RFI's
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15-R-0044-0001.doc | DOC document | |
| RFI_Log_30Sep.pdf | ||
| PS1.pdf | ||
| FS1.pdf | ||
| FS2.pdf | ||
| FS.pdf | ||
| FA1.pdf | ||
| FS3.pdf | ||
| Attendance_Sheet.pdf | ||
| Drawing.pdf | ||
| Attachment_9_PPQ_Cover.pdf | ||
| FA4608-15-R-0044.doc | DOC document | |
| Attachment_2_-_Environmental_Actual_Word_Document.rtf | RTF text file | |
| Attachment_3_-_AF66.pdf | ||
| Attachment_8.pdf | ||
| Attachment_7-_Special_Contract_Requirements.doc | DOC document | |
| Attachment_1-_SOW.pdf | ||
| Attachment_4-_Insurance.doc | DOC document | |
| Attachment_6-_WD.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AWUB 11‐0174
RFI Number Clarification Requested Government Response Date
Answered
Please provide any as‐built/existing building drawings associated with this project. If protection as‐ built drawings would be ideal. If not, any architectural, mechanical, structural, etc.
drawingsavailable, fire will help.
All known drawings have been provided to 2Cons for upload so all contractors have access to information.
Sept 24 2015
Please provide any available information specific to the design of the existing fire protection systems at Building B6626. The SOW for the repair/replacement of the existing Foam systems requires verification of certain design of the existing will help prepare this information and determine specific scope much more accurately.equipment and devices along with as‐built plans and calculations. Knowing anything about the Please confirm if there is any information available.
All known drawings have been provided to 2Cons for upload so all contractors have access to information.
Sept 24 2015
At the pre‐bid site visit it was mentioned that each Bid Option was to be priced separately. Per the Solicitation, the Bid Options mentioned in the SOW (Item No 0002 Option) ‐ item #3 are requested as one Net Amount. Please clarify if those are to be provided as a separate option, altogether in one price, or if each item on the list is to be priced separate.
2CON needs to answer. I just know that if a tech eval will need to be done then I will need to see all line items, but all line items definitely need to be addressed in contractor responses.
Sept 24 2015
I have attached information regarding the design criteria for Fueled and unfueled aircraft. This information is from ETL 98‐8. Please clarify which option applies.
Fueled aircraft Sept 24 2015
I have attached a copy of the ETL section referenced above. This is mentioned as a bid option and the recommendation is to reroute the pipe in a trench or above the slab. Please specify where this particular item is located.
This is in referece to any fire protection water service entrance into the building. So you can put in trence or you can intercept it outside, turn pipe up and then bring pipe through facility wall ‐ whichever is more feasible.
Sept 24 2015
The first Bid option in the SOW section referenced above requires all the existing sprinkler heads to be replaced. Is there a known quantity of existing sprinkler heads?
2Con has drawing for reference and could have been determined at site visit.
Sept 24 2015
Section A1 of ETL 98‐8 explains the required Construction for aircraft hangars. Attached are the associated pages. Please confirm if B6626 is constructed to these requirements.
Assume it is in compliance. Sept 24 2015
8 Please confirm if containment for the AFFF foam will be necessary.
Please follow all proper testing procedures, foam should not be allowed to enter aircraft parking/flightline area.
Sept 24 2015
The attached section of ETL 98‐8 is referenced in the Specific Bid Options in the SOW. However, the Corrective action requires only (1) test header to be added. Per the ETL, there should be at least (4) added.
As SOW states(Para 1a), the system has to comply with ALL applicable codes and be approved by FPE and AFCEC. Price as applicable to code and if it differs SOW then annotate where it differs and state that is a code requirment to ensure system meets ALL applicable current codes (Civilian, DoD, AF...). Numbers present are for reference and do not necessarily indicate all work necessary to bring system to code.
Sept 24 2015
10 How many heads are to be replaced as part of the stated options 2Cons has drawings Sept 24 2015
There was no clear information on the primary foam tank capacity please inform us as to what the required foam capacity needed is.
2Cons has drawings Sept 24 2015
12 Are there any underground pipe plans that depict where the lines enter the hangar? 2Cons has drawings Sept 24 2015
Is there any additional information as to the requirements of the temperature monitoring and the humidity control systems?
Temp Monitoring ETL02‐15:
A1.5.4. Temperature Monitoring System.
A1.5.4.1. Provide a system of temperature sensors for the aircraft servicing area in all geographic areas having a 99.6% dry bulb temperature less than ‐1 °C (30 °F) when wet‐pipe sprinkler systems are present. The temperature sensors will be located at the same level as the sprinkler piping and spaced not more than 60 meters (200 feet) apart. Provide this temperature monitoring to ensure a warning when freezing temperatures endanger sprinkler piping.
A1.5.4.2. This facility temperature monitoring system will be tied into the FACP as a dedicated supervisory zone, and this supervisory signal will be transmitted to the fire department in the same manner as all fire‐related supervisory signals in the facility.
Humidity Control NFPA 72: Para
10.3.5.3 At a relative humidity of 85 percent and an ambient
temperature of 30°C (86°F)
Sept 24 2015