2._Project_Drawings,_4_Jan_2019.pdf

PDF 4 MB Posted

Attached to
Replace Approach - Threshold- End Light Fixtures Federal contract opportunity
Solicitation number
FA448619RA014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

2. Project Drawings, 4 Jan 2019

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

XXXXXX

X

X

X

X

X

X

T-75009

T-856

US Air Forces in Europe

LAJES FIELD, AZORES, PORTUGAL

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Situation Plan

X

X

X

X

X

X

X X

X

X X

X

X

X X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

T-620

US Air Forces in Europe

LAJES FIELD, AZORES, PORTUGAL

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

X

X

X

X

X

X

X

X

X

X

XXXXXXXXXXX

X

X

X

X

X

X

X

X

X

X

XXX

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Location Plan

North End

Project Location

South End

Project Location

US Air Forces in Europe

LAJES FIELD, AZORES, PORTUGAL

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Demolition Plan -

Threshold, End and Approach Lights

Threshold, End, Approach lights to remove and dispose. All associated transformers shall be returned to the Government.

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Demolition Plan -

Approach Lights

Flashing System and Approach Lights to remove and return to the Government.

All associated transformers shall be returned to the Government. Approach

Lighting Towers and Masts shall not be returned to Government.

Transformer to replace in accordance with new Approach Flashing System.

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Demolition Plan -

Overruns Trench and Asphalt

Remove existing asphalt layer

Trench to install new underground concrete encased duct banks:

- 4 conduits - 4" each - Termination of duct bank with new manholes

- 2 conduits - 4" each - Termination of duct bank with new handholes

- 2 conduits - 4" each - Termination of duct bank with new handholes

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

New Work - Threshold, End and

Approach Lights

New inset LED Approach and Flashing Lights install locations.

Install 9 barretes with 5 approach lights and 1 flashing light each, placed at longitudinal intervals of 30 m with the innermost light located 30 m from threshold.

30 m

Install new inset LED Threshold/End Combined Lights and LED Wing Bar Lights at current location of threshold and wing bar lights.

Trench to install concrete encased duct banks as specified in specifications.

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

New Work - Flashing System and Approach Lights

New LED Elevated Flashing System and LED Approach Lights to install at current locations. New poles/masts/towers shall be installed at same location with same heights.

Transformer to replace in accordance with new Approach Flashing System.

Build concrete pad inside perimeter fence.

Note: Build concrete pad inside perimeter fence at all approach lights/transformer area on North End.

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Approach Lights Masts and

Poles

Approach Lights supporting structures.

FOR REFERENCE ONLY.

HMA, SURFACE COURSE

PRIME COAT

TYPE I PAVEMENT

EXISTING BASE

TYPE II PAVEMENT

HMA, SURFACE COURSE

EXISTING FOUNDATION. COMPACT TO 95% PROCTOR

AGGREGATE BASE

COMPACTED BASE

PRIME COAT

GEOTEXTILE MEMBRANE (MIN 200G/M2)

HMA, SURFACE COURSE

EXISTING FOUNDATION. COMPACT TO 100% PROCTOR

AT SURFACE OR BY LIFT (IF TAMPERED)

Repave with the same thickness as existing pavement.

EXISTING BASE

PRIME COAT

TACK COAT

(For estimate purposes, consider 12''.)

A) MILL AND OVERLAY ASPHALT PORTION OF

OVERRUN AREAS (NORTH AND SOUTH)

US Air Forces in Europe

LAJES FIELD, AZORES, PORTUGAL

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

3''

3''

3''

3'' 3''

6'' 3''

3''

AGGREGATE BASE

HMA, SURFACE COURSE

M i n i m u m

CONCRETE (2500 PSI)

Repave with the same thickness as existing pavement.

(For estimate purposes, consider 12''.)

B) TRENCH AND CONDUIT DETAIL

Place Standard Conduit Spacer (all conduits)2

PRIME COAT

TACK COAT

Pavement and Trench

Details

Project Number

N° Projecto

Project Title

Titulo do Projecto

Drawing Title

Titulo do Desenho

Drawing #

N° Desenho

Date / Data

Scale / Escala (Imperial / Metric)

Design by / Projectou

Facility #

N°Edificio

Drawn by / Desenhou

MQNA 17-1013 Airfield

Replace Approach/Threshold/End

Lighting Fixtures

Telmo Aguiar

Telmo Aguiar

N/A

4 January 2019

Project Pictures

FOR REFERENCE ONLY

Existing approach inset light to remove Existing approach lights with concrete pad Existing approach lights without concrete pad.

Existing approach lights towers

Existing approach and flashing light Existing approach lights tower

File details come from the government source that posted it.