Attachment_5_-_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Sus/Repair Base Supply Roof B-450
- Solicitation number
- FA4460-15-R-0021
About this file
Attachment 5 - Schedule of Material Submittals
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0450R011.TIF | TIF image | |
| 0450R010.TIF | TIF image | |
| 0450R014.TIF | TIF image | |
| 0450R015.TIF | TIF image | |
| 0450R019.TIF | TIF image | |
| 0450R016.TIF | TIF image | |
| 0450R013.TIF | TIF image | |
| 0450R018.TIF | TIF image | |
| NKAK_08-1047_-_Site_Visit_Rosters.pdf | ||
| FA4460-15-R-0021-U0001.doc | DOC document | |
| AS_BUILT_DWGs.dwg | DWG drawing | |
| 11_11-BLDG_350 _450_AS-BUILTS_-_SHEET_11_OF_43.pdf | ||
| Attachment_11_-_Client_Authorization_Letter.docx | DOCX document | |
| Attachment_3_-_Environmental_MOA.doc | DOC document | |
| Attachment_8_-_Financial_Institution_Reference_Sheet.docx | DOCX document | |
| Attachment_9_-_EMIS_Instruction_Guide.doc | DOC document | |
| Att_1_-_Specifications_7_Aug_15.docx | DOCX document | |
| FA4460-15-R-0021_FINAL.pdf | ||
| Attachment_6_-_LRAFB_Information.docx | DOCX document | |
| Attachment_4_-_C D_Report.doc | DOC document | |
| Attachment_10_-_Wage_Determination_AR150132.docx | DOCX document | |
| Attachment_7_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_2_-_NKAK_08-1047_Drawings.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS NKAK 08-1047 Sustain/Repair Base Supply Roof, B-450
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | 01 14 19 Coordenation 1.12 Radioactive Material | X | X | X | ||
| 2 | 01 45 00 Quality Control 1.04 Cultural Resource Management | X | ||||
| 3 | 01 45 00 1.05 Temporary Erosion Control Measures | X | X | X | ||
| 4 | Densdeck | X | X | |||
| 5 | Asphalt | X | X | |||
| 6 | sealants | X | X | |||
| 7 | fasteners | X | X | |||
| 8 | insulation | X | X | |||
| 9 | base sheet | x | x | |||
| 10 | intermediate plys | x | x | |||
| 11 | cap sheet | x | x | |||
| 12 | surface coating | x | x |
Schedule of Material Submittals Template, Feb 2010 (SAF/AQCP)