Attach_07_Schedule_Material_Submittals.pdf

PDF 105 KB Posted

Attached to
Replace HVAC Bldg. 6525 Federal contract opportunity
Solicitation number
FA461019RA037
Issued by
Department of the Air Force Space Command

About this file

Schedule Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC Bldg. 6525, newest first.
File Type Posted
RFI_question_45.pdf PDF
DO_0016-Award.pdf PDF
RFI_PM_response.pdf PDF
16-1165B_2nd_Site_Validation_Visit_Minutes.pdf PDF
16-1165_2nd_Sign_in.pdf PDF
Solicitation_Amendment_-_FA461019RA0370001.pdf PDF
Solicitation_Amendment_FA461019RA0370001_SF_30.pdf PDF
16-1165B_Site_Validation_Visit_Sign_In.pdf PDF
16-1165B_Site_Validation_Visit_Minutes.pdf PDF
Attach_09_Solicitation_-_FA461019RA037.pdf PDF
Attach_05_DOL_Wage_Determination_F.pdf PDF
Attach_02_010000_General_Requirements.pdf PDF
Attach_01__SOW.pdf PDF
Attach_04_Environmental_Specs.pdf PDF
Attach_08_construction_cost_breakdown.pdf PDF
Attach_03_014400_QC.pdf PDF
Attach_06_RMDF.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

Project Number:

[ enter here ]

Project Title:

[ enter here ]

Solicitation / Contract Number:

[ enter here ]

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

R eq ui re d Su bm is si on

D at e

Item or Description of Item, Contract Reference, Type of Submittal

C er tif ic at e of C om pl ia nc e

Sh op

D ra w in gs

R et ur n

Su sp en se

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

C ol or S el ec tio n

Number of Copies Required

D at e R ec ei ve d in C on tra ct in g

Fi el d R ep or ts

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns

M an uf ac tu re r's R ec om m en da tio n

M an uf ac tu re r's W ar ra nt y

C at al og

D at a

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

C on tra ct or R es ub m itt al

Fi na l A pp ro va l

Attach 07

FA4610-19-R-A037

Material Submittals Schedule

File details come from the government source that posted it.