2._Project_Drawings,_4_Jan_2019.pdf
PDF 4 MB Posted
- Attached to
- Replace Approach - Threshold- End Light Fixtures Federal contract opportunity
- Solicitation number
- FA448619RA014
About this file
2. Project Drawings, 4 Jan 2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Question_and_Answer_for_FA448619RA014.pdf | ||
| Solicitation_Amendment_FA448619RA0140003_(Signed).pdf | ||
| Attachment_6_-_Additional_Clarifications.pdf | ||
| Attachment_5_-Temporary_Displaced_Threshold.pdf | ||
| Questions_&_Answers_for_FA448619RA014.pdf | ||
| Attachment_4_-_Project_Drawings_-_Old_Approach_Lighting_System.pdf | ||
| Solicitation_Amendment_FA448619RA0140002_SF_30.pdf | ||
| Solicitation_Amendment_FA448619RA0140001_SF_30.pdf | ||
| 3._Submittal_Register.pdf | ||
| Exhibit_B_Past_Performance_Questionnaire_PPQ.pdf | ||
| 1._Specifications,_4_Jan_2019.pdf | ||
| Solicitation_-_FA448619RA014_F.pdf | ||
| Exhibit_A_Performance_relevancy_Questionnaire_PRQ.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X
X
XXXXXX
X
X
X
X
X
X
T-75009
T-856
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Situation Plan
X
X
X
X
X
X
X X
X
X X
X
X
X X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
T-620
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
XXX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Location Plan
North End
Project Location
South End
Project Location
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Demolition Plan -
Threshold, End and Approach Lights
Threshold, End, Approach lights to remove and dispose. All associated transformers shall be returned to the Government.
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Demolition Plan -
Approach Lights
Flashing System and Approach Lights to remove and return to the Government.
All associated transformers shall be returned to the Government. Approach
Lighting Towers and Masts shall not be returned to Government.
Transformer to replace in accordance with new Approach Flashing System.
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Demolition Plan -
Overruns Trench and Asphalt
Remove existing asphalt layer
Trench to install new underground concrete encased duct banks:
- 4 conduits - 4" each - Termination of duct bank with new manholes
- 2 conduits - 4" each - Termination of duct bank with new handholes
- 2 conduits - 4" each - Termination of duct bank with new handholes
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
New Work - Threshold, End and
Approach Lights
New inset LED Approach and Flashing Lights install locations.
Install 9 barretes with 5 approach lights and 1 flashing light each, placed at longitudinal intervals of 30 m with the innermost light located 30 m from threshold.
30 m
Install new inset LED Threshold/End Combined Lights and LED Wing Bar Lights at current location of threshold and wing bar lights.
Trench to install concrete encased duct banks as specified in specifications.
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
New Work - Flashing System and Approach Lights
New LED Elevated Flashing System and LED Approach Lights to install at current locations. New poles/masts/towers shall be installed at same location with same heights.
Transformer to replace in accordance with new Approach Flashing System.
Build concrete pad inside perimeter fence.
Note: Build concrete pad inside perimeter fence at all approach lights/transformer area on North End.
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Approach Lights Masts and
Poles
Approach Lights supporting structures.
FOR REFERENCE ONLY.
HMA, SURFACE COURSE
PRIME COAT
TYPE I PAVEMENT
EXISTING BASE
TYPE II PAVEMENT
HMA, SURFACE COURSE
EXISTING FOUNDATION. COMPACT TO 95% PROCTOR
AGGREGATE BASE
COMPACTED BASE
PRIME COAT
GEOTEXTILE MEMBRANE (MIN 200G/M2)
HMA, SURFACE COURSE
EXISTING FOUNDATION. COMPACT TO 100% PROCTOR
AT SURFACE OR BY LIFT (IF TAMPERED)
Repave with the same thickness as existing pavement.
EXISTING BASE
PRIME COAT
TACK COAT
(For estimate purposes, consider 12''.)
A) MILL AND OVERLAY ASPHALT PORTION OF
OVERRUN AREAS (NORTH AND SOUTH)
US Air Forces in Europe
LAJES FIELD, AZORES, PORTUGAL
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
3''
3''
3''
3'' 3''
6'' 3''
3''
AGGREGATE BASE
HMA, SURFACE COURSE
M i n i m u m
CONCRETE (2500 PSI)
Repave with the same thickness as existing pavement.
(For estimate purposes, consider 12''.)
B) TRENCH AND CONDUIT DETAIL
Place Standard Conduit Spacer (all conduits)2
PRIME COAT
TACK COAT
Pavement and Trench
Details
Project Number
N° Projecto
Project Title
Titulo do Projecto
Drawing Title
Titulo do Desenho
Drawing #
N° Desenho
Date / Data
Scale / Escala (Imperial / Metric)
Design by / Projectou
Facility #
N°Edificio
Drawn by / Desenhou
MQNA 17-1013 Airfield
Replace Approach/Threshold/End
Lighting Fixtures
Telmo Aguiar
Telmo Aguiar
N/A
4 January 2019
Project Pictures
FOR REFERENCE ONLY
Existing approach inset light to remove Existing approach lights with concrete pad Existing approach lights without concrete pad.
Existing approach lights towers
Existing approach and flashing light Existing approach lights tower
File details come from the government source that posted it.