DATA AIRE Series Computer Room Air Conditioning User Manual
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Witt_Transfer_Dry_Coolers.pdf | ||
| FA4600-15-R-0014_Site_Visit_Sign_In_Log.pdf | ||
| FA4600-15-R-0014-0001.pdf | ||
| Operation_and_Maintenance_Instructions_for_EVAPCO_Water_Cooling_Towers.pdf | ||
| FA4600-15-R-0014_Questions_and_Answers.pdf | ||
| Liebert_Mini-Mate2_User_Manual.pdf | ||
| Installation_and_Maintenance_Manual_Air-Cooled_Scroll_Compressor_Chiller.pdf | ||
| FA4600-15-R-0014_High_Performance_Computing_Cooling_Maintenance.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA AIRE SERIES
Air and Water/Glycol Cooled
DX 6-30 ton
User Manual
CONGRATULATIONS ON THE SELECTION OF A DATA AIRE PRECISION
ENVIRONMENTAL CONTROL SYSTEM. PROPER INSTALLATION, OPERATION
AND MAINTENANCE OF THIS EQUIPMENT WILL ENSURE YEARS OF OPTIMAL
PERFORMANCE.
This manual is intended to assist trained service personnel by providing necessary guidelines for this particular equipment. Service to Data Aire units should be done by qualified individuals with an adequate background in areas such as HVAC, electrical, plumbing and electronics, as applicable.
Service performed by unauthorized or unqualified technicians may void manufacturers’ warranties and could result in property damage and/or personal injury.
Special care should be given to those area where these symbols appear.
Data Aire, Inc. reserves the right to make design changes for the purposes of product improvement, or to withdraw any design without notice.
Data Aire Series DX IOM
1.0 INSTALLATION
1.1 Room Considerations
1.2 Inspection
1.3 Rigging
1.4 Locating the Unit
| 1.4.1 | Downflow | Units...................................................................................................... 7 |
| 1.4.2 | Upflow | Units .......................................................................................................... 8 |
1.5 Paperwork
1.6 Storage
2.0 PIPING
2.1 Air Cooled Unit Piping
2.1.1 Discharge Lines
2.1.2 Liquid Lines
2.1.3 Suction Lines
2.1.4 Connection Sizes, Air Cooled Units
2.1.5 Field Piping, Remote Condenser
2.1.6 Field Piping, Remote Condensing Unit
2.2 Water/Glycol Cooled Unit Piping
2.2.1 Field Piping, Glycol System
2.2.2 Connection Sizes, Water/Glycol Cooled Units
2.2.3 Connection Sizes, Fluid Coolers
2.3 Auxiliary Chilled Water Coil Piping
2.4 Condensate Drain Piping
| 2.5 | Humidifier | Piping ................................................................................................. 13 | ||
| 2.5.1 | Steam | Generator | Humidifier................................................................................ 13 | |
| 2.5.2 | Dry | Steam | Humidifier .......................................................................................... 13 |
2.6 Leak Testing
2.7 Evacuation
3.0 ELECTRICAL CONNECTIONS
3.1 Electrical Service
3.2 Nameplate Ratings
3.3 Grounding
3.4 Voltage Tolerance
3.5 Auxiliary Control Wiring
3.6 Remote Shutdown
3.7 Remote Alarm Contacts
3.8 Remote Sensors
3.9 Condensate Pumps
3.10 Condensate Probe
3.11 Water Sensing Cable
Table of Contents
Table of Contents, cont’d
4.0 INSTALLATION OF REMOTE HEAT EXCHANGER
4.1 Rigging
4.2 Leg Assembly
4.3 Locating the Remote Heat Exchanger
4.4 Electrical Service
4.5 Air Cooled Condensers - Model DARC
4.5.1 Fan Speed Control
4.5.2 Ambient Thermostats
4.6 Fluid Coolers - Model DAFC
4.6.1 Fluid-Sensing Thermostats
4.6.2 Energy Saver Cooling
5.0 CHARGING
5.1 Voltage Phase Check
5.1.1 Evaporator
5.1.2 Secondary Heat Exchanger
5.2 Important Refrigeration Components
5.2.1 Expansion Valve
5.2.2 High Pressure Cutout Switch
5.2.3 Low Pressure Cutout Switch
5.3 Air Cooled Systems
5.3.1 Fan Speed Control System Charging
5.3.2 Flooded System Charging
5.4 Water/Glycol Cooled Systems
5.4.1 Water/Glycol Cooled Systems Charging
5.5 Refrigerant Handling
6.0 GLYCOL SYSTEMS
6.1 Glycol Concentration
| 6.2 | Internal | (Fluid) | Volume | - | Downflow | Models ......................................................... 25 |
| 6.3 | Internal | (Fluid) | Volume | - | Upflow | Models ............................................................. 25 |
6.4 Fluid Cooler Internal Volume
6.5 Copper Piping Internal Volume
6.6 Freezing Point of Aqueous Solutions
7.0 CONTROLS
7.1 dap4 Microprocessor Control Panel
7.2 Secondary Heat Exchangers
7.3 Wiring Diagrams
Table of Contents, cont’d
8.0 REGULAR MAINTENANCE ITEMS
8.1 Filters
8.2 Belts
8.3 Bearings
8.4 Humidifier Canisters
8.5 Fuses
8.6 Heating Elements
8.7 Refrigerant Filter Drier
9.0 WARRANTY
10.0 CONTACT DATA AIRE
LINE SIZING CHART
MONTHLY MAINTENANCE INSPECTION CHECKLIST
QUARTERLY MAINTENANCE INSPECTION CHECKLIST
SUPERHEAT and SUCTION PRESSURE TROUBLE SHOOTING GUIDE
TEMPERATURE PRESSURE CHART
CORRECTION FACTOR FOR SUPERHEAT MEASUREMENT
INDEX............................................................................................................................ 38, 39
1.0 INSTALLATION
There is no intent on the part of Data Aire, Inc. to define local codes or statutes which may supersede common trade practices. The manufacturer assumes no responsibility for their interpretation. Consult local building codes and the National Electrical Code for special installation requirements.
1.1 Room Considerations
Precision air conditioning equipment is designed to control spaces within close tolerances of
| temperature | and | humidity. | However, | the | room | must | be | built | with | a | proper | vapor | barrier. | A | film | of | ||
| polyethylene | is | often | used | on | walls | and | ceilings. | Walls | and | floors | must | also | be | painted | with | a | vapor- |
seal paint. Failure to provide a vapor barrier can compromise space conditions.
Introduction of outside air into the space should be minimized. Outside air in excess of 5% of the total circulated air volume can have a significant effect on the overall space conditions and result in poor space control.
1.2 Inspection
This Data Aire unit has been factory run-tested and has gone through a comprehensive inspection prior to its packaging and shipment to ensure that it arrives in excellent condition. However, shipping damage can occur and a visual inspection of the outer crating immediately upon delivery should be performed.
Note any external damage or other transportation damage on the freight carrier’s forms. Inspect the unit itself for internal damage. A claim should be filed with the shipping company if the equipment is damaged or incomplete.
Loose items such as remote control panels, disconnect switch handles, spare belts and spare filters are packed inside the unit. Refer to the yellow shipping tag located on the unit door for details.
Freight damage claims are the responsibility of the purchaser. Action to recover losses should be filed immediately. Please notify factory personnel of any claims.
1.3 Rigging
Move the unit in its upright position to the installation site. It is recommended that the unit be protected from damage to the decorative doors during any storage or moving. Removal of the decorative doors is easily accomplished and may be done when moving equipment.
The shipping skid should be left in place if the unit is being moved with a forklift. If the unit is being lifted, use spreader bars to prevent damage to the doors and panels.
The unit has 3/4” holes in the shipping skid to which casters with 3/4” stems can be attached. This allows easy movement down halls, into elevators and through doorways. If clearance is a problem the casters may be inserted directly into the bottom of the 1” tubular steel corner posts at the bottom of the unit.
Warning: Improper lifting or moving of equipment may result in damage to decorative doors, panels or frame members.
1.4 Locating the Unit
When installing the unit, sufficient space must be allowed for airflow clearance, wiring, plumbing, and service access. It is recommended that each side and front have a clearance of at least 36” to allow the doors to swing open and for servicing the unit.
The doors on some sides may not require as much service clearance. Refer to the particular unit component breakdown drawings for assistance. Rear clearance is not required, but 1” to 2” of clearance is suggested.
For the best air distribution, the unit should be centered against the longest wall, as close to the heat load as possible, unless the unit is ducted. The unit should not be placed near any corner of the room or at the end of a long, narrow room. Multiple units should be evenly spaced, as far apart as possible.
Note to Installing Contractor: Condensation formation and frequent humidifier flushing are normal functions of this equipment. Proper drain connections must be made to ensure proper removal. Unit will require water connections for condensate removal and possibly for humidifier makeup water, condenser water, chilled water and/or hot water.
Installation of units above equipment that could sustain water damage should be avoided.
1.4.1 Downflow Units
| Downflow | units | will | typically | sit | on | an | elevated | flooring | system | known | as | a | raised | floor. | The | unit | ||
| discharges | air | downward | which | pressurizes | the | raised | floor | and | channels | upward | through | perforated | ||||||
| floor | tiles. | Location | and | quantity | of | perforated | tiles | will | dictate | proper | air | distribution. | If | the | raised | |||
| floor | is | strong | enough | to | support | the | unit | and | local | codes | permit, | the | unit | can | be | placed | directly | on |
top with cutouts made for the discharge openings.
There may be additional support required in the form of adjustable jackstands. These are adjustable, threaded leveling rods which support the unit in each of the corners and in the center on longer length units. Tighten the locknuts provided with each jackstand. The baseplate can rest on the floor or on vibration isolation pads.
| Floorstands | are | also | a | way | of | supporting | the | unit. | These | are | ordered | to | the | height | of | the | floor | ||
| with | leveling | rods | to | allow | adjustment. | The | floorstand | has | lips | in | each | corner | to | align | with | the | unit | ||
| which | is | placed | on | top. | It | is | recommended | that | the | unit | frame | be | bolted | or | screwed | to | the | floorstand | |
| from | below. | Local | building | codes | may | dictate | this | procedure. | After | installation, | the | raised | floor | is |
typically built around the unit.
| The | raised | floor | serves | as | the | distribution | plenum | for | air | on | downflow | units. | Cables, |
| piping, | wiring | raceways, | inadequate | floor | height | and | any | other | restrictions | can | inhibit | ||
| proper | airflow. | Care | should | be | taken | to | avoid | restrictions. |
1.4.2 Upflow Units
Upflow units will typically be supported by vibration isolation pads and/or floorstands which may also include leveling screws. An air discharge plenum may be factory provided which ships loose and must be attached at the top of the unit frame.
Alternately, an air distribution plenum must be field fabricated with supply grilles to distribute the air. Units are shipped with a drive package to overcome external static pressure. Adjustments to the blower speed may be required to adjust to actual conditions.
1.5 Paperwork
Each Data Aire unit ships with a start-up sheet that should be completed during installation. Also included in the paperwork is a warranty/information packet that provides important wiring diagrams, specific component literature, warranty registration cards and other valuable paperwork, including a copy of this Installation/Operation and Maintenance manual.
A yellow tag is attached to the outside decorative door to indicate articles that may have been packaged and shipped loose within the unit cabinet. Typically this would be jackstands, condensate pumps and other loose components that are not factory mounted.
1.6 Storage
Your Data Aire equipment comes ready for immediate installation. In some instances it may be necessary to store the equipment for a period of time. If you must store the equipment it should be done in a dry area, out of the weather, protected from damage by other equipment in storage or transportation equipment, never stacked, and avoid frequent relocation.
If equipment is stored for longer than 30 days special precautions must be taken to avoid coil damage. All coils should be charged and sealed with a low pressure (1-3 psig) inert gas, such as nitrogen. This prevents contaminates from entering the coils; then when the seal is broken at installation, the rush of escaping gas verifies the coil is still leak free. If coils are not charged and sealed condensation mixes with air pollutants forming a weak acid and over time can cause pin hole leaks to develop in the coil tubes.
When equipment is installed after storage caution should be taken to inspect and replace, if required, rubber hoses and belts. All moving parts, such as blowers and motors, should be hand tested to ensure that they are free and clear prior to start-up. Finally, verify that all lubrication is fresh and full.
It is the responsibility of the installing contractor to return the start-up sheet and warranty registration card to Data Aire for proper activation of the unit warranty. Failure to do so may cause delays and in some cases void the warranty.
2.0 PIPING
2.1 Air Cooled Unit Piping
Refer to the attached line sizing chart on page 32 for a guideline for sizing refrigerant lines. The ultimate responsibility for line size selection is that of the installing contractor or project engineer.
Data Aire does not assume this responsibility. The chart covers distances up to 200 equivalent feet.
For installations beyond this distance, consult ASHRAE or similar references.
| Standard | piping | practice | must | be | used | to | ensure | proper | oil | return | and | efficient | operation. | |
| The | interconnecting | lines | to | the | remote | air | cooled | condenser | must | be | installed | by | a | qualified |
refrigeration mechanic.
2.1.1 Discharge lines
Discharge lines, also called hot gas lines, should be trapped at the top (inverted) and bottom as well as every 15 to 20 feet of vertical rise. Discharge line check valves are recommended on all installations, especially those where there are long pipe runs or cold climates. Check valves should be installed no less than six to ten feet from the compressor. The discharge, suction and liquid lines need to be refrigerant grade copper and in accordance with local code. All refrigeration piping should be installed with high temperature brazed joints. When brazing, a supply of nitrogen gas needs to be fed through the refrigerant lines. Be sure to open the other end of the refrigerant line to allow the nitrogen to bleed off and not pressurize the piping. Prevailing good refrigeration practices should be employed for piping support, leak testing, dehydration and charging the refrigerant circuits. During the installation the lines should be capped off and filled with dry nitrogen at the end of each day’s work or until the system is completed and sealed.
Data Aire recommends a silver/phosphorus/copper alloy with 5 to 15% silver be used to braze the refrigerant line sets to the indoor and outdoor units. Nitrogen needs to be flowing through the lines to eliminate carbon deposit buildup on the inside of the joints. Carbon could contaminate the refrigerant and restrict the metering device.
Piping must be supported within 18” of the inlet and outlet connections. The inlet connection is located on the top header of all units. The discharge outlet is located at the bottom of the header.
Discharge line pressure should not exceed 6 PSI for R-407C and 9 PSI for R-410A. Recommended gas velocity for proper oil return is 1,000 FPM. Slope horizontal lines downward in the direction of refrigerant flow (1/2” for every ten feet of line length). Discharge lines do not require insulation but due to the high temperatures of the refrigerant inside the line, the pipes may be insulated to protect against burns to individuals near or around the lines.
2.1.2 Liquid lines
Liquid line size is determined by pressure drop and velocity. The liquid line pressure drop for R-407C should not exceed 5 PSI or 9 PSI for R-410A. The recommended velocity should be between 200 and 300 FPM. To avoid excessive liquid line pressure drop, the air cooled condenser should be located above or at the same level as the evaporator. Condenser installation more than ten feet below the evaporator is not recommended. Insulation of liquid lines is not required but can be useful in preventing condensation from forming and to avoid flashing on long pipe runs.
2.1.5 Field Piping, Remote Condenser
2.1.3 Suction lines
Some applications call for the compressor(s) to be mounted as part of condenser (more commonly referred to as a condensing unit). Condensing units require field piping of liquid and suction lines. Suction lines are trapped similarly to discharge lines. Common practice for suction line selection and installation should be followed. Suction line should always be insulated.
2.1.4 Connection Sizes, Air Cooled Units
Model Hot Gas Liquid Model Hot Gas Liquid
DAA* 06 1/2” 1/2” DAA* 16 3/4” 5/8”
DAA* 08 5/8” 1/2” DAA* 20 3/4” 5/8”
DAA* 10 5/8” 1/2” DAA* 26 7/8” 7/8”
DAA* 13 3/4” 5/8” DAA* 30 7/8” 7/8”
* D - downflow, U - upflow
Field connections at the indoor evaporator and remote condenser or condensing unit
| will | not | necessarily | be | the | same | as | the | field | pipe | size | required. | In | some | cases | these | will |
| vary | significantly. |
One Circuit Shown
2.2 Water/Glycol Cooled Unit Piping
| The | required | filed | installed | fluid | cooler | pipe | sizes | may | or | may | not | be | the | same | as | the | |
| connection | sizes | at | the | fluid | cooler. | (Refer | to | 2.2.2 | and | 2.2.3 | for | connection | sizing). | This | will |
depend on the length of pipe and the calculated pressure drop of peripheral components.
Water cooled units may also be connected to building water or tower water sources. Pipe size will depend on length of run and the maximum water flow required.
| Shut-off | valves | (field | provided) | should | be | installed | within | a | few | feet | of | the | inlet | and | outlet | ||
| connections | of | the | evaporator | to | allow | the | unit | to | be | isolated | for | service. | Drain/fill | valves | should | be |
located at the lowest point on the connected piping.
| All | water/glycol | cooled | units | are | shipped | with | plate/fin | heat | exchangers | as | standard | equipment. | ||||||
| A | strainer | is | shipped | loose | and | is | to | be | field | installed | in | the | supply | line | with | shut-off | valves | (field |
provided) before and after the strainer. The strainers and water/glycol piping must be cleaned on a periodic basis. If the unit is shipped with shell and tube condensers, strainers are not required nor shipped with unit.
One of the most common problems is a water/glycol system is the presence of air in the condenser water loop. Air vents must be installed in various locations in the piing system to purge the air.
Glycol system piping may include a centrifugal pump (or pumps for redundancy). Pumps must be primed before operating per the pump manufacturers guidelines.
2.1.6 Field Piping, Remote Condensing Unit
One Circuit Shown
2.2.1 Field Piping, Glycol System
2.2.2 Connection Sizes, Water/Glycol Cooled Units
Evaporator Water IN and OUT Evaporator Water IN and OUT Model Connections, OD Model Connections, OD
DAW/G 06 1-5/8” DAW/G 16 2-1/8”
DAW/G 08 1-5/8” DAW/G 20 2-1/8”
DAW/G 10 1-5/8” DAW/G 26 2-1/8”
DAW/G 13 1-5/8” DAW/G 30 2-1/8”
2.2.3 Connection Sizes, Fluid Coolers
Fluid Cooler Water IN and OUT Fluid Cooler Water IN and OUT Model Connections, OD Model Connections, OD
DAFC 06 1-5/8” DAFC 37 2-5/8”
DAFC 07 1-5/8” DAFC 40 2-5/8”
DAFC 09 1-5/8” DAFC 44 2-1/8”
DAFC 11 2-1/8” DAFC 50 2-5/8”
DAFC 15 2-1/8” DAFC 57 2-5/8”
DAFC 17 2-5/8” DAFC 61 2-5/8”
DAFC 21 2-1/8” DAFC 75 2-5/8”
DAFC 24 2-5/8” DAFC 80 2-5/8”
DAFC 28 2-5/8” DAFC 88 2-5/8”
DAFC 30 2-1/8” DAFC 100 2-5/8”
Models DAFC 57 and larger are double-wide units. Although the header connection for each section is 2-5/8”, each unit comes with a factory provided manifold kit with 3-1/8” field connections.
(Field Provided)
2.3 Auxiliary Chilled Water Coil Piping
Units with an Auxiliary Chilled Water cooling coil require a separate source of chilled water. These chilled water connection sizes will be equal to the condenser water connection sizes on the chart in Section 2.2.2. Units with an Energy Saver cooling coil have shared piping with the condenser supply and therefore do not require a separate water source.
All chilled water pipes have a cap installed on the end of the pipe for pressure testing the system.
These caps need to be removed before installing the water piping to the unit. Use a tube cutter for smaller pipes and reciprocating saw with a metal cutting blade for larger pipes or if there is a clearance problem. All connections need to be cleaned before connections are brazed together.
2.4 Condensate Drain Piping
Every indoor unit has a 3/4” copper stub provided for condensate removal. A union is recommended at the field connection which will permit easy disconnection from the unit for cleaning.
A trap should be built into the drain line to prevent air from backing up into the unit. Drain lines should be pitched downward not less than 1/4” for each ten feet of horizontal run. Do not reduce the size of the drain line. Where local code permits, PVC pip may be used.
Some applications have no convenient means of allowing a gravity drain. In this case, a condensate pump can be used. These come either factory mounted or shipped loose. Factory mounted condensate pumps do not require a separate power source.
Condensate pumps shipped loose (or field provided) typically require a dedicated 110 volt power source. Field pipe connections must be made to the pump discharge connection. A check valve must be installed to prevent short cycling. See also condensate pump electrical requirements in Section 3.9.
2.5 Humidifier Piping
2.5.1 Steam Generator Humidifier
| The | standard | humidifier | on | Data | Aire | systems | is | a | steam | generator | type | with | a | disposable | cylinder. | |
| The | humidifier | makeup | water | should | be | brought | to | the | humidifier | through | the | field | connection | opening | ||
| using | 1/4” | copper | tubing. | A | compression | fitting | is | provided | at | the | humidifier. |
A shutoff valve should be provided outside the air conditioner to allow disconnection for service.
An in-line water pressure regulator and strainer should be installed. Water pressure should be set between 30 and 80 PSI.
| The | humidifier | has | a | drain | at | the | bottom | which | is | factory | piped | to | the | main | condensate | drain | line. | |
| The | dispersion | tube | also | has | a | drain | line. | No | additional | field | piping | is | required. |
2.5.2 Dry Steam Humidifier
| The | optional | dry | steam | type | humidifier | requires | a | strainer | on | the | inlet | steam | line. | An | outlet | ||
| connection | with | a | field-provided | steam | trap | is | also | required. | Steam | pressure | is | typically | 10-15 | psi. |
2.6 Leak Testing
No installation is complete until the entire system has been thoroughly checked for leaks.
This includes checking refrigerant tubing, flare fittings, pressure controls, Shrader fittings and compressor rota-lock service valves.
| In | addition | to | the | refrigeration | system, | check | all | condenser | water | lines, | humidifier | makeup | lines, | |
| condensate | lines, | condensate | pumps, | chilled | water | lines, | centrifugal | pumps, | and | fluid | coolers | as |
applicable.
With recent changes in the handling and recovery of refrigerant, it is not permissible to release refrigerant into the atmosphere. Many leak-test methods recommended in the past are no longer possible. Current standard practices must be used.
Pressurize system circuit to 150 PSIG (1034kPa) by using dry nitrogen with a trace of refrigerant.
| Check | the | entire | system | for | leaks | with | suitable | leak | finder, | (per | local | code) | including | but | not | limited | |
| to | all | braze | joints, | caps, | fittings | and | flare | nuts | on | both | field | and | factory | furnished | components. | After |
completion of leak testing, release test pressure and pull a vacuum on the system.
Tightening of fittings and valves is the responsibility of the installing contractor.
2.7 Evacuation
Evacuate the refrigerant lines, condenser coil and evaporator coil to 250 microns or lower (a micron gauge and 2-stage vacuum pump are required). Valve off and turn off the vacuum pump and wait for at least 15 minutes to make sure the micron gauge reading does not go back above 700 microns. If it does, restart the vacuum pump and evacuate until the system reaches 250 microns.
If the system still does not hold the pressure below 700 microns the system needs to be rechecked for leaks.
After the system has been satisfactorily evacuated the lines can be charged with refrigerant.
Connect the pressure gauge manifold set to the high and low ports near the compressor. Connect the charging line to the refrigerant tank and set it for liquid feed. Open the refrigerant tank valve and purge the line at the manifold, then open the high side valve on the manifold only and allow the refrigerant flow until the system pressure equalizes. At this point the system will have 75 to 80% of the total refrigerant charge. Start the blower(s) and then the compressors checking the operating pressures and temperatures.
NOT APPLY POWER TO THE COMPRESSOR WHEN IN A VACUUM
3.0 ELECTRICAL CONNECTIONS
Before proceeding with the electrical connections, make certain that the volts, hertz, and phase correspond to that specified on the unit electrical nameplate. Use copper conductors only.
3.1 Electrical Service
Check to be sure the service provided by the utility is sufficient to handle the additional load imposed by this equipment. Most units with secondary heat exchangers will require a separate power source and field-provided, interconnecting control wires. See section 3.5 below.
| Remote | condensers | will | typically | require | one | power | source. | Glycol | systems | with | fluid | coolers | and | ||
| loose | pump(s) | typically | require | one | power | source | for | the | fluid | cooler | and | will | require | one | additional |
source for a single pump or two additional sources for dual pumps. Systems where the pump(s) are mounted and piped integral to the fluid cooler will usually require a single power source.
3.2 Nameplate Ratings
Refer to the unit electrical nameplate for equipment electrical requirements. Minimum Circuit Ampacity (MCA) also known as wire sizing amps, will dictate the minimum required wire gauge.
Maximum Overcurrent Protection (MOP) device amps will dictate the maximum circuit breaker or fuse size.
3.3 Grounding
The unit cabinet must have an uninterrupted true earth ground. An electrical ground wire of adequate size must be connected to the ground lug provided inside the main electrical box.
3.4 Voltage Tolerance
The supply voltage to the unit must be within tolerance; -5% to +10% for 208-230 voltage, +10% for 460 volts. Phase to phase imbalance must not exceed 3%. The local utility company should be contacted for correction of improper line voltage. Deviation from ratings can cause premature failures and possibly void unit warranty.
3.5 Auxiliary Control Wiring
For secondary heat exchangers (condensers and fluid coolers) connect two 18 gauge wires from the electrical box of the indoor evaporator to the electrical box of the remote heat exchanger. Follow the wiring diagrams for each of these pieces of equipment. On most evaporators the terminals will be #46 and #47. On most remote heat exchangers the terminals will be #39 and #40. All control wiring on Data Aire equipment is 24 VAC. Condensing units (compressors mounted in condenser) typically require more wires, refer to wiring diagrams.
Check the wiring connections in the unit control panel to ensure they are tight. Screw terminals may become loose in transit. Tightening of wiring connections is the responsibility of the installing contractor.
3.6 Remote Shutdown
Every Data Aire evaporator has remote shutdown contacts. These are intended for a field supplied dry contact or switch to be wired across two terminals. When the contact or switch opens, the control circuit power is interrupted and the unit shuts down, including the control panel. The control circuit is 24 VAC and the field provided contact or switch should have a minimum rating of 10 amps.
The remote shutdown contacts are always terminals #1 and #2 on the terminal block designated TB2. The unit will ship with a factory wired metal jumper clip that connects terminal #1 to terminal #2. Remove this clip prior to installing the field wires.
3.7 Remote Alarm Contacts
The dap4 microprocessor control provides four (4) remote alarm output contact that can be field accessed on terminals # 11, 12 and 13 of terminal block TB2. Terminal # 12 is a Normally Closed (NC) open on Alarm dry contact. Terminal # 13 is a Normally Open (NO) close on alarm dry contact. Both are intended to be used in a control circuit not exceeding 2 amps at 24VAC.
These programmable output contacts will close or open on a failure and will remain open or closed until the alarm is no longer present.
Three (3) additional alarm output contacts are available. The terminal designations for these alarms contacts are as follows:
# 40 – Remote Alarm 2 (Common) # 41 – Remote Alarm 2 (Normally Closed) # 42 – Remote Alarm 2 (Normally Open) # 43 – Remote Alarm 3 (Common) # 44 – Remote Alarm 3 (Normally Closed) # 45 – Remote Alarm 3 (Normally Open) # 48 – Remote Alarm 4 (Common) # 49 – Remote Alarm 4 (Normally Closed) # 50 – Remote Alarm 4 (Normally Open)
3.8 Remote Sensors
Remote sensors are optional. Although existing unit mounted sensors can be removed for remote mounting, the remote sensor option provides a more convenient means of field installation. This is because the sensors are already connected to a predetermined length of cable and come mounted in a remote sensor enclosure. The temperature and humidity sensors require a total of five wires, these should be a twisted, shielded cable.
3.9 Condensate Pumps
Condensate pumps which ship loose normally require a separate source of 110 volt power. Always check the pump power requirements before connecting power. Condensate pumps are available in other voltages.
Condensate pumps may also come unit mounted and powered. While no outside power source is required, field piping is still a requirement.
Condensate pumps are wired to display a “High Condensate Water Level” alarm. The wiring for this must be done in the field on pumps that ship loose. Factory mounted pumps come pre-wired.
3.10 Condensate Probe
| A | condensate | probe | for | sensing | under | floor | water | is | included | with | this | unit. | This | comes | in | a | plastic | |||
| bag, | with | about | 15 | feet | of | coiled-up | wire. | The | probe | is | a | flat | plate | that | is | typically | placed | below | the |
unit in a location where water is likely to accumulate.
Place the probe flat on the floor on top of a thin layer of non conductive silicone. Secure the attached wires where necessary. A longer length of wire may be used if required.
Note: Failure to uncoil the length of wire attached to the condensate probe can result in a nuisance water-detected alarm. If the probe is not going to be used it should be disconnected.
3.11 Water Sensing Cable
Some units may be equipped with a water sensing cable. The cable is connected to the terminal board and ready for installation. Cable lengths will vary depending on the original order and specifications. Typically, the cable is installed around the unit’s perimeter. The cable is supplied with holding clips. Care should be taken when installing the cable. Be sure the cable is not touching metal and/or any debris under the raised floor.
4.0 INSTALLATION OF REMOTE HEAT EXCHANGER
Air cooled condensers and fluid coolers have individual Selection Guide/Operation and Maintenance manuals which should be referred to for more complete details.
4.1 Rigging
Secondary heat exchangers matched with evaporators of this size are typically remote, outdoor type. The heat exchanger should be moved to its (typically rooftop) mounting location using a crane or fork lift. Each fan section has heavy, steel leg supports with lifting holes at the top.
Do not lift with a choke sling around the unit. Spreader bars are recommended for lifting multiple fan units. Under no circumstances should the coil headers or piping be used for lifting the unit.
Ideally, the unit should be kept in its shipping crate until it is ready to be set in place.
4.2 Leg Assembly
The legs must be unbolted from their collapsed shipping position and extended prior to placing the unit on its pad. Each leg extends down approximately 18” and reattaches using the same bolts.
Note: Failure to extend the legs will result in poor air distribution over the cooling coil resulting in significant capacity reduction.
NOTE: Failure to extend the legs will result in poor air distribution over the cooling coil resulting in significant capacity reduction. DAMAGE CAUSED TO THE COMPRESSOR(S) DUE TO
OVERHEATING IS NOT COVERED BY DATA AIRE’S WARRANTY.
Concrete pads are often used to provide support for the heat exchanger. Bolt holes in the bottom of each leg can be used to anchor the unit.
4.3 Locating the Remote Heat Exchanger
The remote heat exchanger must be located in an area that will ensure free air flow into and out of the heat exchanger plus adequate service access clearance. Short circuiting of the air flow or the intake of warmer air from another unit will seriously degrade the performance of the air cooled heat exchanger.
Do not locate the heat exchanger in a location that is bordered by tall obstructions (i.e. higher than 10 feet) on no more than two sides. See figure at right for minimum clearance from obstructions and between units. With proper clearance on all sides, two units can be placed at least 48 inches apart.
Noise factors should also be considered when locating an air cooled heat exchanger. Proximity to windows, walls and surrounding structures can cause objections by the occupants. An acoustical expert should be consulted when noise is of a particular concern.
Air cooled heat exchangers should be placed at a level that is higher than the indoor evaporator.
The mounting of the remote heat exchanger more than 10 feet below the evaporator is not recommended. Excessive liquid line pressure drop can cause poor evaporator performance.
Piping must be supported within 18 inches of the inlet and outlet connections. The inlet connection is located on the top header on all remote heat exchangers and the outlet connection is located on the bottom header of all units.
4.4 Electrical Service
Refer to Sections 3.1 to 3.5 for information regarding line voltage and control voltage wiring details.
4.5 Air Cooled Condensers - Model DARC
4.5.1 Fan Speed Control
The standard Data Aire condenser (DARC) utilizes a fan speed controller. On single fan condensers this is the only means of control.
| Multiple | fan | condensers | are | provided | with | fan | speed | control | on | the | first | motor | (nearest | the | header). | |||
| The | fan | speed | control | is | pre-programmed | and | there | is | no | need | to | adjust | the | unit | in | the | field. | The |
header fan will cycle with the head pressure of the unit.
Units shipped with R-407C the starting pressure is 220 PSIG and the fan will be at full speed at 285 PSIG. Units shipped with R-410A the starting pressure is 320 PSIG and the fan will be at full speed at 400 PSIG. The second fan operates in conjunction with the speed controlled fan. The fan speed control powers ON the auxiliary and shifts the speed controlled fan to a new start pressure.
4.5.2 Ambient Thermostats
Additional motors (subsequent to the fan speed control operated motors) multiple fan heat exchangers are cycled by ambient sensing thermostats. These thermostats have a capillary tube with remote sensing bulb. They function best with the sensing bulbs mounted below the coil, away from exposure to direct sunlight with the bulb in the vertical position. An instruction set comes as part of a mounting kit that includes a sheet metal bracket, mounting clamps and TEK screws. This includes directions for field mounting and adjustment. Desired head pressure should be maintained at approximately 340-400 PSIG for R-410A and 230-270 PSIG for R-407C.
Typical settings for the ambient thermostats are as follows:
Number of Fans Header Fan Fan 2 Fan 3 Fan 4 Fan 5 2 FSC Pressure Control 3 FSC Pressure Control 75° 4 FSC Pressure Control 85° 75° 5 FSC Pressure Control 85° 75° 65°
4.6 Fluid Coolers - Model DAFC
4.6.1 Fluid-Sensing Thermostats
Fluid cooler fan motors are cycled on and off by individual water-sensing thermostats strapped
| to | the | leaving | water | header. | The | first | fan | motor | will | only | have | a | thermostat | if | the | unit | has | an | Energy | |
| Saver | Coil. | Without | the | optional | Energy | Saver | Coil, | the | first | fan | motor | runs | whenever | there | is | a | call |
for cooling via an auxiliary signal sent by the indoor evaporator (see Section 3.5).
The water-sensing thermostats have adjustable setpoints which are typically staggered to maintain water temperature in the 85° to 105° F range. This is generally the desired range for glycol cooled systems.
A surge tank is standard on all fluid coolers. This is sufficient on most applications. However, an expansion tank should be installed at the highest point in the system and the point of least pressure.
4.6.2 Energy Saver Cooling
In colder climates, the evaporator will often be equipped with an additional free cooling coil to take advantage of the colder ambient temperatures. When incoming fluid falls below the setpoint of a water-sensing thermostat in the evaporator (typically about 50° F), energy saver cooling becomes available.
| Systems | with | an | Energy | Saver | Coil | should | have | at | least | one | fluid-sensing | thermostat | on | the | fluid | |
| cooler | set | lower | to | take | advantage | of | colder | ambient | temperatures. | The | desired | fluid | temperature | |||
| for | energy | saver | cooling | is | 45° | F. | Field | adjustment | of | fluid-sensing | thermostats | is | not | unusual. |
| It | is | desirable | to | use | the | energy | saver | mode | as | much | as | possible. | However, | fluid | temperature | ||
| that | is | too | cold | can | cause | excessive | dehumidification | and | coil | sweating. | Fluid | temperature | that | is |
too high can also cause the indoor space temperature to rise. This could cause the evaporator’s microprocessor control to lock out the energy saver mode for one hour while it reverts back to compressor (mechanical) cooling. Adjust the setpoints of the thermostats to allow the maximum free cooling time. Over cooling or under cooling the fluid should be avoided.
Every application will have a different ambient temperature and indoor heat load/air
| distribution | profile. | Therefore | it | is | not | possible | to | dictate | the | exact | water-sensing | thermostat | |
| setpoints. | Field | adjustments | are | typical | to | allow | fine-tuning | to | specific | conditions. |
5.0 CHARGING
5.1 Voltage Phase Check
5.1.1 Evaporator
Prior to charging, the correct voltage phasing should be checked on the indoor evaporator. It is easiest to check the blower direction on the evaporator with standard poly-phase motors by momentarily moving the blower manual bypass switch located in the dap4 manual override module to the ON position, then back to the OFF position. Reverse any two of the three line voltage wires at the line voltage field connection point to change the blower rotation.
Although scroll compressors are phase dependent, units shipped from the factory are run tested, ensuring the compressor rotation is consistent with the evaporator fan motor. However, a field change-out of a compressor may require checking proper phase. An out-of-phase compressor will draw relatively low amps and both suction and discharge pressures will remain nearly equal.
5.1.2 Secondary Heat Exchanger
The secondary heat exchanger may be ordered as three phase but the individual fan motors are single phase and will only run in one direction. Check operation by placing a momentary jumper
| across | low | voltage | field | terminals | # | 30 | and | # | 40. | (Disconnect | pumps | on | glycol | systems | unless | already | |
| filled | with | water/glycol | solution.) | This | will | energize | the | control | circuit. | Fans | may | not | turn | because |
either the thermostat setpoint is above the current ambient temperature or the # 1 fan (on air cooled condensers with fan speed control) has not reacted to the head pressure. On systems with R-410A the fan will not operate until the head pressure is beyond 300 PSIG. Units with R-407C the head pressure must reach 200 PSIG.
5.2 Important Refrigeration Components
5.2.1 Expansion Valve
Each refrigerant circuit has an adjustable thermo-expansion valve (TXV). These are factory adjusted to their nominal rating. Any field adjustment should be to fine tune a system that has stabilized and already has acceptable operating parameters. Adjusting a TXV to produce large swings in superheat is not recommended.
5.2.2 High Pressure Cutout Switch
Each refrigerant circuit is protected by a high head pressure cutout switch with manual reset button. The switch is typically located in the evaporator near the compressors.
The pressure rating for R-410A is 610 PSIG. The pressure rating for R-407C is 400 PSIG.
5.2.3 Low Pressure Cutout Switch
Each refrigerant circuit has a low pressure cutout switch with automatic reset. The switch is located near the compressors.
The pressure rating for R-410A is 50 PSIG. The pressure rating for R-407C is 28 PSIG.
5.3 Air Cooled Systems
5.3.1 Fan Speed Control System Charging
The standard air cooled condenser provided with Data Aire equipment has fan speed control on the lead motor (nearest the header). After the field refrigerant piping is properly completed connect the refrigerant drum to the low side and charge with vapor. (Refer to Section 2.6 LEAK TESTING and Section 2.7 EVACUATION prior to charging the system.)
It is likely that more refrigerant will be required to complete the charging procedure (line runs need to be taken into account). Make sure all hoses are properly purged. From a vacuum feed liquid refrigerant into the high side of the system until the pressure equalizes. At this point there will be about 70-80% of the total charge in the system.
Before starting a compressor, the crankcase heater should be energized for a minimum of 12 hours to reduce the possibility of liquid slugging on start-up. Failure to energize the crankcase heater could result in compressor damage.
If the system is charged from a vacuum, the preheating of the compressor is not necessary. Start the system and allow the system to stabilize to room temperature. Bubbles in the sight glass are not unusual at this point and can be caused by flashing from liquid line pressure drop, low sub-cooling or low charge. It is likely that more refrigerant will be required to complete the charging procedure.
Adjust the refrigerant charge until the sub-cooling is between 8 and 10°F. There may be flashing and/or bubbles in the sight glass when the system is properly charged.
The system should be allowed to stabilize for 15 to 20 minutes before meaningful measurements can be taken. After the system is allowed to stabilize, verification of a few key measurements should be noted. The discharge pressure with R-410A should be between 340-415 PSIG and the sub-cooling should be between 8-10°F depending on ambient conditions. Units with R-407C the discharge pressure should be between 240-295 PSIG. Suction temperature should be 100 PSIG or greater with R-410A and 58 PSIG or greater with R-407C. Measure the superheat at the compressor suction line at least 6 inches away from the compressor. The superheat should be between 8-15°F.
Note: Charging to a full liquid line sight glass should never be the sole means of determining the correct refrigerant charge. Other parameters such as superheat, suction pressure, head pressure, sub-cooling and ambient temperature are also important. A system charged to a clear sight glass is often overcharged.
5.3.2 Flooded System Charging
Flooded type systems are units having refrigerant circuits with an optional liquid receiver and head pressure control valve. When the ambient temperature falls during cold weather, the head pressure
| control | valve | will | regulate | the | flow | of | refrigerant | to | ensure | nearly | constant | receiver | pressure. | The | ||
| condenser | is | partially | flooded | with | liquid | in | cold | weather. | In | warm | weather | the | extra | refrigerant | is |
stored in the receiver.
Flooded systems require more refrigerant than fan speed control systems. Connect the pressure gauge manifold set to the high and low ports near the compressor. Connect the charging line to the refrigerant tank and set it for liquid feed. Open the refrigerant tank valve and purge the line.
Open the high side valve on the manifold only and allow the refrigerant to flow until the system pressure equalizes. At this point the system will have 78-85% of the total refrigerant charge.
Start the (evaporator) motor(s). Start the compressor(s) and check the operating pressures and temperatures.
A quick and easy way to run the blower and compressor is using the manual switches on the unit’s microprocessor. Switch the blower and compressor manual switches to the ON position. All automatic control is disabled but safety switches will remain functional.
Before starting a compressor, the crankcase heaters should be energized for a minimum of 12 hours to reduce the possibility of liquid slugging on start-up. Failure to energize crankcase heaters could result in compressor damage.
Start the evaporator fan and verify the fan rotation. From a vacuum, add liquid refrigerant to the high side of the system until the pressures equalize. Start the compressor. Check the liquid line sight glass to get a feel for the approximate charge. Bubbles in the sight glass are not unusual at this point and be caused by flashing from liquid pressure drop, low sub-cooling or low charge. It is likely that more refrigerant will be required to complete the charging procedure.
If the receiver (head) pressure is below 350 PSIG for R-410A, block part of the condenser coil surface until the pressure rises to 350 PSIG or higher. If the receiver (head) pressure is below 230 PSIG with R-407C, block part of the condenser coil surface until the pressure rises to 230 PSIG or higher. During extremely cold weather all the condenser fans have to be de-energized to maintain head pressure. Add refrigerant to the system until the ball in the sight-glass is at the 1/3 level.
After the system is allowed to stabilize, the superheat at the compressor suction line (reading from at least 6 inches from the sight glass) should be 8 – 15°F. Remove any blocks that may have been used on the condenser coil. If the ambient temperature is below 60°F, some of the refrigerant will be backed up in the condenser coil causing the liquid level in the receiver to drop (this is normal).
Note: Charging to a full liquid line sight glass should never be the sole means of determining the correct refrigerant charge. Other parameters such as superheat, suction pressure, head pressure, sub-cooling and ambient temperature are also important. A system charged to a clear sight glass is often overcharged.
5.4 Water/Glycol Cooled Systems
5.4.1 Water/Glycol Cooled Systems Charging
All water/glycol cooled units are factory charged with refrigerant. The water regulating valve should be adjusted to maintain a discharge pressure between 340–390 PSIG for R-410A and 230- 260 for R-407C. Saturated suction pressure should be 100 PSIG or higher with R-410A and 58 PSIG or greater with R-407C. The superheat at the compressor suction line at least 6 inches away from compressor should be between 8-15°F.
Field charging water/glycol system should be done by referring to the unit electrical nameplate for factory charge. Although this figure represents the original factory charge, it is still necessary to measure and note proper unit operation including superheat, head and suction pressure. Some adjustment to charge may be required.
Adjust the refrigerant charge until the sight glass clears or has only sparse bubbles. The unit should be allowed to stabilize for several minutes before meaningful measurements can be taken and the conditioned room should be at or near the temperature setpoint.
All water/glycol cooled units have a water regulating valve. A head pressure transducer is
| connected | to | a | shraeder | fitting | on | the | discharge | line | and | water | is | regulated | into | the | condenser | coil. |
| Plate | fin | condensers | are | standard. |
Before starting a compressor, the crankcase heaters should be energized for a minimum of 12 hours to reduce the possibility of liquid slugging on start-up. Failure to energize crankcase heaters could result in compressor damage.
Note: Charging to a full liquid line sight glass should never be the sole means of determining the correct refrigerant charge. Other parameters such as superheat, suction pressure, head pressure, sub-cooling and ambient temperature are also important. A system charged to a clear sight glass is often overcharged.
5.5 Refrigerant Handling
The use of recovery/recycling units is required by U.S. Environmental Protection Agency (EPA) regulations. Technicians who service and dispose of air conditioning and refrigeration equipment must recover the refrigerant instead of venting it to the atmosphere.
Except for extremely small releases of refrigerant such as what occurs when disconnecting service hoses (diminimous release), a technician who knowingly releases or vents refrigerant to the
| atmosphere | is | in | violation | of | this | regulation. | Freon | purchasers | must | be | certified | technicians | and |
| have | a | valid | EPA | certification | card. |
Warning! Pressure relief lines(s) must be vented to the atmosphere per the latest edition of ASHRAE Standard 15 and/or any local building, fire or mechanical codes.
This applies to all units with either sell and tube condensers or high pressure relief valve options.
6.0 GLYCOL SYSTEMS
6.1 Glycol Concentration
The system must be filled with water and the appropriate amount of ethylene or propylene glycol to protect against winter freeze-up. To achieve the approximate glycol concentration, it is necessary to know the total system volume. This consists of the sum of the fluid cooler volume, the evaporator unit volume, and the volume of the interconnecting piping.
The following tables can be used for arriving at an approximate system volume. After installation, the glycol percentage should be checked. The glycol percentage should also be checked at regular intervals to ensure freeze protection.
6.2 Internal (Fluid) Volume - Downflow Models
Evaporator Without Energy Saver Coil With Energy Saver Coil Model Volume, Gallons Volume, Gallons
DAGD 06 4.0 9.1
DAGD 08 4.5 9.6
DAGD 10 5.0 10.1
DAGD 13 5.5 10.6
DAGD 16 7.5 16.3
DAGD 20 8.0 16.8
DAGD 26 10.0 18.8
DAGD 30 12.0 22.9
6.3 Internal (Fluid) Volume - Upflow Models
Evaporator Without Energy Saver Coil With Energy Saver Coil Model Volume, Gallons Volume, Gallons
DAGU 06 4.0 8.2
DAGU 08 4.5 8.7
DAGU 10 5.0 9.2
DAGU 13 5.5 9.2
DAGU 16 7.5 15.9
DAGU 20 8.0 16.8
DAGU 26 10.0 16.3
DAGU 30 12.0 23.1
Note: Add 25% more for Shell and Tube condenser coils.
6.4 Fluid Cooler Internal Volume
Fluid Cooler Internal Volume Model Volume, Gallons
DAFC 06 2.5
DAFC 07 3.4
DAFC 09 4.2
DAFC 11 3.3
DAFC 15 4.9
DAFC 17 6.6
DAFC 21 7.4
DAFC 24 9.8
DAFC 28 12.3
DAFC 30 9.8
Fluid Cooler Internal Volume Model Volume, Gallons
DAFC 37 13.0
DAFC 40 16.3
DAFC 44 16.2
DAFC 50 20.3
DAFC 57 24.6
DAFC 61 19.6
DAFC 75 26.0
DAFC 80 32.6
DAFC 88 32.4
DAFC 100 40.6
6.5 Copper Piping Internal Volume
Pipe Diameter Volume per 100 Feet inches of Pipe, Gallons 5/8 1.2 3/4 1.8 7/8 2.5 1-1/8…