Attachment 7 - Past Performance Questionnaire

View the file

Other files

File Type Posted
0450R011.TIF TIF image
0450R010.TIF TIF image
0450R014.TIF TIF image
0450R015.TIF TIF image
0450R019.TIF TIF image
0450R016.TIF TIF image
0450R013.TIF TIF image
0450R018.TIF TIF image
NKAK_08-1047_-_Site_Visit_Rosters.pdf PDF
FA4460-15-R-0021-U0001.doc DOC document
AS_BUILT_DWGs.dwg DWG drawing
11_11-BLDG_350 _450_AS-BUILTS_-_SHEET_11_OF_43.pdf PDF
Attachment_11_-_Client_Authorization_Letter.docx DOCX document
Attachment_5_-_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
Attachment_3_-_Environmental_MOA.doc DOC document
Attachment_8_-_Financial_Institution_Reference_Sheet.docx DOCX document
Attachment_9_-_EMIS_Instruction_Guide.doc DOC document
Att_1_-_Specifications_7_Aug_15.docx DOCX document
FA4460-15-R-0021_FINAL.pdf PDF
Attachment_6_-_LRAFB_Information.docx DOCX document
Attachment_4_-_C D_Report.doc DOC document
Attachment_10_-_Wage_Determination_AR150132.docx DOCX document
Attachment_2_-_NKAK_08-1047_Drawings.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR (Contractor please add reference information)

FROM: 19 CONS/LGCA

642 THOMAS AVENUE
LITTLE ROCK ARB AR 72099-4971

SUBJECT: Request for Past Performance Questionnaire Information for FA4460-11-R-0021, Sustain/Repair Base Supply Roof B-450

1. Your have been identified as a reference point of contact for past and/or present performance evaluation of the firm listed on the attached questionnaire form. This firm is currently interested in providing a proposal for the above reference project.

2. Please complete the attached survey questionnaire. You should e-mail the survey back to Samuel Hevrin at samuel.hevrin@us.af.mil. Also send a courtesy copy to Barry G. Jundt at barry.jundt@us.af.mil. You may fax the questionnaire to (501) 987-8119. If you have any questions, please contact SrA Samuel Hevrin at (501) 987-3448 or Barry G. Jundt at (501) 987-3853. Your information MUST be submitted by 26 Aug 2015 @ 2:00PM LOCAL (CST). Your expedient attention regarding this matter is greatly appreciated. Thank you in advance.

JESSE L. CHRISTY
Contracting Officer

1. Atch Past and Present Performance Questionnaire

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name: ____________________ Telephone Number: ____________________ Address: __________________________ Fax Number: _________________________ __________________________ Point of Contact: ______________________

__________________________
__________________________

Project Title and Brief Description of Work: _____________________________________*

Contract Number Provided by Offeror: ___________________ Dollar Amount: ________*

Contract Period or Dates of Performance Provided by Offeror: ______________________* Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.

* Note: If offeror holds or has held other contracts with your agency/organization in the last 3 years, please complete separate evaluation forms for those contracts as well.

B. RESPONDENT INFORMATION:

Name of Respondent: _____________________ Title: ____________________________

Address: _____________________Telephone Number: ___________________ _____________________________Fax Number:_____________________
_____________________________Email Address: _____________________

C. FAX COMPLETED SURVEY FORM TO: __________________________________

D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (SUBC, SATC, LC, NC, and UC) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF LC or NC.

E
G
S
M
U
N
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral

Performance meets/met contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets/met contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.
Performance meets/met contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Performance does not meet/did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
Performance does not meet/did not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

Note: Include this information on each page of the questionnaire form to ensure there is no mix up in information among contracts surveyed for respective primes/subs, etc.

Place an “X” in the appropriate column using the definitions matrix above.

The contractor:
SUBC
SATC
LC
NC
UC
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
4.
Home office participated in solving significant local problems.
5.
Followed approved quality control plan.
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
8.
Provided timely resolution of contract discrepancies.
9.
Identified problems as they occurred.
10.
Suggested alternative approaches to problems.
11.
Displayed initiative to solve problems.
12.
Developed realistic progress schedules.
13.
Met established project schedules.
14.
Provided timely resolution of warranty defects.
15.
Was responsive to contract changes.
16.
Provided adequate project supervision.
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
18.
Paid subcontractors/suppliers in a timely manner.
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
20.
Cooperated with Government personnel after award.
21.
How would you rate the contractor's overall performance?
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

Yes No

23.
Would you award another contract to this contractor? If not, explain in “remarks.”
Yes
No
24.
Is the contractor rated in CPARS?
Yes
No

CONTRACTOR’S NAME: ___________________ CONTRACT NUMBER __________

Remarks:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

File details come from the government source that posted it. Updated .