Attachment_1_-_Specifications,_31_July_2018.pdf
PDF 592 KB Posted
- Attached to
- Install Anti-Vehicle Cable System
- Solicitation number
- FA448618R0020
About this file
1. Specifications, 31 July 2018
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
INSTALL ANTI-VEHICLE CABLE
SYSTEM
MQNA 18-1007
Portfolio Optimization Office, 65th Civil Engineer Squadron
Rev 4 31 July 2018
Rev 3 12 July 2018
Rev 2 09 July 2018 Rev 1 04 July 2018
31 May 2018
USAFE
Lajes Field, Azores, Portugal
65th Civil Engineer
Squadron APO AE 09720
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 03 - CONCRETE
DIVISION 31 - EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
01 15
LIST OF DRAWINGS
02/11
SUMMARY
section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
01 15 04 July
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
-- End of Document --
DRAWING NO. TITLE
C-001 COVER SHEET
C-002 GENERAL NOTES AND DETAILS
C-100 OVERALL SITE PLAN-BARRIER LOCATIONS
C-100.1 OVERALL SITE PLAN-BARRIER LOCATIONS
C-101 PARTIAL SITE PLAN: AREA A (PHASE 1)
C-102 PARTIAL SITE PLAN: AREA A (PHASE 1)
C-103 PARTIAL SITE PLAN: AREA A (PHASE 1)
C-104 PARTIAL SITE PLAN: AREA A (PHASE 1)
C-131 PARTIAL SITE PLAN: AREA D (PHASE 1)
C-132 PARTIAL SITE PLAN: AREA D (PHASE 1)
C-152 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-153 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-154 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-155 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-156 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-157 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-158 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-160 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-161 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-162 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-163 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-164 PARTIAL SITE PLAN: AREA F (PHASE 1)
C-171 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-172 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-173 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-174 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-175 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-176 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-177 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-178 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-179 PARTIAL SITE PLAN: AREA G (PHASE 1)
C-181 PARTIAL SITE PLAN: AREA H (PHASE 1)
C-182 PARTIAL SITE PLAN: AREA H (PHASE 1)
C-003 REINFORCED CURB DETAIL
08/08
04 July ontracting Flight
Group contract
Emergency:
Urgent:
Routine:
Emergency:
Urgent:
Routine:
NM
08/11
1 foot exposed reinforced concrete curb s are are
, or equivalent he crash arm is to be mounted to jersey barriers provided by the government and located by the northern access gate as shown in the plans.
Concrete filled bollards are provided in short segments requiring protection where cable barrier would otherwise be more costly to install.
All construction work is divided into two phases. Phase I construction includes work that is outside of the critical airfield operations complying with IAW USAFEI 32-1007, Table 3.6, Air Space Imaginary Surfaces. Phase II construction includes work that is in close proximity to the airfield operations requiring a waiver to the requirements in IAW USAFEI 32-1007, Table 3.6, Air Space Imaginary Surfaces. Each phase will be priced and constructed separately.
tracting Officer for phase 1 and 180 days for phase 2, including material acquisition, after issue of the "Notice to Proceed"
11/11 a A
11/09
Progress
05/11
(these shall be included in the "Safety Plan" Submittal)
(Please check the Schedule of Material Submittals)
Contractor shall p its own
11/11
; G (Include in "Safety Plan" submittal
; G (Include in "Progress Schedule" submittal)
; G
List of Contractor ; G
02/12
Note: To be included in the "Safety Plan" Submittal.
(Included in the "Safety
Plan" Submittal)
08/10
02/10
(To be included in the "List of Contractor Personnel" Submittal)
, provided by the U.S. Army Corps of Engineers, digital file
04/08
03/13
ENVIRONMENTAL PROTECTION PLAN
08/11
5 days before (Shall be included in the "Final DD Form 1354" Submittal). when (Shall be included in the "As Built Drawings" Submittal)
02/11
PROPOSALS
proposals
Installation Drawings of Foundations that contain steel reinforcement; G rawings
; G ; G
Barrier Installation; G
; G Z ; G
; G
; G ; G
Crash Arm Cable Barrier
File details come from the government source that posted it.