Questions submitted by Vendors.docx
DOCX document 13 KB Posted
- Attached to
- JB MDL Baggage Conveyor Federal contract opportunity
- Solicitation number
- FA4484-20-Q-4999
About this file
This document contains a federal contract opportunity solicitation for a baggage conveyor system project at Joint Base McGuire-Dix-Lakehurst in New Jersey. The solicitation requests quotations to complete the installation of an inbound and outbound baggage handling conveyor system in accordance with the attached statement of work and appendices by March 20, 2020. Offerors must provide all required documentation and fill out an attached pricing matrix. A pre-proposal site visit is scheduled for March 4, 2020, with all inquiries regarding the site visit due by March 3. Questions about the solicitation are due by March 6, with responses provided to all contractors by March 16. Proposals must include a 120-day acceptance period and address any assumptions and exceptions. The selected contractor will be responsible for performance tests and operator training upon completion of the conveyor system installation project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions submitted by Vendors.docx | DOCX document | |
| Pricing Matrix.xlsx | XLSX spreadsheet | |
| Combined Synopsis and Solicitation.doc | DOC document | |
| APP A - INBOUND BAGGAGE CONVEYOR.docx | DOCX document | |
| APP B - OUTBOUND BAGGAGE CONVEYOR 2019-09-10.docx | DOCX document | |
| BMC3F8-01-01.pdf | ||
| SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions submitted by Vendors
1. The current location of the existing MCP is no longer up to NEC code. Would the Air Force be willing to relocate the power to the where the new MCP would be placed according to code?
We are good with the specifications as written. The reference refers to having three feet in front of electrical panels. The design has the required three feet.
2. Could you please provide the dimensions of the conveyors? Including conveyor lengths and elevations.
The elevations are provided in the Appendixes, but the overall length of the conveyors is not and the drawings are not dimensioned. The AutoCAD drawings are to scale, so they can get the overall length from the AutoCAD drawings. I did a quick measurement of the drawings.
Outbound Conveyor Scale/Feeder Conveyors – 8 feet Take Away Conveyor – 140 feet
Inbound Conveyor – 220 feet