Replace Waterline at Space Launch Complex (SLC) 2 Federal contract opportunity
Solicitation number
FA4610-15-R-0006
Issued by
Department of the Air Force Space Command

About this file

Specs

View the file

Other files for this federal contract opportunity

Other files attached to Replace Waterline at Space Launch Complex (SLC) 2, newest first.
File Type Posted
Questions_and_Answers.docx DOCX document
FA4610-15-R-0006-0001.pdf PDF
SLC-2_Area_Utilities.pdf PDF
FA4610-15-R-0006_Conformed_Through_Amendment_0001.pdf PDF
Att_4_RMDF.pdf PDF
Att_5_DBA_CA150023_2_Feb_15.pdf PDF
Att_3_35percent_Design_Drawings 1 .pdf PDF
Att_1_SOW_XUMU131186B1_WaterlineSLC2.pdf PDF
FA4610-15-R-0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

35 PERCENT PRELIMINARY DESIGN

WATER SYSTEM REPLACEMENT PHASE 1

FOR NORTH VANDENBERG AIR FORCE BASE

VANDENBERG AFB PROJECT NO.: XUMU 11-1049B1

AFCEC PROJECT NO.: VAND-12-S-3618

TECHNICAL SPECIFICATIONS

REDDING, CALIFORNIA

May 2013

Attachment 2 FA4610-15-R-0006

FOR NORTH VANDENBERG AIR FORCE BASE

VANDENBERG PROJECT NO.: XUMU 11-1049B1

AFCEC PROJECT NO.: VAND-12-S-3618

TABLE OF CONTENTS

MAY 2013 00 01 10 - III

TABLE OF CONTENTS

Pages

TECHNICAL SPECIFICATIONS

DIVISION 1—GENERAL REQUIREMENTS

01000 General Requirements (Vandenberg Spec) .............................. 1- 9

01001 Contractor Project Management System (Vandenberg Spec) .. 1- 4

01440 Contractor Quality Control (Vandenberg Spec) ...................... 1- 7

01 43 33 Manufacturer’s Field Services ................................................. 1- 3

Supplements:

• Manufacturer’s Certificate of Compliance

• Manufacturer’s Certificate of Proper Installation

01 50 00 Temporary Facilities and Controls ........................................... 1- 13

01 57 20 Environmental Protection (Vandenberg Spec) ........................ 1- 51

DIVISION 2—EXISTING CONDITIONS

02 41 00 Demolition ............................................................................... 1- 6

02 40 00 Union Pacific Railroad Tunneled Crossing (Not Included in

35 Percent Design)

DIVISION 3—CONCRETE

03 21 00 Reinforcing Steel ..................................................................... 1- 5

03 30 00 Cast-in-Place Concrete ............................................................. 1- 15

Supplement:

• Concrete Mix Design, Class 4500F2S1P1C1

03 39 00 Concrete Curing ....................................................................... 1- 3

DIVISION 31—EARTHWORK

31 10 00 Site Clearing ............................................................................. 1- 3

31 23 16 Excavation................................................................................ 1- 5

31 23 23.15 Trench Backfill ........................................................................ 1- 10

31 41 00 Shoring ..................................................................................... 1- 2

FOR NORTH VANDENBERG AIR FORCE BASE

Pages

TABLE OF CONTENTS

00 01 10 - IV MAY 2013

DIVISION 32—EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses ........................................................... 1- 4

32 12 16 Asphalt Paving ......................................................................... 1- 9

DIVISION 33—UTILITIES

33 05 01 Conveyance Piping—General .................................................. 1- 10

33 05 01.10 High-Density Polyethylene (HDPE) Pressure Pipe and Fittings ............................................................................... 1- 9

33 12 13 Water Service Connections ...................................................... 1- 12

33 12 16 Water Utility Distribution Valves ............................................ 1- 4

33 12 16.29 Air and Vacuum Release Valve Assemblies ............................ 1- 5

33 12 19 Water Utility Distribution Fire Hydrants .................................. 1- 3

33 13 00 Disinfection of Water Utility Distribution Facilities ................ 1- 5

DIVISION 34—49 (NOT USED)

DRAWINGS (BOUND SEPARATELY)

END OF SECTION

TECHNICAL SPECIFICATIONS

8 Oct 04 Revision

01000-1

SECTION 01000

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.01 PROJECT DESCRIPTION

A. The Project consists of furnishing all labor, materials, and equipment in connection with the Water

System Replacement Phase 1 Project at Vandenberg Air Force Base, California.

B. The Work is briefly described as follows, but is not the entire scope of the Project:

1. Installation of a new water main and associated appurtenances extending approximately 6 miles between California Boulevard (Point of Connection) and the terminus of Tangair Road.

2. Installation of a new water main and associated appurtenances extending approximately 2 miles between Tangair Road and an existing water main on Cross Road near Facility 1768.

3. Miscellaneous water distribution systems (including pipe and appurtenances) to replace the existing distribution system supplied from the Tangair Road water main (northwest of California Boulevard).

1.02 WORK PLAN:

A. The Contractor shall submit a Work Plan in accordance with this section.

B. Work Plan shall include at a minimum:

1. Detailed schedule representing Contractor’s as-planned approach to accomplishing the Work. Include interim milestones dates, Contract completion date, and other time constraints specified in Contract Documents.

2. Unexploded Ordinance (UXO) surveillance and training:

a. Plan requirements to be coordinated with Contracting Officer and 30 SW/SEW.

3. Description of the type and number of equipment to be used and estimated number of personnel onsite to execute the Work.

4. Coordination and notification plan, including how all residents, local officials, and other Project personnel will be notified of the Work.

5. Detail description of the sequence of pipe installation and replacement and associated provisions to maintain utility services during construction. Describe provisions to minimize utility service interruptions and associated impacts.

01000-2

6. Waste Management Plan addressing the as-planned approach with respect to the following:

a. Recycling construction waste

b. Housekeeping during construction

c. Dumping and cleaning concrete trucks

d. Disposing of non-hazardous waste material

e. Disposing of hazardous waste material

1.03 OCCUPANCY:

A. The Project Site(s) will be occupied by base personnel during construction operations. Contractor shall maintain access to facilities at all times.

1.04 WORK SCHEDULE

A. Working hours will normally be between the hours of 7:30 a.m. and 4:30 p.m., excluding

Saturdays, Sundays, and federal holidays. If the Contractor desires to work during periods other than above, he shall make his request to the Contracting Officer 3 workdays in advance. If Government inspection forces are not required or such forces are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days; however, if Government inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract price may be made periodically as directed by the Contracting Officer.

1.05 MANDATORY WORK STOPPAGES

A. A mandatory work stoppage occurs whenever the Contractor is restricted from working a full workday and is unable to reallocate work forces to other locations. All costs associated with five mandatory work stoppages must be included in the Bid price. No additional compensation or extension to the Contract performance period will be given as a result of five mandatory work stoppages.

B. The Contractor may be required, without advance notice, to move work to a different location.

The Contractor shall be prepared to increase or decrease his work forces with appropriate trades to perform work in the relocated work areas at no additional cost to the Government.

C. The Contractor shall notify the Contracting Officer when a mandatory work stoppage occurs for recording purposes; otherwise, the work stoppage will not be credited to the Contractor.

1.06 SECURITY

A. The Contractor shall obtain all passes, badges, decals, or other identification media required for security clearance to areas where work is performed. Obtain vehicle and individual identification media at the Pass and Registration Section, 30 SW/SFAM, Building 11777, (805) 606-1853.

Identification media shall be surrendered to the Pass and Registration Section upon termination of the Contract, or termination of an individual's employment with the Contractor.

INSERT THE NEXT PARAGRAPH IF THE WORK IS IN A

MILITARY RESTRICTED OR CONTROLLED AREA, EXCLUDING

SLC-4 PROJECTS, REQUIRING THE CONTRACTOR TO OBTAIN

ESCORTS WITH THE APPROPRIATE CLEARANCE. DELETE

THIS PARAGRAPH FOR SLC-4 PROJECTS.

B. The work to be performed is in a military restricted or controlled area. The Contractor must comply with the entry control policies for the area. The Contractor and its employees are required

01000-3 to have at least a National Agency Check. In the event the Contractor cannot comply with the investigative or clearance requirement, it is the responsibility of the Contractor to obtain escort officials who are authorized unescorted entry to the work area.

It is also the Contractor's responsibility to coordinate with the appropriate security officials at each construction Site at least 5 workdays prior to start of Contract performance. For information on security services, contact Personnel Security Section, 30 SFS/SFAI, 5-0766. The Contractor shall provide enough escort officials for uninterrupted visual surveillance within 50 feet of all individuals not having required security clearance performing work as part of the Contract.

INSERT THE NEXT PARAGRAPH FOR SLC-4 PROJECTS ONLY.

C. The work to be performed is in a controlled area. The Contractor must comply with the entry control policies for the area. It is the responsibility of the Contractor to obtain escort officials who are authorized unescorted entry to the work area. It is also the Contractor's responsibility to coordinate with the area office of primary responsibility (OPR) at least 5 workdays prior to start of Contract performance. For information on security services, Contractor may contact

30 SFS/SFO, 5-2807; 4 SLS, 5-4352; or 30 CONS/LGCZ, 6-3873.

INSERT THE NEXT PARAGRAPH IF THERE ARE MULTIPLE

CONSTRUCTION SITES WITH DIFFERENT ESCORT

REQUIREMENTS.

D. Security escort requirements are identified for the following buildings in this Contract:

Bldg # Security Escort Requirements XXXXX Security Escort Required XXXXX No Security Escorts Required

1.07 UTILITIES

A. Utilities directly required to complete the Contract will be provided, if available, to the Contractor without charge. Any temporary connections or lines that are required shall be installed, maintained, and removed by the Contractor at his own expense and in a manner satisfactory to the Contracting Officer. Before any temporary connections are made, the Contractor shall obtain approval from the Utility Shop (30CES/CEOIU, 606-5885) for gas, water and sewer connections and Exterior Electric (30CES/CEOIE, (805) 606-6434) for electrical connections. Contractor shall remove temporary utilities before final acceptance.

B. Schedule all utility outages and secure approval of these outages from the Contracting Officer at least 5 work days in advance of the outage.

1.08 SAFETY

A. Contractor shall observe all safety and fire regulations as presently enforced at Vandenberg AFB.

The construction shall be in accordance with the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, and Occupational Safety and Health Act (OSHA) Public

Law 91-596. Comply with OSHA and Air Force Occupational Safety and Health (AFOSH) safety standards.

B. All construction Sites are subject to fire and safety inspections without notice. Any violation of fire and safety standards may result in a work stoppage at the expense of the Contractor.

C. Contractor shall hold a safety briefing for all Subcontractors and craftsmen prior to construction or demolition. This briefing shall be for the specific purpose of making all personnel aware of

01000-4 asbestos and/or lead-based paint issues that may be encountered during demolition and/or renovation even though the Project may not seemingly involve disturbance of those substances.

1.09 COORDINATION FOR WORK CLEARANCE REQUEST (AF Form 103)

A. The Contractor shall obtain and process a Form 103, Coordination For Work Clearance Request, for all work, especially digging operations, involving utilities, communication cables, or environmental sites. The Contractor can obtain a Form 103 from the 30th Civil Engineering Squadron Administration, 30 CES/CECA, Building 11433, (805) 606-8701.

B. Government agencies will annotate on the Form 103, any special instructions and/or compliance requirements prior to start of any work and/or while work is being accomplished. The Contractor shall implement all requirements indicated on the Form 103. The Contractor shall not begin work until the Form 103 is fully approved. The Contractor shall keep the Form 103 on site from the start of work until construction or Project completion.

C. The Contractor shall coordinate any work/digging operations in the vicinity of utilities and communication cables with the 30th Civil Engineer Squadron Infrastructure Maintenance Engineering Utility Shop, 30 CES/CEOIU, and the 30th Communications Squadron, 30 CS. No mechanical digging shall be performed within 4 feet of utilities or communication cables until they are physically exposed by hand digging. If a utility or communication cable is damaged, notify the Contracting Officer immediately. A minimum of a 24-hour advance notice for both 30 CES/CEOIU utility monitors, (805) 606-5885, and 30 CS communication monitors, (805) 606-7534, are required. Work shall not begin until the required 30 CES utility or 30 CS communication monitors are present. Additionally, during the 48-hour period prior to a launch operation, Contractors shall cease excavation work when they are within 15' of known communication lines as identified on the approved Form 103.

D. The Contractor shall coordinate all work with the 30th Civil Engineer Squadron's Asset

Management Flight, 30 CES/CEA, Building 11146. The Contractor shall coordinate the Form 103 with the Asset Management Flight, a minimum of ten (10) workdays prior to any work/digging operations. Environmental monitors may be required and must be qualified and/or certified.

Qualifications are subject to approval by 30 CES/CEA. 72-hours advance notice for approval of environmental monitors is required. Work shall not begin until all required CEA approved environmental monitors are present.

1.10 WELDING PERMIT: Any welding or torching on Vandenberg AFB requires a welding permit. The Contractor shall obtain a welding permit from the Fire Protection Flight, 30 CES/CEF, Building 10660, 6-5380. A permit will be issued within 2 workdays with instructions for welding fire prevention.

1.11 SUBMITTALS

A. After notification of Contract award and prior to purchasing any materials, submit to the

Contracting Officer for approval three copies of all items listed on AF Form 66, Schedule of Material Submittals (see Attachment 1), with one AF Form 3000, Material Approval Submittal, for each submittal. For the purpose of this statement, all entries included on a single AF Form 3000 are considered to be one submittal. Materials, shop drawings, manufacturer’s recommendations, etc., shall not be incorporated into the resultant Contract work until approved by the Contracting Officer or his Authorized Representative.

01000-5

B. The following definitions set forth the minimum requirements for the type submittal listed on the AF Form 66 (Atch 1) and as further delineated under each section of the specifications:

1. CERTIFICATION OF COMPLIANCE:

a. Manufacturer’s Certification. Submit manufacturer’s certification that products meet or exceed specified requirements.

b. Testing Laboratory Services. Contract with an independent testing laboratory to perform inspections, tests, and other services, in accordance with specified standards. Notify the Contracting Officer 24 hours prior to commencement of testing services.

c. Letter of Compliance. Submit letter stating that materials meet drawings and specifications. Include applicable referenced standards.

2. SHOP DRAWINGS. Submit opaque reproductions.

3. SAMPLES. Submit one set of the full range of manufacturer’s standard colors, textures, and patterns, unless otherwise indicated. Include the identification of each sample, giving full information. Samples may be retained until the completion of the Contract.

4. COLOR SELECTION. Provide field samples of finishes completed and finished. Acceptable samples in-place may be retained in completed work.

5. MANUFACTURER’S RECOMMENDATIONS. Submit manufacturer’s printed instructions for delivery, storage, assembly, installation, adjusting, and finishing.

6. MANUFACTURER’S WARRANTY. Submit all manufacturer’s warranties given to the

Contractor for products used in the Contract.

7. CATALOG DATA. Mark each copy to identify applicable products, models, options, and other data; supplement manufacturer’s standard data to provide information unique to the work.

INSERT THE NEXT PARAGRAPHS 1. 10.E.8, E.9, AND E.10, AS

APPROPRIATE. THESE PARAGRAPHS ARE REQUIRED FOR

ALL SLC-4 PROJECTS. RECOMMEND THESE PARAGRAPHS

FOR PROJECTS WITH EQUIPMENT REQUIRING

MAINTENANCE. VERIFY THESE PARAGRAPHS ARE

REFERENCED IN THE SPECIFIC SECTIONS SPECIFYING THE

EQUIPMENT.

8. OPERATIONS AND MAINTENANCE MATERIAL REQUIREMENTS:

a. The Contractor shall identify all parts, materials, and consumable items required by the original equipment manufacturer to operate and maintain the system (as indicated in vendor data) in its installed operating environment for a 12-month period. These items shall be identified on a list by true manufacturer's part number, manufacturer's name, nomenclature, and all technical specifications or other identification required by the manufacturer to identify the individual items for reprocurement. Include the name, address, and phone number of authorized suppliers of each item on the list.

b. Contractor shall provide a card, encased in plastic, that lists all routine maintenance requirements that will not violate the manufacturer’s warranty during the above described 12-month period. The card shall also list the Contractor’s name and telephone number, and the Civil Engineering POC for the project. These cards, once prepared, shall be securely tie-wrapped to each new piece of equipment installed as a part of the Contract.

01000-6

9. SYSTEM OPERATING MANUALS AND EQUIPMENT OPERATING, MAINTENANCE, AND

REPAIR MANUALS: The Contractor shall provide operating, maintenance, and repair manuals for all systems provided under this Contract as specified below. The preparation of the manuals shall be a continuing process from the Notice to Proceed to construction completion. The Contractor shall meet every 4 weeks throughout the life of the Contract with the Contracting Officer to demonstrate progress update on the preparation of the manuals.

a. The manuals shall be submitted for approval within 90 days after approval of the submittal for the items proposed for procurement unless stated otherwise in the Technical Specifications. Four bound sets of manuals with original factor/vendor data (not reproduced copies of the data) plus six bound sets of manuals with reproduced copies of this data shall be provided. (A draft copy of the manuals shall be made available to the Government at least 30 days prior to approval). Each manual shall include the following:

(1) Hard Cover Binders. The manuals shall be bound in a 3-ring binder with a hard cover. The following identification shall be inscribed on the cover, the words

"OPERATING MANUALS AND EQUIPMENT OPERATING, MAINTENANCE, AND

REPAIR MANUALS", and the building name and number, location, and indication of utility or system covered. Manuals shall be approximately 8-1/2" x 11", with large sheets folded and capable of being easily pulled out for reference.

(2) Warning Page. A warning page shall be provided to warn of potential dangers (if they exist), such as high voltage, toxic chemicals, flammable liquids, explosive materials, carcinogens, or high pressures. The warning page shall be placed inside the front cover, in front of the title page.

(3) Title Page. The title page shall show the name, address, and phone number of the

Contractor, the Contract number, and the date of publication.

(4) Table of Contents. Provide in accordance with standard commercial practice.

b. General. Manuals shall include, in separate sections, the following information for each item of equipment and system:

(1) Performance sheets and graphs showing capacity data, efficiencies, electrical characteristics, pressure drops, and flow rates. Marked-up catalogs or catalog pages do not satisfy this requirement. Performance information shall be presented as concisely as possible and contain only data pertaining to equipment actually installed.

(2) Catalog cuts showing application information.

(3) Installation information showing minimum acceptable requirements.

(4) Operation and Maintenance Requirements. Include adequate illustrative material to identify and locate operating controls, indicating devices, and locations of areas or items requiring maintenance.

(a) Describe, in detail, starting and stopping procedures for components, adjustments required obtaining optimum equipment performance, and corrective actions for malfunctions.

(b) Maintenance instructions describing the nature and frequency of routine maintenance and procedures to be followed. Indicate any special tools, materials, and test equipment that may be required.

01000-7

(c) For air conditioning systems, temperature control, and HVAC distribution systems, central heating plants, and district heating distribution systems, system information shall be provided on all operating conditions including normal operations, hazardous operations, and emergency exhausts.

(5) Repair information including diagrams and schematics, guidance for diagnosing problems, and detailed instructions for making repairs. Provide troubleshooting information that includes a statement of the indication or symptom of trouble and the sequential instructions necessary. Include test hookups to determine the cause, special tools and test equipment, and methods for returning the equipment to operating conditions. Information may be in chart form or in tabular format with appropriate headings.

(6) Parts list and names and addresses of the two closest parts supply agencies.

(7) Names and addresses of the local manufacturer's representatives and the parent company.

(8) A copy of all written materials used in the classroom and field training.

c. Operating and Maintenance (O&M) Equipment Data. Data to be provided for each equipment item: The O&M data to be submitted for each item of equipment shall include, but not be limited to, the items listed below. Separate sets of O&M data will not be required for identical pieces of equipment installed within a single major system.

(1) Equipment Description. Shall include item name, model number, part number, equipment price (FOB mfg.), electrical and/or mechanical characteristics, manufacturer's name and address, order number, and all other data found on the equipment data/nameplates.

(2) Component and Assemble Drawing/Master Parts List. Shall contain exploded views and/or master parts lists clearly identifying all parts and subassemblies by manufacturer's part number. Master parts lists shall also include price for each part (FOB mfg.).

(3) Control Diagrams and Sequences of Operations. Shall include operating instructions

(including normal start up, normal shutdown, and emergency shutdown, as applicable).

(4) Performance Characteristics. Shall include performance curves for full range of operation.

(5) Installation Instructions. Shall include adjustment and alignment procedures, checkout procedures, and test procedures.

(6) Preventive Maintenance Procedures. Shall include inspection, cleaning, adjustment, service, and lubrication instructions. A schedule shall be furnished for each piece of equipment listing manufacturer's recommended maintenance routine of specific tasks to be performed at specific intervals such as daily, weekly, monthly, quarterly, or based on the number of operating hours. Preventive maintenance schedules shall take into account operating conditions at Vandenberg AFB, California.

(7) Corrective Maintenance Procedures. Shall include instructions for troubleshooting, repair, overhaul, and calibration.

01000-8

(8) Special Items. List of special tools, special test equipment, hazards, and safety precautions shall be provided. Special item lists shall include price for each item (FOB mfg.). Whenever special tools and equipment are required to be provided, by the Technical Provisions or are normally provided by the manufacturer with the equipment, the Contractor shall annotate them on the lists. Items listed shall be turned over to the Contracting Officer.

(9) Recommended Spare Parts List. Shall contain the manufacturer's recommendation for 1-year spare parts stock lever. These are primary spares at the "line replaceable units" level to facilitate minimal system downtime by enabling rapid removal/ replacement of failed components. True manufacturer's part number, manufacturer's name, nomenclature, all technical specifications, or other identification required by the manufacturer to uniquely identify an individual part for reprocurement, price, lead time, and shelf time for each individual part shall be furnished.

(10) Manufacturers. Shall include names, addresses, and telephone numbers of all manufacturers whose parts appear on the recommended spare parts list and shall be attached to the recommended spare parts list.

(11) Authorized Parts Suppliers. Shall include names, addresses, telephone and telex numbers of authorized parts suppliers of the equipment.

(12) Extended Warranties. Shall identify the availability and costs of extended warranties.

1.12 RECORD DRAWINGS

A. Maintain a clean, undamaged set of Contract drawings and shop drawings. Mark the set to show the actual installation where it varies substantially from the work as originally drawn. Mark whichever drawing is most capable of showing conditions fully and accurately. Where shop drawings are used, record a cross-reference note or number at the corresponding location on the Contract drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date.

1. Mark record sets with red erasable pencil.

2. Mark new information that is important to the Government, but was not shown on Contract drawings or shop drawings.

B. Submit 7 days prior to final inspection, one set of marked-up Contract drawings and one set of marked-up shop drawings.

C. Approved redlined drawings will be returned to the Contractor, along with AutoCAD diskette

(Release 2000) of the original drawings. All work on the diskette will be accomplished by a Certified Engineering Technician and/or individuals with a minimum of five years drafting experience, at least three of which must be using AutoCAD. The name of these individuals shall be submitted in writing to the Contracting Officer. Modifications to the diskette shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing. On each sheet the words “AS-BUILT” in block letters will be added to the disks. The size of the letters will be at least 3/8 inches high and be placed either above the title block or to the left of the title block. Fill in the revisions block with ‘REVISED AS-BUILT,” date and initials. The submittal shall include the revised AutoCAD diskette, the approved “Red Line” drawings and a full size plot of the drawings from the revised diskette.

As-builts will be returned to the Contracting Representative within (2, 3, 4) weeks of receipt of the Master AutoCAD diskette.

01000-9

1.13 GLOBAL POSITIONING SYSTEM (GPS) REQUIREMENTS

A. Prior to contract completion the Contractor must submit accurate field-verified maps of the utility system being installed or replaced. Once the utility has been installed accurate field-verified locations must be captured. The Contractor is responsible for collecting Global Positioning System coordinates by physically walking the line with a GPS unit.

B. The objective is to obtain exact locations of the installed infrastructure including transformers, manholes, valves, data on the type and size of the utility line, etc. Each turn or bend in the utility line must be captured. If a new building is constructed, the Contractor is required to provide GPS data on the building footprint and all utilities serving the building that were installed by the Contractor.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

XUMU 01001-1

1 Oct 98 Revision

SECTION 01001

CONTRACTOR PROJECT MANAGEMENT SYSTEM

PART 1 - GENERAL

1.01 INTRODUCTION

A. The Contractor Project Management System is included to assure adequate planning and execution of the work, to assist the Contracting Officer in appraising the reasonableness of the schedule, to evaluate progress of the work, to make progress payments, and to make decisions relative to time and/or cost adjustments which may result from changes in the work.

B. The management system is to be based on a network analysis (Critical Path Method) managed by on-site personnel. On-site management shall be capable of using the system to address all project activities and resources on a real time interactive basis and be capable of rapidly evaluating alternative scenarios which will optimize project management. Evidence of technical expertise of on-site personnel with the proposed Network Analysis System shall be submitted for Contracting Officer's approval prior to any on-site work.

C. The Contractor Project Management System is to be staffed and prepared pursuant to Contract clause: Schedules For Construction Contractor, and Contract clause: Superintendence By Contractor. In preparing this system the Contractor assumes responsibility for conformance with Contract requirements, planning, sequencing of work, and determining the construction means and methods.

1.02 BASIC SYSTEM REQUIREMENTS

A. The Network Analysis System (NAS) must be capable of providing the following minimum on-site services: network analysis by I, J, or precedence notation; progress and cost reports; network comparisons; super- and sub-networks; resource reporting; report writer allowing flexible formatting and summarization; and graphical output. In preparing the NAS, the Contractor shall ensure that it represents an accurate and efficient plan for accomplishing the work.

B. The Contractor's project management system must be capable of at least weekly update and production of physical update reports, percent complete reports, and cost reports for payment purposes. Management effort required will include capability to analyze factors delaying progress and altering logic and durations on an interactive up-to-date basis to maintain an active weekly management schedule.

1.03 DETAILED SYSTEM REQUIREMENTS

A. The system shall consist of diagrams and accompanying mathematical analysis. Flexibility of formatting and summarization of reports will be provided by selecting and prioritizing from the following menu of information: identifying activity number (Precedence System) or numbers (I, J), duration in work days, activity description, code relating to party responsible to perform work, cost, manpower, estimate or labor hours, list of major items of construction equipment usage anticipated, cost item or pay item activity is associated with, milestones, identification of subnet when applicable, early start date, late start date, early finish date, late finish date, anticipated start date, and a list of all activities that precede or follow each activity.

XUMU 01001-2

B. Windowing (chronologically selected portions of the network) specified for reports or diagrams must be possible. A network information report, listing the information contained in the reference menu and logic diagram, will be provided for the initially approved network as well as each update, which incorporated a logic change.

C. In addition to construction activities, the schedule shall include activities for submittal of materials, samples, shop drawings, operation and maintenance manuals, master equipment lists, spare parts lists, and other related documents. Also, included shall be activities for the procurement of all major materials and equipment, including fabrication and delivery, installation and testing. Of particular interest shall be those material and equipment procurement items that are expected to be critical to the progress of actual construction. Activities of the Government indicating reviews and approvals of materials, equipment, testing, and other actions that affect the progress shall be shown.

D. The Contractor shall resource-load all relevant activities. As a minimum, resource loading shall identify equipment, management, and skilled and unskilled labor requirements. The Contractor may, at his option, decide on greater detail for his own purposes, but if this option is elected, the system must be able to consolidate resources into the above-defined categories for use by the Contracting Officer.

E. The Contractor shall incorporate any and all milestone- and Contract-required events, which may be specified elsewhere within these specifications. Should milestone events be not specifically identified by the Government within these specifications, the Contractor shall identify at least 5 percent of the network activities and designate them as milestone activities.

F. Logic Diagrams:

1. Logic diagrams shall show the order and interdependence of activities and the sequence in which the work is to be accomplished as planned by the Contractor.

2. Detailed networks need not be time-scaled, but drafted to have a continuous flow from left to right, showing how the start of a given activities and how its completion of preceding activities and how its completion restricts the start of the following activities.

3. A logic diagram of the complete project shall be submitted with the initial NAS, showing each activity-identifying numbers, duration, description, with the critical path easily identified.

Update diagrams will be provided as required by logic changed, but not more frequently than the monthly update.

G. In addition to the detailed schedule, a summary schedule shall be developed by the Contractor.

The summary schedule shall consist of a minimum of 30 activities and be updated monthly.

1.04 SUBMISSION AND APPROVAL

A. Submission and approval of the system shall be as follows:

1. The Contractor shall submit for review and approval a description of the type and capabilities of the submittal network system proposed to be used. Submission shall be within 30 calendar days after the Award of Contract.

2. The complete network system consisting of the detailed network mathematical analysis

(including on-site manpower loading schedule and equipment schedule) and network diagrams shall be submitted for approval within 10 calendar days after receipt of Notice to Proceed.

XUMU 01001-3

3. The Contractor shall participate in a review and evaluation of the proposed network diagrams and mathematical analyses by the Contracting Officer. Any revisions necessary as a result of this review shall be resubmitted for approval of the Contracting Officer within 3 calendar days after the conference. The approved schedule shall be used by the Contractor for planning, organizing and directing the work, reporting progress, and requesting payment for work accomplished.

1.05 NETWORK MODIFICATIONS

A. In those cases where the Contract performance is delayed due to causes beyond the control of the Contractor, a time extension may be allowable under one or more of the Contract clauses entitled CHANGES, DIFFERING SITE CONDITIONS, DEFAULT (Fixed-Price Construction), SUSPENSION OF WORK, or other applicable clauses, as a condition precedent to granting a time extension, the Contractor shall submit a time proposal in such format as to identify the specific subnet diagram and activities affected.

B. Change order proposals shall include description or listing of all proposed changes to the network, by activity, and demonstrate the affect on the Contract required completion date. A complete list of activities changed and a subnet of activities affected by the change shall be submitted.

C. "Float" or "slack" is defined as the amount of time between the early start date and the late start date, or the early finish date and the late finish date, of any of the activities in the NAS schedule.

Float or slack is not time for the exclusive use or benefit of either the Government or the Contractor. Extensions of time for performance may be granted to the extent that equitable time adjustment for the activities affected exceed the total float or, where otherwise justified, affect on the Contract completion can be shown. The Contract completion date is fixed, and will be amended only by modifications that include time and are signed by the Contracting Officer.

D. Rapid resolution of change orders and the granting of other time extensions, where authorized by the Contracting Officer, are a critical part of the overall management system. Implementation of all justified activity and logic changes shall be made and reflected in the next update after approval of the Contracting Officer.

E. If, in the opinion of the Contracting Officer, the current schedule no longer accurately reflects the

Contractor's real plan for accomplishing the work or no longer reflects a viable way of finishing the work on schedule, the Contractor shall be directed to revise the schedule and submit it for approval within 7 calendar days of direction.

1.06 REPORTS

A. After the network approval, the Contractor shall review and evaluate the actual progress with the

Contracting Officer's Representative on a periodic basis and submit any updated weekly reports 3 workdays after the meeting.

B. Monthly update reports will be submitted at mid-month showing current status and actual start and finish dates of project activities, and will be capable of comparing the current status with the approved base schedule. Each monthly update report shall be stored on the Contractor's computer until the final pay estimate is processed. The content of the monthly update shall be flexible to show items listed in the menu. The mid-month report shall be used for partial payments.

C. A meeting may be held 3 workdays before the delivery of the mid-month report to discuss all input data. If the Contractor desires to make changes in his method of operation and scheduling, he shall clearly present the proposed changes.

XUMU 01001-4

D. A narrative report shall be submitted with the mid-month report indicating current and anticipated problems, delaying factors, and conditions that are impacting the Contractor's work effort. An analysis showing the reasons for the delay/gain and their impact upon the current schedule shall be included. When it is apparent that scheduled milestones and completion dates will not be met, the Contractor shall propose specific methods he intends to implement to bring the project back on schedule at no cost to the Government. Such measures may include, but are not limited to:

1. Increasing construction manpower in such quantities and crafts as will substantially eliminate the backlog of work effort.

2. Increasing the number of working hours per shift, shifts per workday, workdays per week, the amount of construction equipment, or any combination thereof.

3. Rescheduling of activities to achieve maximum practical concurrency of work efforts.

E. The Contractor shall implement such procedures as may be necessary for the active participation by his subcontractors in preparing and updating the schedule. Subcontractor shall be provided with schedules that identify the interfaces of their work with the work of others. As a minimum, the Contractor shall provide bar graphs to each major subcontractor showing activity times with plots on an early start basis. Copies of these schedules shall also be available to the Contracting Officer. The relationship between subcontractor and interdependency of work shall be managed by the Contractor. When these interdependencies are violated or impaired, the Contractor shall identify the problem, resolve it, and provide the information to the Contracting Officer as part of the monthly report.

1.07 PAYMENT REQUESTS

A. The monthly update report shall be used as a basis for the monthly partial pay estimate. The report will state actual percent complete, and current value of partially completed or completed work.

B. The first payment shall not be made until the preliminary schedule has been approved by the

Contracting Officer and the second payment shall not be made until the Contracting Officer has approved the full schedule. If, in the judgment of the Contracting Officer, the Contractor fails or refuses to provide an approved schedule and other progress data specified, the Contractor shall be deemed not to have provided the required information upon which payments may be made.

C. Activities submitted for payment on AF Form 3065 (Contract Progress Report) shall be based on the approved schedule network activities summarized on AF Form 3064 (Contract Progress Schedule). No payment shall be made for activities conducted in deviation of the approved logic.

D. Payment for activities conducted when previously dependent activities have not been completed or accepted due to quality defects, shall be restricted at the discretion of the Contracting Officer.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

XUMU 01440 - 1

1 Oct 98 Revision

SECTION 01440

CONTRACTOR QUALITY CONTROL

PART I - GENERAL

1.01 REFERENCES

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

1. ASTM D 3740 - (1988) Evaluation of Agencies Engaged in the Testing and/or Inspection of

Soil and Rock as Used in Engineering Design and Construction.

2. ASTM E 329 - (1990) Use in the Evaluation of Testing and Inspection Agencies as Used in

Construction.

1.02 PAYMENT: Separate payment will not be made for providing and maintaining an effective Quality

Control program, and all costs associated therewith shall be included in the applicable unit prices or lump-sum prices contained in the Bidding Schedule.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.01 GENERAL: The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract clause entitled Inspection of Construction. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with the Contract requirements. The system shall cover all construction operations, both on-site and off-site, and shall be keyed to the proposed construction sequence.

3.02 QUALITY CONTROL PLAN

A. GENERAL: The Contractor shall furnish for review by the Contracting Officer, not later than

10 days after receipt of Notice to Proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements of the Contract Clause entitled Inspection of Construction. The plan shall identify personnel, procedures, control, instructions, test, records, and forms to be used.

The Contracting Officer will consider an interim plan for the first 10 days of operation.

Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the features of work included in an accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional features of work to be started.

B. CONTENT OF THE CQC PLAN: The CQC plan shall include, as a minimum, the following to cover all construction operations, both on-site and off-site, including work by subcontractors, fabricators, suppliers, and purchasing agents:

XUMU 01440 - 2

1. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff shall implement the three-phase control system for all aspects of the work specified. The staff shall include a CQC system manager who shall report to the project manager or someone higher in the Contractor's organization. Project manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production.

2. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a QC function.

3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager including authority to stop work which is not in compliance with the Contract. The CQC System Manager shall issue letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities.

Copies of these letters will also be furnished to the Contracting Officer.

4. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, off-site fabricators, suppliers, and purchasing agents.

5. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities will be approved by the Contracting Officer).

6. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

7. Procedures for tracking construction deficiencies from identification through acceptable corrective action. These procedures will establish verification that identified deficiencies have been corrected.

8. Reporting procedures, including proposed reporting formats.

9. A list of the definable features of work. A definable feature of work is a task that is separate and distinct from other tasks and has separate control requirements. It could be identified by different trades or disciplines, or it could be work by the same trade in a different environment.

Although each section of the specifications may generally be considered as a definable feature of work, there is frequently more than one definable feature under a particular section.

This list will be agreed upon during the coordination meeting.

C. ACCEPTANCE OF PLAN: Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in his CQC plan and operations including removal of personnel, as necessary, to obtain the quality specified.

D. NOTIFICATION OF CHANGES: After acceptance of the QC plan, the Contractor shall notify the

Contracting Officer in writing a minimum of 7 calendar days prior to any proposed change.

Proposed changes are subject to acceptance by the Contracting Officer.

3.03 COORDINATION MEETING: After the Preconstruction Conference, before start of construction, and prior to acceptance by the Contracting Officer of the Quality Control Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, XUMU 01440 - 3 administration of the system for both on-site and off-site work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the Contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures that may require corrective action by the Contractor.

3.04 QUALITY CONTROL ORGANIZATION

A. CQC SYSTEM MANAGER: The Contractor shall identify an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. This CQC System Manager shall be on the site at all times during construction and will be employed by the Contractor, except as noted in the following. An alternate for the CQC System Manager will be identified in the plan to serve in the event of the system manager's absence. Period of absence may not exceed 2 weeks at any one time, and not more than 15 workdays during a calendar year. The requirements for the alternate will be the same as for the designated CQC manager.

B. CQC ORGANIZATIONAL STAFFING: The Contractor shall provide a CQC staff which shall be at the site of work at all times during progress, with complete authority to take any action necessary to ensure compliance with the Contract.

1. CQC Staff: Following are the minimum requirements for the CQC staff. These minimum requirements will not necessarily assure an adequate staff to meet the CQC requirements at all times during construction. The actual strength of the CQC staff may vary during any specific work period to cover the needs of the work period. When necessary for a proper CQC organization, the Contractor will add additional staff at no cost to the Government. This listing of minimum staff in no way relieves the Contractor of meeting the basic requirements of quality construction in accordance with Contract requirements. All CQC staff members shall be subject to acceptance by the Contracting Officer.

2. CQC System Manager: The CQC system manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on similar type construction to this Contract or an experienced construction person with a minimum of 10 years experience in related work.