal
C er tif ic at e of C om pl ia nc e
Sh op
D ra w in gs
R et ur n
Su sp en se
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
C ol or S el ec tio n
Number of Copies Required
D at e R ec ei ve d in C on tra ct in g
Fi el d R ep or ts
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns
M an uf ac tu re r's R ec om m en da tio n
M an uf ac tu re r's W ar ra nt y
C at al og
D at a
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
C on tra ct or R es ub m itt al
Fi na l A pp ro va l
Attach 07
FA4610-19-R-A037
Material Submittals Schedule
File details come from the government source that posted it.