FA4528-10-R-0027
Section B - Supplies or Services and Prices
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
Lump Sum
Install Hangar Door
FFP
Furnish all plant, labor, equipment and materials necessary to accomplish Project MIN 08-0145, Install Hangar Door for building 899 in accordance with the specifications and drawings. Work is 83% General, 4% Mechanical, 13% Electrical. The government will furnish water and electricity. Work is not in a restricted area. Performance period is 120 days after issuance of notice to proceed. Winter exclusion is included from 15 Nov - Apr 15. A 1-year warranty of construction applies.
FOB: Destination
NSN: Z129-10-INS-DOOR
SIGNAL CODE: A
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
120 days after acknowledged Notice to Proceed.
5 CONS
ATHENA A. OLMSTEAD
211 MISSILE AVENUE
MINOT AFB ND 58705-5027
701-723-2262 FOB: Destination
FA4528
Section G - Contract Administration Data
WAWF INSTRUCTIONS
Wide Area Work Flow DODAAC and Email Distribution Table
Questions concerning payment should be directed to the Defense Finance Accounting Services (DFAS) at (800) 390-5620 or (800) 337-0371. Please have your order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at: www/dfas.mil/money/vendor
Payments may be expedited electronically via Internet through the Wide Area Workflow (WAWF) system for more info go to https://wawf.eb.mil
Note: Use of WAWF is mandatory. Use of WAWF will speed up your payment processing time and allow you to monitor your payment status online. There are no charges or fees to use WAWF. For more info contact us at 1-701-723-2262 or email athena.olmstead@minot.af.mil.
The following codes will be required to route your invoices and additional E-mails correctly through WAWF.
CAGE CODE:
ISSUE BY DODAAC: FA4528
ADMIN DODAAC: FA4528
INSPECT BY DODAAC: F3C3CN
SERVICE ACCEPTOR : F3C3CN
“SHIP TO” DODAAC
PAY OFFICE DODAAC: F67100
E-MAIL POINT OF CONTACT LISTING:
SERVICE ACCEPTOR: 5ces.wawf@minot.af.mil
CONTRACT ADMINISTRATOR: athena.olmstead@minot.af.mil
CONTRACTING OFFICER: david.schwaiger@minot.af.mil
ADDITIONAL CONTACTS: 5cpts.wawf@minot.af.mil
CLAUSES INCORPORATED BY REFERENCE
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
DAVIS BACON ACT
Davis Bacon Act, General Decision No. ND100005, ND5, Modification Number 4, Publication Date 6/25/2010 and is hereof made a part of the contract. (Attachment 3)
TOBACCO USE IN THE AIR FORCE
(MI 40-102 - 1 AUG 1998)
The Air Force prohibits smoking and use of smokeless tobacco in or around the construction site at all times.
REQUIRED INSURANCE IAW FAR 28.306(b) Reference FAR clause entitled “Insurance ...” the contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence, shall be required on the comprehensive form of the policy.
Automobile Liability Insurance. This insurance shall be required on the comprehensive form of the policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
EMPLOYEES RESTRICTIONS
The Government reserves the right, under this contract to restrict the employment of any employee, or prospective contractor employee, who is identified as a potential threat to the health, safety, or general well being of operations mission of the installation and its population. Contractor Management and employees must conduct themselves in a professional manner at all times, in the performance of their assigned duties and responsibilities.
TRAFFIC REGULATIONS
Contractor will abide by all traffic regulations outlined in the Air Force Regulation 31-206, for Minot AFB, as supplemented. Copies of these regulations and supplements are available for review at Base Pass and Registration, 15 Missile Avenue or Base Security Police Office, 330 Tanker Trail. Changes will be furnished to the contractor prior to enforcement.
BASE PASSES
The contractor will be required to comply with all security and safety clearances that are enforced at Minot AFB. All contractor's personnel requiring access to Minot AFB, ND will be required to obtain base vehicle passes. Details for obtaining vehicle passes will be provided at the pre-performance conference.
MANDATORY SEATBELT REQUIREMENT
The use of seatbelts by all vehicle operators and passengers is mandatory on Minot AFB, ND, to include the operation of vehicles on Minot AFB Missile Sites. The first offense carries a mandatory ten-day driving suspension. The second offense has a 30-day driving suspension. The third offense and subsequent offenses, the driving suspension period will be determined by the 5th Mission Support Group Commander.
CELL PHONE USAGE
The use of cellular telephones without the use of hands-free device while driving on Minot AFB is prohibited.
COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS
In performing work under this contract, the Contractor shall comply with all applicable federal, state, and local statutes, ordinances, laws and regulations.
SCHEDULE OF MATERIAL SUBMITTALS (IAW AFFARS 5336.9001)
AF Form 66, Schedule of Material Submittals, may be used by the contracting officer, civil engineer, and contractor to help material submittal requirements. The form is initially prepared by the civil engineer and submitted to the contracting officer with the purchase request. The contracting officer will include the form in the solicitation as an attachment. Upon award, the contracting officer, or designee, will provide copies to the contractor and the civil engineer at the pre-performance conference. AF Form 66 may also be used to track the submission of periodic usage data for estimated quantity line items when the contract contains estimated quantity line items.
PAYMENTS FOR MATERIALS DELIVERED TO WORK SITE
The government will not pay for materials delivered to the work site. Payment for progress is the normal method of payment on contracts.
LIQUIDATED DAMAGES
Reference Section I 52.211-12.
BID, PAYMENT, AND PERFORMANCE BONDS
(a) Bid Guarantee (Standard Form 24). The amount of the bid guarantee shall be 20% of the proposal price.
(b) Performance Bonds (Standard Form 25). The penal amount of performance bonds shall equal 100 percent of the contract price order price.
(c) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds shall equal 100 percent of the contract price.
HIRING OF ILLEGAL ALIENS
In accordance with the Air Combat Command Supplement to Air Force Instruction 31-101, it is prohibited to hire illegal aliens for work on this contract. Illegal aliens will not be permitted access to Minot AFB, ND. Violation of this policy will result in corrective action.
FEDERAL HOLIDAYS
The following Federal Legal Holidays are observed by this base:
| New Year's Day | 1 January | |
| Martin Luther King's Birthday | Third Monday in January | |
| President's Day | Third Monday in February | |
| Memorial Day | Last Monday in May | |
| Independence Day | 4 July | |
| Labor Day | First Monday in September | |
| Columbus Day | Second Monday in October | |
| Veterans Day | 11 November | |
| Thanksgiving Day | Fourth Thursday in November | |
| Christmas Day | 25 December |
NOTE: "Any of the above holidays falling on a Saturday will be observed the preceding Friday, holidays falling on a Sunday will be observed on the following Monday."
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions
JUL 2004
52.203-3 Gratuities
APR 1984
52.203-5 Covenant Against Contingent Fees
APR 1984
52.203-7 Anti-Kickback Procedures
JUL 1995
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
SEP 2007
52.204-4 Printed or Copied Double-Sided on Recycled Paper
AUG 2000
52.204-7 Central Contractor Registration
APR 2008
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.211-13 Time Extensions
SEP 2000
52.215-2 Audit and Records--Negotiation
MAR 2009
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns
JUL 2005
52.219-8 Utilization of Small Business Concerns
MAY 2004
52.219-28 Post-Award Small Business Program Rerepresentation
APR 2009
52.222-3 Convict Labor
JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation
JUL 2005
52.222-6 Davis Bacon Act
JUL 2005
52.222-7 Withholding of Funds
FEB 1988
52.222-8 Payrolls and Basic Records
FEB 1988
52.222-9 Apprentices and Trainees
JUL 2005
52.222-10 Compliance with Copeland Act Requirements
FEB 1988
52.222-11 Subcontracts (Labor Standards)
JUL 2005
52.222-12 Contract Termination-Debarment
FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14 Disputes Concerning Labor Standards
FEB 1988
52.222-15 Certification of Eligibility
FEB 1988
52.222-21 Prohibition Of Segregated Facilities
FEB 1999
52.222-26 Equal Opportunity
MAR 2007
52.222-27 Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SEP 2006
52.222-36 Affirmative Action For Workers With Disabilities
JUN 1998
52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, and Other Eligible Veterans
SEP 2006
52.222-50 Combating Trafficking in Persons
FEB 2009
52.223-3 Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-6 Drug-Free Workplace
MAY 2001
52.225-13 Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1 Authorization and Consent
DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.228-5 Insurance - Work On A Government Installation
JAN 1997
52.228-11 Pledges Of Assets
SEP 2009
52.228-15 Performance and Payment Bonds--Construction
NOV 2006
52.229-3 Federal, State And Local Taxes
APR 2003
52.232-5 Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-18 Availability Of Funds
APR 1984
52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I
APR 1984
52.232-27 Prompt Payment for Construction Contracts
OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1 Disputes
JUL 2002
52.233-3 Protest After Award
AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim
OCT 2004
52.236-2 Differing Site Conditions
APR 1984
52.236-5 Material and Workmanship
APR 1984
52.236-6 Superintendence by the Contractor
APR 1984
52.236-7 Permits and Responsibilities
NOV 1991
52.236-8 Other Contracts
APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas
APR 1984
52.236-11 Use and Possession Prior to Completion
APR 1984
52.236-12 Cleaning Up
APR 1984
52.236-13 Accident Prevention
NOV 1991
52.236-14 Availability and Use of Utility Services
APR 1984
52.236-15 Schedules for Construction Contracts
APR 1984
52.236-17 Layout of Work
APR 1984
52.236-21 Specifications and Drawings for Construction
FEB 1997
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I
APR 1984
52.236-26 Preconstruction Conference
FEB 1995
52.236-28 Preparation of Proposals--Construction
OCT 1997
52.242-13 Bankruptcy
JUL 1995
52.242-14 Suspension of Work
APR 1984
52.243-4 Changes
JUN 2007
52.244-6 Subcontracts for Commercial Items
APR 2010
52.246-21 Warranty of Construction
MAR 1994
52.249-2 Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (May 2004) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction)
APR 1984
52.253-1 Computer Generated Forms
JAN 1991
252.201-7000 Contracting Officer's Representative
DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
JAN 2009
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights
JAN 2009
252.204-7003 Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A
SEP 2007
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
DEC 2006
252.215-7000 Pricing Adjustments
DEC 1991
252.223-7001 Hazard Warning Labels
DEC 1991
252.223-7006 Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 1993
252.225-7012 Preference For Certain Domestic Commodities
DEC 2008
252.227-7033 Rights in Shop Drawings
APR 1966
252.232-7010 Levies on Contract Payments
DEC 2006
252.236-7000 Modification Proposals-Price Breakdown
DEC 1991
252.243-7001 Pricing Of Contract Modifications
DEC 1991
252.243-7002 Requests for Equitable Adjustment
MAR 1998
252.244-7000 Subcontracts for Commercial Items and Commercial Components (DoD Contracts)
AUG 2009
252.247-7023 Transportation of Supplies by Sea
MAY 2002
252.247-7024 Notification Of Transportation Of Supplies By Sea
MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (SEP 2007)
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
(b) The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system.
(End of clause)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $201.45 for the first day, and $166.35 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil http://www.acqnet.gov
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation (48 CFR 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| New WD ND 5.docx | DOCX document | |
| Amendment 0001.doc | DOC document | |
| 08-0145 Inst. Hangar Door Specs.pdf | ||
| ATTACHMENT 4 Responsibility Questionnaire.doc | DOC document | |
| Attachment 5 Technical Acceptance Criteria.doc | DOC document | |
| 08-0145 Inst. Hangar Door Drawings.pdf | ||
| Attachment 3 ND 5 25 June 2010.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .