Attachment_8_-_AF_IMT_813_Env_Impact_Analysis.pdf

PDF 2 MB Posted

Attached to
XUMU 09-1371C Construct Lightning Protection System Federal contract opportunity
Solicitation number
FA4610-17-R-0008
Issued by
Department of the Air Force Space Command

About this file

Attachment 8 - AF IMT 813 Environmental Impact Analysis

View the file

Other files for this federal contract opportunity

Other files attached to XUMU 09-1371C Construct Lightning Protection System, newest first.
File Type Posted
RFI___2,_Utility_&_Paving_DWG.PNG PNG image
RFI___2_Response_to_Questions.pdf PDF
RFI___2_1245_C-2_Plot_Plan_with_Topo_Lines_-_1968.pdf PDF
LPS_for_B475_RFI_Dwgs_28MAR17.zip ZIP file
09-1371C_RFIs_28MAR17.pdf PDF
Amend_02.pdf PDF
LPS_Amend_02.pdf PDF
09-1371C_Site_Visit_Attendance_Roster.pdf PDF
FA4610-17-R-0008-LPS.pdf PDF
Amendment_1_to_09-1371C.pdf PDF
Attachment_3_-_SB_County_WD_Mod_3_2017-02-17.pdf PDF
Attachment_1_-__Statement_of_Work.pdf PDF
Attachment_6_-_LPS_Design_Checklist.pdf PDF
Attachment_7_-_General_Requirements.pdf PDF
Attachment_2_-_30_CES_VAFB_LPS_Design_Guidelines.pdf PDF
Attachment_5_-__Environmental_Specs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30 CES/CEIEA 30 CES CENMP 6062079

XUMU 09-1371C Construct Lightning Protection for Comm. Hub Bldg. 475.

Install new catenary lightning protection system for Bldg. 475. This is a mission critical comm. facility on a high hill which has no

LPS.

See page 2.

Richard Heslop 20161207

Report Control Symbol

RCS: REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).

SECTION I - PROPONENT INFORMATION

1. TO (Environmental Planning Function) 2. FROM (Proponent organization and functional address symbol) 2a. TELEPHONE NO.

3. TITLE OF PROPOSED ACTION

4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)

5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)

6. PROPONENT APPROVAL (Name and Grade) 6a. SIGNATURE 6b. DATE

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY. (Check appropriate box and describe potential environmental effects + 0 U - Including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U= unknown effect)

7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)

8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)

9. WATER RESOURCES (Quality, quantity, source, etc.)

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity-distance, bird/wildlife aircraft hazard, etc.)

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)

13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)

16. OTHER (Potential impacts not addressed above.)

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # ; OR

PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.

18. REMARKS

19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION 19a. SIGNATURE 19b. DATE (Name and Grade)

THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

PAGE 1 OF PAGE(S) AF IMT 813, 19990901, V1

A2.3.8

10 Feb 2017 Tracy Curry, GS-12

Environmental Planner

Proposed Action qualifies for CATEX A2.3.8, which states "Performing interior and exterior construction within the 5 foot line of a building without changing the land use or the existing building." See attached comments for further Environmental requirements that need to be accomplished for this project.

CURRY-

BUMPASS.TRACY.L.130041511

Digitally signed by CURRY-BUMPASS.TRACY.L.1300415110 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CURRY-BUMPASS.TRACY.L.1300415110 Date: 2017.02.16 13:27:48 -08'00'

Attachment 8 16 Feb 17

5. Description of Proposed Action and Alternatives.

Alternative 1) Install new caternary lightning protection system for building 475. This is the preferred option. Include surge arrestors for any antennas which do not currently have them. The site also has a propane tank which supplies fuel to a generator. If this is to remain, it will also need a small LPS.

Alternative 2) Install an LPS system on building 475 with air teminals mounted on the roof. Include surge arrestors for any antennas which do not currently have them. The site also has a propane tank which supplies fuel to a generator. If this is to remain, it will also need a small LPS.

V1

AF IMT 813, SEP 99, CONTINUATION SHEET

PAGE OF PAGE(S)

30 CES/CEIE ENVIRONMENTAL COMMENT FORM

DOCUMENT AUTHOR: 30 CEI Staff DOCUMENT TITLE: 813- COMMENTOR: Multiple DATE OF COMMENTS:

ITEM

NO. STAFF COMMENT

1 Ryan (Cultural) 805-605-0748

No cultural resources issues or concerns.

2 Evans (Natural) 805-606-4198

Trenching comments. OK

3 Lum (Wetlands) 805-606-5299

N/A

4 Harding(Air) 805-606-6863

See General construction comments below

5 Wiskowski (Clean Water Act – 401, 402) 805-606-7541

No concerns

6 Kalata (Drinking Water/Wastewater) 805-605-0342

No comments.

7 Naputi (Greenhouse gases/Ozone Depleting Substances/Tanks) 805-606-2068

No comments.

8 Narciso (Hazardous Materials) 805-605-7573

Contractors and sub-contractors must submit all hazardous materials including pesticides or herbicides with current Safety Data Sheet (SDS) for registration and approval thru HAZMART Environmental Support, Bldg 5500, Bay "C", Room 10, and telephone number

(805) 605-3870, 605-4786 or 605-7573. Current SDS must be a least earlier than five years old. References: AFI 32-7086, VAFB Air permit, EO 13423 and 40 CFR Part 372, Section 313.

9 Carson (Hazardous and Solid Waste) 805-606-2359

No comments or concerns.

10 Newberry (Installation Restoration Program/Military Munitions Response Program) 805-605-0408

Any ground penetrations require Weapons Safety coordination. No IRP concerns.

ITEM

NO. STAFF COMMENT

11 Naputi (asbestos/lead based paint) 805-606-62068

See attachments for information on asbestos in and around building 475

12 Kaisersatt/Curry (Coastal Zone Resources) 605- 0392/606-2044

The proponent for this action is responsible for implementing all applicable management requirements identified in the referenced Environmental comments attached. If the proponent is unable to accommodate these requirements, the proposed action will require additional environmental analysis and this CATEX will not apply.

Air Quality Comments General Construction Activities

1. Any portable equipment powered by an internal combustion engine with a rated horsepower of 50 bhp or greater used for this project must be registered in the California State-wide Portable Equipment Registration Program or have a valid Santa Barbara County Air Pollution Control District Permit to Operate. Examples of such equipment are portable generators, compressors and light-carts. Copies of each registration or permit along with fuel usage and hours of operation must be submitted to the 30 CES/CEIEC Air Quality section at the end of the project or by 15 January, whichever occurs first.

2. Off-road construction equipment must be compliant with all Federal, State and local regulations. A description of each piece of equipment to include make, model, serial number and rated brake- horsepower along with fuel usage and hours of operation must be provided to the 30 CES/CEIEC Air Quality section at the end of the project or by 15 January, whichever occurs first.

3. The following Santa Barbara County APCD Rules apply (copies of these rules can be obtained at www.sbcapcd.org or by contacting the 30 CES/CEIEC Air Quality Section):

201. Permits Required (contact 30 CES/CEIEC Air Quality Section to determine applicability)

302. Visible Emissions;

303. Nuisance;

304. Particulate Matter Northern Zone;

306. Dust and Fumes Northern Zone

311. Sulfur Content of Fuels

317. Organic Solvents

321. Solvent Cleaning Operations

323.1. Architectural Coatings

324. Disposal and Evaporation of Solvents

329. Cutback and Emulsified Asphalt Paving Materials

345. Control of Fugitive Dust from Construction and Demolition Activities

353. Adhesives and Sealants

4. Contractor must be enrolled in the Hazardous Material Pharmacy and all hazardous materials must be barcoded. Hazardous materials include paints, coatings, adhesives, sealants, solvents, asphalt, etc.

5. Abrasive blast materials must be certified by the California Air Resources Board. Total amount of abrasive material used must be submitted to the 30 CES/CEIEC Air Quality Section at the end of the project or by 15 January, whichever occurs first.

Standard Comments, Natural Resources Trenches and Pits

Animals including (but not limited to) the California red-legged frog are protected by the U.S. Endangered Species Act of 1973 (as amended).

“Harm” or “harassment” to these species is a violation of Federal law.

Trenches and pits must be maintained at the end of each work day to prevent wildlife from falling in; three options

Filled in at end of day Covered upon completion of work each day.

Dig or install “ramps” every 50 feet (a sloped cut or board or stick placed to allow animals to climb out)

In areas specifically identified by 30 CES/CEIEA as likely or known occupancy of threatened or endangered species, a biological monitor may be required. Monitor may or may not require pre-approval by 30 CES/CEI and/or the U.S. Fish and Wildlife Service, potentially including possession of a current section 10(a)(1)(A) recovery permit.

Rhys Evans 30 CES/CEIEA Natural Resources

(805) 606-4198

Vandenberg AFB Asbestos Inventory

Report Files: Assessment Area(s):

Facility Summary Report:

Status: Latitude:

Longitude:

Facility Manager:

Environ. Contact:

Phone:

Phone:

Occupied 34.609443

-120.562192

475Photo File Name:

Date Constructed: Square Footage:1964 21,134

Facility Number: Facility Name:475 Msl/Space Rsch Tst

Facility Owner: InDyne, Inc. / WROCI

23 homogeneous sampling areas were identified and 82 samples were collected. Assessment Area A. Administrative Area: 8 Miscellaneous Materials were suspected of containing asbestos; no TSI or Surfacing Material were suspected. Assessment Area B. Communication Room/Television Area: 10 Miscellaneous Materials were suspected of containing asbestos; no TSI or Surfacing Material were suspected. Assessment Area C. Mechanical Room: 2 TSIs were suspected of containing asbestos; no Surfacing or Miscellaneous Material were suspected. Assessment Area D. Boiler Room: No asbestos detected. Assessment Area E. Exterior: 1 TSI and 1 Miscellaneous Material were suspected of containing asbestos; no TSI were suspected.

ID: Location(s):

A Administrative Area

B Communication Room/TV Area

C Mechanical Room D Boiler Room

E Exterior

Asbestos Containing Material (ACM) Results:

Area ID HSA ID: HSA Type: % Asb. Type:Year:

001 7%9 in. x 9 in. Beige Floor Tile ChrysotileA 1995

002 10%Mastic Beneath Beige Floor Tile ChrysotileA 1995

003 3%9 in. x 9 in. Tan Floor Tile ChrysotileA 1995

004 5%Mastic Beneath Tan Floor Tile ChrysotileA 1995

005 0%12 in. x 12 in. Cream Floor Tile None DetectedA 1995

006 0%Mastic Beneath Beige Tile None DetectedA 1995

007 0%9 in. x 9 in. Green Floor Tile None DetectedA 1995

008 1%Mastic Beneath Green Floor Tile ChrysotileA 1995

012 2%12 in. x 12 in. White Floor Tile, Raised Floor ChrysotileB 1995

013 15%Mastic Beneath White Floor Tile ChrysotileB 1995

014 2%1 ft. x 1 ft. Acoustical Tile with Small Holes AmositeB 1995

015 0%2 ft. x 4 ft. Ceiling Tile w/Small Holes None DetectedB 1995

016 0%2 ft. x 4 ft. Fissured Ceiling Tile None DetectedB 1995

017 0%12 in. x 12 in. Tan Floor Tile None DetectedB 1995

018 0%Wallboard None DetectedB 1995

019 1-10%9 in. x 9 in. Camel/Brown Floor Tile ChrysotileB 1995

020 1-10%Mastic Beneath Camel/Brown Floor Tile ChrysotileB 1995

021 0%2 ft. x 2 ft. Fissured Ceiling Tile None DetectedB 1995

009 0%Lagging Over Pipe Insulation None DetectedC 1995

011 20%Fittings on Water Piping ChrysotileC 1995

018 0%Wallboard None DetectedC 1995

Bldg475B.PDF bldg475.pdf

Bldg475.pdf

00475_635.TIF

Reference: Volume 3, Pacific Environmental Services, Inc., April 1993.

000 0%None Suspected None DetectedD 1995

022 40%Transite Panels ChrysotileE 1995

023 0%Pipe Insulation Debris None DetectedE 1995

File details come from the government source that posted it. Updated .