FA4528-16-R-0002-U0005.pdf
PDF 24 KB Posted
- Attached to
- Install MAF Cable Fence Federal contract opportunity
- Solicitation number
- FA4528-16-R-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_7_-_Questions_and_Answers_-_11_March.docx | DOCX document | |
| Attachment_10_Questions_and_Answers.docx | DOCX document | |
| FA4528-16-R-0002-U0004.pdf | ||
| Attachment_2_-_Drawings_Revised_March.pdf | ||
| Attachment_9_-_Fence_Pictures.pdf | ||
| Attachment_8_-_Gate_Pictures.pdf | ||
| Attachment_7_-_Questions_and_Answers.docx | DOCX document | |
| FA4528-16-R-0002-U-0003.pdf | ||
| Attachment_4_Past_Performance_Information_Form.docx | DOCX document | |
| FA4528-16-R-0002-U00002.pdf | ||
| Amendment_0001_Site_Visit_Details.pdf | ||
| FA4528-16-R-0002-0001_5Feb16.pdf | ||
| FA4528-16-R-0002_MAF_Cable_Fence.pdf | ||
| Attachment_5_Financial_Responsibility.docx | DOCX document | |
| Attachment_3_Wage_Determination.pdf | ||
| Attachment_1_Specifications.pdf | ||
| Attachment_4_Past_Performance_Information_Form.docx | DOCX document | |
| Attachment_2_Drawings.pdf | ||
| MAF_Cable_Fence_Solicitation.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QJVF 07-6017
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A) Allow for the potential of a second w inter exclusion.
B) Revise question 28 Attachment 7 response to allow the contractor to w ork on up to tw o Missile Alert Facilities at one time.
C) Add questions 98 through 107 to Attachment 7.
D) Reduce the offer acceptance period from 225 days to 200 days.
E) Replace Attachment 6 Construction Cost Breakdow n w ith revised.
F) The Point of Contact (POC) for this amendment is SrA John King at 701-723-2262 or John.King.49@us.af.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4528-16-R-0002
X 9B. DATED (SEE ITEM 11)
29-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Mar-2016
CODE
5 CONS
165 MISSILE AVENUE
MINOT AFB ND 58705-5027
FA4528 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4528-16-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The offeror acceptance period has decreased by 25 from 225 to 200.
The required performance has changed from 1) Project Title: MAF Anti-Ram Cable Fence.2) Location: Minot AFB.3) This acquisition is 100% Small Business Set-Aside.4) Award of this solicitation will result in a Firm-Fixed Price (FFP) contract.5) 365 days Period of Performance. 1 winter exclusion period.6) Magnitude: $1,000,000.00 - $5,000,000.00.NOTE 1: The US Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. NOTE 2: Notice to Offerors: Funds are not presently available for this effort. Please see Section L for more information.NOTE 3: Site Visit is HIGHLY RECOMMENDED, however, not mandatory. Please see Section L and FAR 52.236-27 for more information. Only one site visit will be conducted. to 1) Project Title: MAF Anti- Ram Cable Fence.2) Location: Minot AFB.3) This acquisition is 100% Small Business Set-Aside.4) Award of this solicitation will result in a Firm-Fixed Price (FFP) contract.5) 365 days Period of Performance. Winter exclusion period from 15 Nov to 15 Apr.6) Magnitude: $1,000,000.00 - $5,000,000.00.NOTE 1: The US Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. NOTE 2: Notice to Offerors: Funds are not presently available for this effort. Please see Section L for more information.NOTE 3: Site Visit is HIGHLY RECOMMENDED, however, not mandatory. Please see Section L and FAR 52.236-27 for more information. Only one site visit will be conducted..
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from SERVICES NON-PERSONAL: The contractor will provide all plant, labor, material, tools, parts, equipment, and transportation to and from job site necessary to accomplish project QJVF 07-6017 in accordance with attached specifications and drawings. This installation will be at 15 different MAFs throughout the state of North Dakota.
Period of performance is 365 days after issuance of Construction Notice to Proceed (NTP) which includes one winter exclusion period from 15 Nov 16 through 15 Apr 17.Attachment 6 - Offeror Schedule shall be filled in and included with the proposal for the CLIN total. to SERVICES NON-PERSONAL: The contractor will provide all plant, labor, material, tools, parts, equipment, and transportation to and from job site necessary to accomplish project QJVF 07-6017 in accordance with attached specifications and drawings. This installation will be at 15 different MAFs throughout the state of North Dakota.
Period of performance is 365 days after issuance of Construction Notice to Proceed (NTP) which includes one winter exclusion period from 15 Nov through 15 Apr.Attachment 6 - Offeror Schedule shall be filled in and included with the proposal for the CLIN total..
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
No. Title/Description Pages Date
FA4528-16-R-0002
1 Specifications 45 September 2015
2 Drawings 6 November 2015
3 Davis Bacon Wage Rates ND160015
01/08/2016 ND15
5 8 January 2016
4 Past Performance Information Form 4 N/A 5 Financial Responsibility Questionnaire 1 N/A 6 Revised Construction Cost Breakdown N/A 11 March 2016 7 Questions and Answers 11 11 March 2016 8 MAF Pictures 10 N/A 9 Fence Pictures 49 N/A 10 Additional Questions ans Answers 3 9 March 2016
Attachments 1 – 10 are available on the Federal Business Opportunities (FBO) website.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .