Attachment 1- Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_1-22-.pdf | ||
| Questions_1-21-.pdf | ||
| Anticipated_parking_and_lay_down_areas.pdf | ||
| Attachment_12-_SPEc_section_075216.pdf | ||
| Amendment__1.pdf | ||
| Prebid_Attendance_Sheet.pdf | ||
| Attachment_8_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_9_-_Wage_Determination_LA170034.pdf | ||
| Attachment_4_-_AF66.pdf | ||
| Attachment_3_-_Environmental_Req'ts_(Jun_16).pdf | ||
| Attachment_6_-_Special_Contract_Requirements.pdf | ||
| Attachment_5-_Insurance_Form.pdf | ||
| Attachment_10_-_Specs_5-1-17.pdf | ||
| Attachment_11_-_Water_flow_5-1-17.pdf | ||
| Attachment_7_-_PPQ_Letter.pdf.pdf | ||
| Attachment_2_-drawing_5-1-17.pdf | ||
| FA4608-17-R-0013_Solicitation_A6-A9_.pdf | ||
| Attendance_Sheet.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL STATEMENT OF WORK
RENOVATE BUILDING 4565 FOR A6 AND A9
PROJECT NO. AWUB 16-0040
14 APRIL 2017
1. A SYNOPSIS OF THE SCOPE OF THE WORK IS AS FOLLOWS:
THE CONTRACTOR SHALL RENOVATE THE FORMER AIR OPERATIONS CENTER
SPACES AT BUILDING 4565, BARKSDALE AIR FORCE BASE, LOUISIANA, TO HOUSE
ADMINISTRATIVE FUNCTIONS FOR AFGSC A6; AND ADMINISTRATIVE AND
TRAINING FUNCTIONS FOR AFGSC A9. THE APPROXIMATE NET AREA TO BE
RENOVATED IN THESE SPACES IS 20,000 SQUARE FEET. THE A6 AND A9 SPACES AND
COMMON AREAS (RESTROOMS, MECHANICAL ROOM, AND VESTIBULES) OCCUPY
APPROXIMATELY 7,000; 10,700; AND 2,300 SQUARE FEET, RESPECTIVELY. ALL A6
SPACES SHALL BE SECURE OPEN STORAGE WITH SIPRNET RECEPTACLES
SCATTERED THROUGHOUT. A CYBER CAFÉ SHALL BE CONSTRUCTED FOR SIPRNET
SERVICES IN THE A9 SPACES.
EXISTING RAISED (ACCESS) FLOORING COVERS APPROXIMATELY 15,000 SQUARE
FEET OF THE OVERALL FLOOR AREA. APPROXIMATELY 1,800 SQUARE FEET OF
RAISED FLOORING SHALL BE REMOVED. OF THE 13,200 SQUARE FEET REMAINING,
APPROXIMATELY 1,800 SQUARE FEET SHALL BE REMOVED AND THEN RELOCATED
TO LOWER TO ITS ELEVATION TO 1’-0” ABOVE THE EXISTING CONCRETE SLAB (IN
ORDER TO BE AT THE SAME LEVEL AS THE REST OF THE RAISED FLOORING). THE
CONTRACTOR SHALL REUSE EXISTING RAISED FLOOR COMPONENTS AS MUCH AS
POSSIBLE AND AUGMENT THE NEEDED BALANCE WITH NEW, MATCHING
COMPONENTS.
THE EXISTING CEILINGS (AND ASSOCIATED LIGHT FIXTURES) ABOVE THE RAISED
FLOORS TO REMAIN SHALL, WITH EXCEPTIONS, REMAIN.
OTHER FEATURES UNDER THIS CONTRACT INCLUDE: REPAINTING OF PREVIOUSLY
PAINTED WALLS IN ALL A6 AND A9 SPACES AND COMMON AREAS, REPLACEMENT
OF EXTERIOR AND INTERIOR DOORS AND ASSOCIATED FRAMES AND HARDWARE,
RUBBER BASE, AND CHAIR RAILING IN CONFERENCE ROOMS.
THREE AREAS WITH A COMPOSITE AREA OF 5,500 SQUARE FEET SHALL UNDERGO
EXTENSIVE SPATIAL RECONFIGURATION (DEMOLITION OF EXISTING PARTITIONS
AND CONSTRUCTION OF NEW FINISHED PARTITIONS; NEW FLOORING AND
CEILING FINISHES; NEW DOORS, FRAMES, AND HARDWARE; NEW ELECTRICAL
RECEPTACLES AND RECONFIGURED CIRCUITRY; RELOCATED LIGHT FIXTURES;
AND REARRANGEMENT OF EXISTING HVAC COMPONENTS). THESE AREAS SHALL
ALSO RECEIVE NEW FIRE SUPPRESSION SPRINKLER HEADS.
OTHER AREAS SHALL BE PARTITIONED TO CREATE CLASSROOMS, STUDY AREA,
AND ADMINISTRATIVE ROOMS. THE EXISTING RESTROOMS SHALL BE RENOVATED,
INCLUDING NEW CEILINGS AND FLOORING, NEW TOILET COMPARTMENTS AND
FA4608-17-R-0013
Attachment 1
ACCESSORIES, AND NEW PLUMBING FIXTURES. SEAPARATE BREAKROOMS FOR A6
AND A9 SHALL BE PROVIDED.
THE CONTRACTOR SHALL REPLACE EXISTING MECHANICAL EQUIPMENT WITH
NEW, INCLUDING 275 TON CHILLER, TWO (2) ROOFTOP AIR HANDLING UNITS (EACH
17,500 CFM), AND HOT- AND CHILLED-WATER PUMPS.
THE COMMUNICATIONS SYSTEM SHALL BE COMPLETELY REVAMPED THROUGHOUT
THE A6 AND A9 SPACES. EXISTING NIPRNET AND SIPRNET CABLES AND
RECEPTACLES SHALL BE REMOVED AND NEW CABLES AND RECEPTACLES
PROVIDED. SIPR AND NIPR COMMUNICATIONS ROOMS SHALL BE CREATED TO
HOUSE RACKS AND SERVERS. VIDEO TELECONFERENCING SHALL BE PROVIDED IN
EACH OF THE TWO CONFERENCE ROOMS AND THE AUDITORIUM.
THE FIRE ALARM/MASS NOTIFICATION SYSTEM SHALL BE UPDATED THROUGHOUT
THE ENTIRETY OF BUILDING 4565, INCLUDING THE ADJACENT NC3 SPACES (WITH A
NET AREA OF 31,800 SQUARE FEET). PROVIDE NEW ADDRESSABLE ITEMS (FIRE
ALARM CONTROL PANEL, WALL- AND CEILING-MOUNTED SPEAKER STROBES, DUCT
DETECTORS, AND SMOKE DETECTORS (UNDER THE RAISED FLOOR)); AND EQUIP
EXISTING PULL STATIONS WITH MINI-MODULES FOR CONVERSION TO
ADDRESSABLE.
INTRUSION DETECTION SYSTEMS SHALL BE PROVIDED IN THE A6 SPACES, THE A9
CYBER CAFÉ, AND THE SIPRNET COMMUNICATIONS ROOM. COMPONENTS SHALL
INCLUDE ALARMED DOORS, ELECTRIC DOOR STRIKES (EXCEPTING THE SIPRNET
COMMUNICATIONS ROOM), CEILING-MOUNTED MOTION SENSORS, AND CONTROL
UNITS.
THE EXISTING SINGLE-PLY ROOF SHALL BE REMOVED OVER THE ENTIRETY OF
BUILDING 4565. THE EXISTING POURED GYPSUM DECK SHALL REMAIN AND BE
PATCHED AS REQUIRED. A NEW ROOF ASSEMBLY, INCLUDING SINGLE-PLY
MEMBRANE OVER BOARD INSULATION, SHALL BE PROVIDED. NEW EQUIPMENT
CURBS AND RAISED EDGING SHALL ALSO BE PROVIDED.
2. THE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE INSTRUCTIONS
HEREIN, OTHER CRITERIA CONTAINED IN THE CONTRACT, AND THE FOLLOWING
DRAWING SHEETS (ATTACHED):
GENERAL:
G01 GENERAL NOTES, INTRUSION DETECTION SYSTEM (IDS) REQUIREMENTS,
SECURE OPEN STORAGE (SOS) BOUNDARY PLAN, & INDEX TO DRAWINGS
ARCHITECTURAL:
A01 DEMOLITION FLOOR PLAN
A02 DEMOLITION REFLECTED CEILING PLAN
A03 FLOOR PLAN – NEW CONSTRUCTION
A04 REFLECTED CEILING PLAN – NEW CONSTRUCTION
A05 FINISH SCHEDULE
FA4608-17-R-0013
A06a OPENING SCHEDULE A06b SIGN SCHEDULE
A07 RAMP AND CABINETRY DETAILS
A08 FURNITURE PLAN
A09 INTERIOR ELEVATIONS
A10 DEMOLITION ROOF PLAN (RELEASE PENDING)
A11 ROOF PLAN – NEW CONSTRUCTION (RELEASE PENDING)
MECHANICAL:
M01 DEMOLITION MECHANICAL SITE & ROOF PLANS
M02 MECHANICAL SITE & ROOF PLANS – NEW CONSTRUCTION
M03 DEMOLITION MECHANICAL PLAN
M04 MECHANICAL PLAN – NEW CONSTRUCTION
FIRE ALARM SYSTEM:
FA01 DEMOLITION FIRE ALARM/MASS NOTIFICATION PLAN
FA02 FIRE ALARM/MASS NOTIFICATION PLAN – NEW CONSTRUCTION
FA03 DEMOLITION FIRE ALARM/MASS NOTIFICATION PLAN – NC3 SPACES
FA04 FIRE ALARM/MASS NOTIFICATION PLAN – NEW CONSTRUCTION – NCS SPACES
ELECTRICAL:
E01 DEMOLITION POWER PLAN
E02 POWER PLAN – NEW CONSTRUCTION
COMMUNICATIONS:
Co01 DEMOLITION COMMUNICATIONS PLAN Co02 COMMUNICATIONS PLAN – NEW CONSTRUCTION
3. SEE DRAWING SHEETS A02 AND A04 FOR DEMOLITION AND NEW CONSTRUCTION
WORK TO BE PERFORMED FOR ELECTRICAL SWITCHES IN SELECT LOCATIONS.
4. UNLESS ITEMS ARE INDICATED ON DRAWINGS TO BE “EXISTING”, “SALVAGED”,
“REINSTALLED”, “RELOCATED”, OR “REUSED”, ALL ITEMS SHALL BE REGARDED AS
NEW, WHETHER NOTED AS “NEW” OR NOT.
5. THE GOVERNMENT-FURNISHED, GOVERNMENT-INSTALLED MODULAR
WORKSTATIONS AND OTHER FURNITURE AND EQUIPMENT ITEMS SHOWN ON
DRAWING SHEET A08 AND ELSEWHERE IN THE DRAWINGS ARE INCLUDED FOR
PURPOSES OF INFORMATION AND ASSISTANCE TO THE CONTRACTOR IN LOCATING
CONTRACTOR-PROVIDED ITEMS. UNLESS OTHERWISE NOTED, THE CONTRACTOR
SHALL PERFORM ALL OTHER WORK AND PROVIDE OTHER ITEMS INDICATED IN
THIS STATEMENT OF WORK.
6. THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING
CONSTRUCTION TO REMAIN.
7. ALL DIMENSIONS SHOWN ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR
SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO ANY FIELD
FA4608-17-R-0013
WORK. FAILURE OF THE CONTRACTOR TO FIELD VERIFY DIMENSIONS AND
CONDITIONS WHICH RESULT IN ILL-FITTING OR OTHERWISE UNSUITABLE
CONSTRUCTION ITEMS THAT MUST BE ALTERED OR REPLACED SHALL NOT BE
CAUSE FOR ADDITIONAL CHARGES TO THE GOVERNMENT. THE CONTRACTOR
SHALL PERFORM THE ALTERATION AND REPLACEMENT WORK TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
8. ANY CONTRACTOR-PROPOSED DEVIATION FROM THE STATEMENT OF WORK
DUE TO OSTENSIBLY DIFFERING FIELD CONDITIONS SHALL BE SUBMITTED IN
WRITING TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL RECEIVE
WRITTEN INSTRUCTIONS FROM THE CONTRACTING OFFICER PRIOR TO
COMMENCING ANY WORK THAT DIFFERS FROM THAT SHOWN IN THE STATEMENT
OF WORK.
9. THE CONTRACTOR SHALL PAINT ANY EXPOSED, NON-FACTORY FINISHED
COMPONENT, SUCH AS CONDUIT, TO MATCH THE SUBSTRATE FINISH TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
10. ANY NEW CONSTRUCTION ITEMS, UNLESS INDICATED TO BE GOVERNMENT-
FURNISHED AND/OR GOVERNMENT-INSTALLED, SHALL BE CONTRACTOR-
FURNISHED AND CONTRACTOR-INSTALLED.
11. “PROVIDE” = “FURNISH AND INSTALL”
12. THE CONTRACTOR SHALL PERFORM THE NECESSARY FIELD VERIFICATIONS TO
ENSURE THAT THE DEMOLITION AND/OR NEW CONSTRUCTION WORK THAT HE
PERFORMS DOES NOT ADVERSELY AFFECT THE PROPER FUNCTIONING OF THE
EXISTING CONSTRUCTION TO REMAIN IN THE PROJECT AREA OR IN OTHER AREAS
OF BUILDING 4565. IF THE CONTRACTOR’S WORK DOES ADVERSELY AFFECT ANY
PART OF THE EXISTING CONSTRUCTION TO REMAIN, HE SHALL PERFORM THE
CORRECTIVE ACTIONS REQUIRED TO RESTORE, TO THE SATISFACTION OF THE
CONTRACTING OFFICER, THE PROPER FUNCTIONING OF THE AFFECTED EXISTING
CONSTRUCTION TO REMAIN. ANY CORRECTIVE WORK REQUIRED OF THE
CONTRACTOR TO REPAIR EXISTING CONSTRUCTION THAT HE FAILED TO PROTECT
SHALL BE DONE AT NO ADDITIONAL COST TO THE GOVERNMENT.
13. THE CONTRACTOR SHALL CONDUCT TESTS REQUIRED TO SHOW THAT ALL THE
FIXTURES, EQUIPMENT, AND SYSTEMS THAT HE PROVIDED (OR INSTALLED) UNDER
THIS CONTRACT PERFORM IN A FULLY OPERATIONAL AND SATISFACTORY
MANNER. THE CONTRACTOR MUST HAVE IN HAND THE GOVERNMENT-APPROVED
OPERATIONS AND MAINTENANCE MANUALS APPLICABLE TO THE FIXTURE,
EQUIPMENT, OR SYSTEM BEING TESTED BEFORE HE MAY SCHEDULE THE
ASSOCIATED TEST. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT
REPRESENTATIVE WITH A WRITTEN INVITATION TO WITNESS EACH TEST AT LEAST
72 HOURS PRIOR TO THE TEST’S SCHEDULED PERFORMANCE. THE CONTRACTOR
SHALL ENSURE THAT ANY REQUIRED MANUFACTURER’S REPRESENTATIVE IS ALSO
PRESENT AT THE TEST. IF THE CONTRACTOR CONDUCTS THE TEST WITHOUT THE
REQUIRED MANUFACTURER’S REPRESENTATIVE BEING PRESENT OR WITHOUT THE
FA4608-17-R-0013
GOVERNMENT REPRESENTATIVE BEING THERE TO WITNESS (UNLESS INFORMED
BY THE GOVERNMENT REPRESENTATIVE IN WRITING TO PROCEED WITHOUT HIM),
THE CONTRACTOR SHALL REACCOMPLISH THE TEST AT NO ADDITIONAL COST TO
THE GOVERNMENT. THE WARRANTY START DATE FOR THE TESTED FIXTURE,
EQUIPMENT, OR SYSTEM IS THE DATE THAT THE TEST IS SUCCESSFULLY
CONDUCTED, MEETS THE CONDITIONS ABOVE, AND IS VALIDATED AS SUCH IN
WRITING BY THE CONTRACTING OFFICER OR HIS REPRESENTATIVE.
14. THE CONTRACTOR SHALL PROVIDE THE SUBMITTALS BELOW AS DIRECTED BY
THE CONTRACTING OFFICER. SUBMITTALS DESIGNATED AS “FIO” ARE FOR
INFORMATION ONLY WHILE THOSE DESIGNATED “GA” REQUIRE GOVERNMENT
APPROVAL. THE CONTRACTOR SHALL PROVIDE NUMBER OF COPIES AS PRESCRIBED
FOR EACH OF THE FOLLOWING SUBMITTALS.
PRODUCT DATA SHALL BE SUBMITTED FOR THE FOLLOWING (PROVIDE FOUR (4)
COPIES):
CONCEALED CABINET DOOR HINGES, FIO;
CABINETRY PLYWOOD, FIO;
WOOD CHAIR RAILING, FIO;
COMMUNICATIONS ROOMS’ PLYWOOD, FIO;
1x WOOD STILE MATERIAL, FIO;
CABINET DOOR PULLS, FIO;
DUAL DRAWER GUIDES, FIO;
BREAK ROOM SINKS, GA;
LAVATORIES (BATHROOM SINKS), GA;
FAUCETS, GA;
UNDER-LAVATORY PIPE COVER/PROTECTOR, FIO;
TANKLESS ELECTRIC WATER HEATER, GA;
UPRIGHT ELECTRIC WATER HEATER, GA;
WATER CLOSETS, GA;
URINALS, GA;
FLUSH VALVES FOR WATER CLOSETS AND URINALS, GA;
WATER COOLER, GA;
DRAINAGE PIPING AND FITTINGS, FIO;
COPPER WATER PIPING AND SLEEVE INSULATION, FIO;
TOILET ACCESSORIES, FIO;
MIRRORS, FIO;
PLUMBING FITTINGS AND PIPING, FIO;
EXPANDING FOAM SEALANT, FIO;
FIRE STOP PILLOWS, FIO;
ELECTRICAL DISCONNECTS, GA;
ELECTRICAL DUPLEX RECEPTACLES, FIO;
ELECTRICAL QUAD RECEPTACLES, FIO;
ELECTRICAL SINGLE-POLE SWITCHES, FIO;
ELECTRICAL THREE-WAY SWITCHES, FIO;
DIMMING SWITCHES, FIO;
ELECTRICAL COVER PLATES, FIO;
CONDUIT, FIO,
FA4608-17-R-0013
POWER WIRING, FIO;
SIPERNET AND NIPERNET WIRING, GA;
WIRE/CABLE TRAYS, GA;
TOILET PARTITIONS AND ASSOCIATED HARDWARE, GA;
SOLID CORE WOOD DOORS (SHOWING PREPARATION FOR HARDWARE), GA;
INSULATED HOLLOW METAL DOORS (SHOW PREPARATION FOR HARDWARE), GA;
HOLLOW METAL FRAMES, GA;
VISION LITES (GLASS AND FRAMES), GA;
CLOSERS, GA;
CYLINDER LOCKS, GA;
HINGES, GA;
WALL STOPS, GA;
FLOOR STOPS, GA;
SILENCERS, GA;
KICKPLATES, GA;
CONCEALED FLUSH BOLTS, GA;
EXIT DEVICES, GA;
EXIT DEVICES WITH DEADBOLT EGRESS HARDWARE, GA;
OVERHEAD RAIN DRIPS, GA;
BALANCED MAGNETIC SWITCH SENSORS, GA;
MOUNTING BRACKETS, GA;
5/8” FIRE-RATED GYPSUM BOARD, GA;
2 ½” AND 3 5/8” STEEL STUDS, FIO;
4”, 6”, AND 8” LIGHTWEIGHT CMU’s, FIO;
TYPE “S” MORTAR, FIO;
GROUT MIX, FIO;
STAIN, FIO;
POLYURETHANE, FIO;
RUBBER BASE, GA;
PAINT, GA;
CMU BLOCK FILLER, GA;
POURED GYPSUM MIX, REINFORCEMENT MESH, AND FORMBOARD, FIO;
FIBERBOARD ACOUSTICAL LAY-IN CEILING PANELS, GA;
FIBERGLASS ACOUSTICAL LAY-IN CEILING PANELS, GA;
LAY-IN CEILING GRID, GA;
MINI-BLINDS (AT SELECT DOORS), FIO;
CHILLER, GA;
ROOFTOP AIR HANDLING UNITS, GA;
CHILLED WATER PUMPS, GA;
HOT WATER PUMPS, GA;
BOILERS, GA;
SIPERNET RECEPTACLES, GA;
SIPERNET FIBER OPTIC CABLE, GA;
SC TYPE CONNECTORS, GA;
SPLIT 50 66 BLOCKS, GA;
NIPERNET RECEPTACLE, GA;
PATCH PANELS. GA;
INTERIOR SIGNAGE, GA;
FA4608-17-R-0013
SIGNAGE SCHEDULE, GA;
SOLID SURFACING COUNTERTOP, FIO;
RAISED FLOOR PANELS, GA;
RAISED FLOOR EXPOSED GRID, GA;
RAISED FLOOR SUPPORTS, GA;
SUPPLY- AND RETURN-AIR GRILLES AND BOOTS, FIO;
FIRE ALARM CONTROL PANEL AND INTERNAL APPURTENANCES, GA;
WALL- AND CEILING-MOUNTED SPEAKER STROBES, GA;
FIRE ALARM CONTROL AND MINI-MODULES, GA;
SMOKE DETECTORS (UNDERFLOOR AND DUCT) AND APPURTENANCES, GA;
REMOTE INDICATORS, GA;
LOCAL OPERATOR CONSOLES, GA;
MASS NOTIFICATION SYSTEM PANEL AND INTERNAL APPURTENANCES, GA;
FLOOR BOXES (ELECTRICAL POWER AND NIPERNET RECEPTACLES), GA;
FLOOR BOXES (ELECTRICAL POWER, NIPERNET, AND SIPRNET RECEPTACLES), GA;
FLOURESCENT LIGHT TROFFERS, GA;
FLUORESCENT LIGHT TROFFERS WITH EMERGENCY BALLASTS, GA;
FLUORESCENT STRIP LIGHT FIXTURES, FIO;
FLUORESCENT AND LED LAMPS, GA;
DIMMABLE RECESSED CAN LIGHT FIXTURES; GA;
EXIT SIGNS, GA;
SLC CABLE, GA;
ELECTRIC STRIKE AND TRANSFORMER, GA;
AECS KEYPAD, GA;
IDS KEYPAD, GA;
IDS CONTROL UNIT AND INTERNAL APPURTENANCES, GA; AND
IDS MOTION SENSORS, GA.
COLOR SAMPLES SHALL BE SUBMITTED FOR THE FOLLOWING (PROVIDE TWO (2)
SAMPLES):
DOOR AND MILLWORK STAIN, GA;
MINI-BLINDS, GA;
CARPET, GA;
VINYL COMPOSTION TILE, GA;
PORCELAIN FLOOR TILE, GA;
CERAMIC WALL TILES, GA.
RUBBER BASE, GA;
INERIOR SIGNAGE, GA;
SOLID SURFACING COUNTERTOP, GA;
PAINT, GA;
RAISED FLOOR PANELS, GA; AND
RAISED FLOOR EXPOSED SUPPORT FRAME/GRID, GA.
OPERATIONS AND MAINTENANCE MANUALS (ALL GA) SHALL BE SUBMITTED FOR
THE FOLLOWING (PROVIDE FOUR (4) COPIES):
FIRE SUPPRESSION SYSTEM;
COMBINATION FIRE ALARM/MASS NOTICATION SYSTEM, INCLUDING SMOKE
DETECTION;
FA4608-17-R-0013
INTRUSION DETECTION SYSTEM;
MECHANICAL HVAC SYSTEM, INCLUDING CONTROLS; AND
PLUMBING FIXTURES.
SHOP DRAWINGS (ALL GA) SHALL BE SUBMITTED FOR THE FOLLOWING (PROVIDE
FOUR (4) HARDCOPIES AND ONE (1) SET OF CAD DRAWING FILES):
STEEL ANGLE LINTELS;
TOILET STALLS/COMPARTMENTS LAYOUT PLAN;
SECURITY GRILLES AND THROUGH-WALL ENCLOSURES;
DUCT TRANSITIONS AT SECURITY GRILLE ENCLOSURES;
FLOOR BOXES’ LAYOUT PLAN AT RAISED FLOOR;
CABINETRY FOR BREAK ROOMS AND PHONE STORAGE;
CABLE TRAY LAYOUT AND NIPERNET AND SIPRNET CABLE ROUTING PLANS;
ALUMINUM GUARDRAILS AND HANDRAILS;
RAISED FLOOR SYSTEM (INCLUDING RAMPS);
REPLACEMENT MECHANICAL SYSTEM (EQUIPMENT, DUCTWORK, PIPING,
CONTROLS, AND OTHER APPURTENANCES, INCLUDING TEMPORARY CHILLER
PACKAGE);
COMBINATION FIRE ALARM/MASS NOTIFICATION SYSTEM, INCLUDING SMOKE
DETECTION SYSTEM;
INTRUSION DETECTION SYSTEM;
FIRE SUPPRESSION SYSTEM;
VIDEO TELECONFERENCING SYSTEM APPURTENANCES; AND
ELECTRICAL CIRCUIT PLAN AND ELECTRICAL POWER AND LIGHTING PANEL
SCHEDULES.
CERTIFICATES AND OTHER DOCUMENTATION (ALL GA) SHALL BE SUBMITTED FOR
THE FOLLOWING (PROVIDE FOUR (4) COPIES):
CERTIFICATION LETTER FOR 100% FIRE ALARM/MASS NOTIFICATION/FIRE
SUPPRESSION DESIGN (ATTESTED UNDER SIGNATURE OF LICENSED FIRE
PROTECTION ENGINEER);
CERTIFICATION LETTER FOR 100% INTRUSION DETECTION SYSTEM DESIGN
(ATTESTED UNDER SIGNATURE OF LICENSED IDS TECHNICIAN);
FIRE SUPPRESSION SYSTEM DESIGN CALCULATIONS (ATTESTED UNDER SIGNATURE
OF LICENSED FIRE PROTECTION ENGINEER);
TESTING CERTIFICATE FOR SMOKE DETECTION SYSTEM;
FIRE SUPPRESSION SYSTEM CALCULATIONS;
FACP BATTERY CALCULATIONS; AND
HVAC TESTING AND BALANCE REPORTS (CHILLER, BOILERS, PUMPS, COILS, AND
BALANCING COCKS).
ALSO SUBMIT FOR GOVERNMENT APPROVAL DOCUMENTATION FOR THE
DESIGNATED VINDICATOR IDS POINT OF CONTACT, WHICH SHALL INCLUDE
CERTIFICATE(S) OF THE APPROPRIATE TRAINING AND A RESUME DETAILING THE
REQUIRED EXPERIENCE (PROVIDE FOUR (4) COPIES).
FA4608-17-R-0013
15. THE CONTRACTOR SHALL EXECUTE THIS CONTRACT IN ACCORDANCE WITH
THE SPECIFICATIONS BELOW AND ELSEWHERE IN THE STATEMENT OF WORK
(SPECIFICATION SECTIONS 08 71 00 AND 09 90 00 ATTACHED):
A. USE ONLY METAL BOXES FOR ALL ELECTRICAL AND COMMUNICATIONS WORK
(ABSOLUTELY NO PLASTIC BOXES);
B. STUB UP WITHIN PARTITIONS (OR FURRINGS) AT EACH NIPRNET AND SIPRNET
DROP WITH ONE INCH (1”) EMT CONDUIT. CONDUIT SHALL EXTEND SIX INCHES (6”)
ABOVE TOP OF PARTITION. OR, WHERE PARTITIONS EXTEND TO UNDERSIDE OF
EXISTING ROOF DECK, PROVIDE 1” EMT SWEEP THAT PROTRUDES 6” FROM WALL
SURFACE AND EXTENDS 6” ABOVE HEIGHT OF HIGHER CEILING. CAP CONDUIT
ENDS WITH BUSHINGS;
C. STUB UP WITHIN PARTITIONS FOR INFRASTRUCTURE DROPS OF FUTURE SOUND
SYSTEM IN AUDITORIUM 121 WITH ONE-INCH (1”) EMT CONDUIT. CONDUIT SHALL
EXTEND SIX INCHES (6”) ABOVE TOP OF PARTITION. OR, WHERE PARTITIONS
EXTEND TO UNDERSIDE OF EXISTING ROOF DECK, PROVIDE 1” EMT SWEEP THAT
PROTRUDES 6” FROM WALL SURFACE AND EXTENDS 6” ABOVE HEIGHT OF HIGHER
CEILING. CAP CONDUIT ENDS WITH BUSHINGS;
D. THE GOVERNMENT REPRESENTATIVE SHALL MAKE ALL COLOR SELECTIONS
FROM MANUFACTURERS’ STANDARD PALETTES; NO PREMIUM COLORS WILL BE
SELECTED;
E. PAINT SHEEN FOR EXISTING AND NEW HOLLOW FRAMES, NEW HOLLOW METAL
DOORS, AND SOLID CORE WOOD DOORS SHALL BE SEMI-GLOSS. PAINT SHEEN FOR
PREVIOUSLY PAINTED AND NEW GYPSUM BOARD SURFACES SHALL BE SATIN.
PAINT SHEEN FOR PREVIOUSLY PAINTED CMU WALLS SHALL BE SEMI-GLOSS;
F. SOLID CORE WOOD DOORS SHALL BE 1-3/4” THICK, FLUSH, AND ARCHITECTURAL
GRADE; AND SHALL HAVE PARTICLE BOARD CORE, NATURAL BIRCH VENEER,
ROTARY CUT GRAIN PATTERN, AND HARDWARE PREPARATION;
G. FLUORESCENT LIGHT TROFFERS SHALL BE LITHONIA SP8 2’ x 4’ (WITH FOUR (4) T8
STRAIGHT LAMPS PER FIXTURE) OR APPROVED EQUAL;
H. LAY-IN ACOUSTICAL CEILING PANELS (FIBERBOARD) SHALL BE ARMSTRONG
FISSURED WHITE ANGLED TEGULAR 2’ x 2” X 5/8” OR APPROVED EQUAL;
I. ELECTRIC WATER HEATER SHALL BE RHEEM PERFORMANCE PLATINUM 50
GALLON 12-YEAR WARRANTY 5500/5500-WATT ELECTRIC HEATER WITH 68 GALLONS
PER FIRST HOUR DELIVERY (150 DEG F MAXIMUM TEMPERATURE AND 90 DEG F
MINIMUM TEMPERATURE); OR APPROVED EQUAL;
J. CARPET TILES SHALL BE PHILADEPHIA COMMERCIAL MESH WEAVE CARPET TILE;
MANUFACTURED BY SHAW; SKU PCCT-54458-58600, 2’ x 2’ , GLUE DOWN, 1/12 GAUGE, ECOWORX BACKING, GRAPHIC LOOP CONSTRUCTION, 22 OZ PILE FACE WEIGHT, ECO SOLUTION Q NYLON FIBER CONTENT, LIFETIME COMMERCIAL LIMITED
WARRANTY; OR APPROVED EQUAL;
FA4608-17-R-0013
K. VINYL COMPOSITION TILES SHALL BE AZROCK STANDARD VCT, ASTM F 1066
CLASSIFICATION OF CLASS 3 THROUGH PATTERN; 1/8” TOTAL THICKNESS; ASTM F
970 STATIC LOAD LIMIT OF 150 PSI; 12” x 12”; ASTM E 648 FLAMMABILITY OF CLASS 1
>0.45 CRF; ASTM E 662 SMOKE DENSITY OF <450; 5 YEAR LIMITED WARRANTY; OR
APPROVED EQUAL;
L. RECESSED CAN LIGHT FIXTURES SHALL BE EATON HALO COMMERCIAL PD615
LED DOWNLIGHT WITH EATON SLIDE DIMMER SWITCH (MODEL NO. SAL06P/WBSD-
SLD); OR APPROVED EQUAL;
M. FIBERGLASS ACOUSTICAL LAY-IN CEILING PANELS AND ASSOCIATED
SUSPENSION GRID SHALL BE ARMSTRONG OPTIMA 15/16” SQUARE TEGULAR FINE
TEXTURE (ITEM NO. 3250, 2’ x 2’ x 1”) WITH ARMSTRONG PRELUDE SUSPENSION GRID
(BLIZZARD WHITE); OR APPROVED EQUAL;
N. RAISED FLOOR PANELS SHALL BE COMPUTER ENVIRONMENTS INC., TOP
DIMENSONS OF 24” x 24” TAPER TO BOTTOM DIMENSIONS OF 23-3/4” x 23-3/4”; 1-1/8”
OVERALL THICKNESS; PARTICLE BOARD CORE; UNDERSIDE OF GALVANIZED STEEL
PLATING; TOP LAMINATE LAYER WITH PATTERNED FINISH (COLOR/PATTERN FOR
NEW RAISED FLOOR PANELS TO BE SELECTED BY CONTRACTING OFFICER OR HIS
REPRESENTATIVE TO MATCH EXISTING); OR APPROVED EQUAL; AND
O. FIRE-RETARDANT PAINT SHALL BE FLAME STOP II (WATER BASED, NON-TOXIC,
NON-CARCINOGENIC, NO PDBE’S, FLAME SPREAD OF 25, DOES NOT ALTER
STRUCTURAL INTEGRITY OF WOOD, APPLY BY SPRAYING, BRUSHING, OR ROLLING;
MOISTURE CONTENT SHALL BE 5 TO 15% BEFORE APPLICATION, TESTED TO ASTM E
84, NFPA 255, AND UL 723 STANDARDS; ONE COAT REQUIRES 48-HOUR CURING
PERIOD); OR APPROVED EQUAL.
16. WATER FLOW TEST RECORDS (TAKEN SUMMER 2016) FOR THREE FIRE HYDRANTS
NEAR BUILDING 4565 ARE ATTACHED. THIS INFORMATION (THREE PAGES) MAY BE
USED FOR PURPOSE OF FIRE PROTECTION DESIGN. SEE SITE LOCATION MAP,
DRAWING SHEET NO. G01, FOR APPROXIMATE LOCATIONS OF THESE FIRE
HYDRANTS.
17. THE CONTRACTOR SHALL REGULARLY UPDATE (“RED-LINE”) TWO SETS OF
CONSTRUCTION DRAWINGS TO INDICATE AS-BUILT CONDITIONS THAT DIFFER
FROM THOSE SHOWN ON THE ORIGINAL DRAWINGS. THE CONTRACTOR SHALL
MAINTAIN AT LEAST ONE DRAWING SET ON THE JOB-SITE FOR REVIEW AT ANY
TIME BY THE GOVERNMENT REPRESENTATIVE. IN ADDITION TO BOTH SETS OF
THE “RED-LINED” AS-BUILT DRAWING SETS, THE CONTRACTOR SHALL SUBMIT CAD
DRAWING FILES OF THE AS-BUILT DRAWING SET AT CLOSEOUT; THESE FILES SHALL
BE COMPATIBLE WITH AUTOCAD RASTER DESIGN 2014 CADD CONSTRUCTION
DRAWINGS (ORIGINAL DRAWING FILES TO BE PROVIDED BY THE GOVERNMENT
FOR ASSISTANCE IN PREPARING AS-BUILT CADD DRAWING FILES). THE
FA4608-17-R-0013
CONTRACTOR SHALL INCORPORATE INTO THE AS-BUILT CADD FILES THE SHOP
DRAWINGS PROVIDED UNDER THIS CONTRACT.
18. WHEN THE CONTRACTOR DETERMINES THAT SUBSTANTIAL COMPLETION OF
THE WORK HAS BEEN REACHED, THE CONTRACTOR SHALL CONDUCT AN
INTERNAL WALK-THROUGH INSPECTION OF THE PROJECT SITE WITH HIS SUB-
CONTRACTORS AND DEVELOP A PUNCHLIST. AFTER ALL THE ITEMS ON THIS
PUNCHLIST HAVE BEEN RESOLVED, THE CONTRACTOR SHALL SCHEDULE THE
PREFINAL INSPECTION WITH THE GOVERNMENT REPRESENTATIVE. THE
CONTRACTOR AND GOVERNMENT REPRESENTATIVES SHALL THEN INSPECT EVERY
ASPECT OF THE WORK UNDER THIS CONTRACT FOR COMPLETENESS,
FUNCTIONALITY, AND COMPLIANCE WITH THE STATEMENT OF WORK; AND
DEVELOP AN EXHAUSTIVE PUNCHLIST THAT, WHEN ALL ITEMS ARE COMPLETED,
THE GOVERNMENT MAY TAKE BENEFICIAL OCCUPANCY OF THE FACILITY. AFTER
THE CONTRACTOR HAS RESOLVED ALL ITEMS ON THE PREFINAL INSPECTION
PUNCHLIST, HE SHALL SCHEDULE WITH THE GOVERNMENT REPRESENTATIVE THE
FINAL INSPECTION. IF THE GOVERNMENT REPRESENTATIVE DETERMINES DURING
THE COURSE OF THE FINAL INSPECTION THAT WORK ITEMS ON THE PREFINAL
INSPECTION PUNCHLIST HAVE BEEN INCOMPLETELY OR INCORRECTLY RESOLVED,
THE GOVERNMENT REPRESENTATIVE WILL SUSPEND THE FINAL INSPECTION,
INSTRUCT THE CONTRACTOR TO COMPLETE OR CORRECT THE UNRESOLVED
WORK ITEMS, AND RESCHEDULE THE FINAL INSPECTION. THE GOVERNMENT WILL
NOT CLOSE OUT THE PROJECT UNTIL THE FINAL INSPECTION IS CONDUCTED AND
THE CONTRACTING OFFICER CERTIFIES IN WRITING THAT THE INSPECTED WORK
HAS BEEN DONE COMPLETELY, CORRECTLY, AND IN ACCORDANCE WITH THE
STATEMENT OF WORK.
19. THE CONTRACTOR SHALL SCHEDULE WITH THE CONTRACTING OFFICER
TRAINING SESSIONS FOR EACH SYSTEM IN WHICH OPERATIONS AND
MAINTENANCE MANUALS ARE REQUIRED TO BE SUBMITTED (EXCEPTING
PLUMBING FIXTURES); THEY SHALL BE HELD AFTER THE SYSTEM HAS BEEN
SUCCESSFULLY TESTED. TRAINING SESSIONS SHALL BE CONDUCTED AT THE
PROJECT SITE BY QUALIFIED PERSONNEL PROVIDED BY THE SYSTEM
MANUFACTURER (OR BY INSTALLER PERSONNEL, IF MANUFACTURER AGREES IN
WRITING); THE CONTRACTOR SHALL ISSUE THE APPROVED OPERATIONS AND
MAINTENANCE MANUALS TO THE ATTENDEES FOR ‘FOLLOW-ALONG’ MATERIAL.
TYPICAL DURATION OF EACH TRAINING SESSION SHALL BE TWO (2) HOURS.
20. THE CONTRACTOR SHALL SUBMIT A COMPLETED FORM 1354 WHICH FULLY
DESCRIBES, IN ACCORDANCE WITH THE REQUIREMENTS OF THE DOCUMENT, ALL
FIXTURES, EQUIPMENT ITEMS, AND SYSTEM COMPONENTS PROVIDED UNDER THIS
FA4608-17-R-0013
CONTRACT. IF THE INTIAL SUBMITTAL IS INCOMPLETE AND/OR CONTAINS
INACCURATE INFORMATION, THE CONTRACTOR SHALL REACCOMPLISH THE WORK
(RESUBMIT CORRECTED FORM THAT IS SATISFACTORY TO THE INSTALLATION REAL
PROPERTY OFFICER). REACCOMPLISHMENT OF THE DOCUMENT SHALL RECUR
UNTIL THE INSTALLATION REAL PROPERTY OFFICER, IN COORDINATION WITH
THE CONTRACTING OFFICER, IS SATISFIED THAT THE FORM 1354 SUBMITTAL IS
COMPLETE AND ACCURATE.
21. THE CONTRACT PERFORMANCE PERIOD SHALL BE 180 CALENDAR DAYS.
** END OF STATEMENT OF WORK **
SUPPLEMENT TO
FINAL STATEMENT OF WORK
(ROOF REPLACEMENT)
RENOVATE BUILDING 4565 FOR A6 AND A9
PROJECT NO. AWUB 16-0040
28 APRIL 2017
1. THE FOLLOWING IS A SUPPLEMENT TO THE FINAL STATEMENT OF WORK (DATED
14 APRIL 2017); IT DOES NOT DELETE OR ALTER ANY PROVISION IN THE FINAL
STATEMENT OF WORK UNLESS OTHERWISE INDICATED BELOW.
2. THE ROOF REPLACEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH
THE INSTRUCTIONS HEREIN, OTHER CRITERIA AND INSTRUCTIONS CONTAINED IN
THE CONTRACT, THE PREVIOUSLY RELEASED DRAWING SHEETS AND
SPECIFICATIONS, AND THE FOLLOWING DRAWING SHEETS (ATTACHED):
ARCHITECTURAL:
A10 DEMOLITION ROOF PLAN
A11 ROOF PLAN – NEW CONSTRUCTION
A12 ROOF DETAILS
3. IN CASE OF DISCREPANCY BETWEEN ROOF REPLACEMENT DRAWING SHEETS
(A10, A11, AND A12) AND PREVIOUSLY RELEASED DRAWING SHEETS M01 AND MO2,
INSTRUCTIONS PROVIDED ON ROOF REPLACEMENT DRAWING SHEETS (A10, A11,
AND A12) SHALL GOVERN.
4. ALL WOOD FOR ROOF REPLACEMENT WORK SHALL BE PRESSURE TREATED,
GRADE 2, SOUTHERN PINE OR SOUTHERN YELLOW PINE.
5. PAINT THESE SURFACES WITH THE FOLLOWING COATING SYSTEMS:
EXISTING STEEL (PREVIOUSLY COATED WITH ALKYD OR LATEX):
MPI REX 5.1C-G5 (SEMI-GLOSS):
SPOT PRIMER: MPI 79
INTERMEDIATE COAT: MPI 163
TOPCOAT: MPI 163
SYSTEM DFT: 5 MILS
EXTERIOR SURFACES, OTHER METALS (NON-FERROUS):
ALUMINUM, ALUMINUM ALLOY, AND OTHER MISCELLANEOUS NON-FERROUS
METAL ITEMS:
MPI EXT 5.4F-G5 (SEMI-GLOSS):
PRIMER: MPI 95
INTERMEDIATE COAT: MPI 8
TOPCOAT: MPI 8
SYSTEM DFT: 5 MILS
FA4608-17-R-0013
EXTERIOR WOOD, DRESSED LUMBER:
NEW AND EXISTING, UNCOATED DRESSED LUMBER:
ALKYD: MPI EXT 6.3b-G5 (SEMI-GLOSS):
PRIMER: MPI 7
INTERMEDIATE COAT: MPI 94
TOPCOAT: MPI 94
SYSTEM DFT: 5 MILS
6. THE CONTRACTOR SHALL EXECUTE THIS CONTRACT IN ACCORDANCE WITH
SPECIFICATION SECTION 075216 (ATTACHED). PROVIDE THE SUBMITTALS AS
REQUIRED IN SPECIFICATION SECTION 075216 TO THE CONTRACTING OFFICER.
** END OF SUPPLEMENT TO FINAL STATEMENT OF WORK **