Amendment 02
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Acquisition of Base Engineer Requirements (SABER) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2S3CZ9040A002 NKAK 06-1074
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Replace Attachment 10 dated 1 July 09 w ith Attachment 10 dated 14 June 10
2. Incorporate 69 as-built draw ings f iles in .dw g and .mdi formats
3. Add an additional site visit for 29 Jun 10 at 10:00 a.m. See Summary of Changes
4. Incorporate updated w age decisions AR080153 21 May 10, AR080170 4 Jun 10, and AR080175 4 Jun 10
See Summary of Changes for additional changes. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jun-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4460-10-R-0004
X 9B. DATED (SEE ITEM 11)
17-May-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jun-2010
CODE
19TH CONTRACTING SQUADRON - FA4460
642 THOMAS AVE
LITTLE ROCK AFB AR 72099
FA4460 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4460-10-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-Jun-2010 02:00 PM to 14-Jul-
2010 02:00 PM.
The contractor period of performance end date has decreased by 61 days from 365 days to 304 days.
The required performance has changed from:
PROJECT MAGNITUDE IS BETWEEN $10,000,000 AND $25,000,000
MINIMUM GUARANTEE FOR THIS CONTRACT IS $25,000
MAXIMUM CONTRACT AMOUNT FOR THE BASIC CONTRACT PERIOD AND EACH
OPTION PERIOD EXERCISED SHALL NOT EXCEED AN AGGREGATE OF $25,000,000
PERFORMANCE PERIOD(S)
BASE YEAR 01 Aug 2010-31 Jul 2011
OPTION YEAR 1 01 Aug 2011-31 Jul 2012
OPTION YEAR 2 01 Aug 2012-31 Jul 2013
OPTION YEAR 3 01 Aug 2013-31 Jul 2014
OPTION YEAR 4 01 Aug 2014-31 Jul 2015
THIS ACQUISITION IS FOR A FIXED PRICE INDEFINITE DELIVERY-INDEINITE
QUANTITY TYPE CONTRACT
THIS ACQUISITION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE
UNDER THE WAIVER TO THE SMALL BUSINESS COMPETITIVENESS
DEMONSTRATION PROGRAM
TO:
PROJECT MAGNITUDE IS BETWEEN $10,000,000 AND $25,000,000
MINIMUM GUARANTEE FOR THIS CONTRACT IS $25,000
MAXIMUM CONTRACT AMOUNT FOR THE BASIC CONTRACT PERIOD AND EACH
OPTION PERIOD EXERCISED SHALL NOT EXCEED AN AGGREGATE OF $25,000,000
PERFORMANCE PERIOD(S)
BASE YEAR 30 Sep 2010 or Date of Award-31 Jul 2011
OPTION YEAR 1 01 Aug 2011-31 Jul 2012
OPTION YEAR 2 01 Aug 2012-31 Jul 2013
OPTION YEAR 3 01Aug 2013-31 Jul 2014
OPTION YEAR 4 01 Aug 2014-31 Jul 2015
THIS ACQUISITION IS FOR A FIXED PRICE INDEFINITE DELIVERY-INDEINITE
QUANTITY TYPE CONTRACT
THIS ACQUISITION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE
UNDER THE WAIVER TO THE SMALL BUSINESS COMPETITIVENESS
DEMONSTRATION PROGRAM.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 01-AUG-2010 TO
31-JUL-2011
N/A 19 CIVIL ENGINEERING - F2S3CZ
RONNIE SMITH
536 THOMAS AVENUE RM 602
LITTLE ROCK AFB AR 72099
501/987-3440
FOB: Destination
F2S3CZ
To:
POP 30-SEP-2010 TO
N/A 19 CIVIL ENGINEERING - F2S3CZ
RONNIE SMITH
536 THOMAS AVENUE RM 602
LITTLE ROCK AFB AR 72099
501/987-3440
F2S3CZ
The following Delivery Schedule item for SUBCLIN 000101 has been changed from:
N/A N/A
The following Delivery Schedule item for SUBCLIN 000102 has been changed from:
The following Delivery Schedule item for SUBCLIN 000103 has been changed from:
The following Delivery Schedule item for SUBCLIN 000104 has been changed from:
The following Delivery Schedule item for SUBCLIN 000105 has been changed from:
The following Delivery Schedule item for SUBCLIN 000106 has been changed from:
The following Delivery Schedule item for SUBCLIN 000107 has been changed from:
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Table of Contents has been deleted
The following have been added by full text:
LIST OF ATTACHMENTS
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 General Wage Decision AR080153 4 21-May-10
Attachment 2 General Wage Decision AR080170 5 4-Jun-10
Attachment 3 General Wage Decision AR080175 5 4-Jun-10
Attachment 4 EMIS Contractor Instruction Guide 3 N/A
Attachment 5 Memorandum of Agreement between Little Rock Air Force Base (Little
Rock AFB) and Arkansas Department of
Pollution Control and Ecology (ADPC&E) or its successors relating to the Compliance of contractors performing work at Little Rock
AFB with Environmental Laws and
Regulations and Addendum to the MOA dated
(05/04/99)
3 31-Dec-98
Attachment 6 Schedule of Material Submittals 2 N/A
Attachment 7 Contractor Construction and Demolition
(C&D) Report 1 N/A
Attachment 8 Sample Construction Company
Daily Report 2 N/A
Attachment 9 Sample Summary of Work 3 N/A
Attachment 10 Initial Summary of Work Seed Project
NKAK 09-1115 20 14-Jun-10
Attachment 11 Schedule of Material Submittals Seed Project 1 N/A
Attachment 12 Past Performance Questionnaire with
Cover Letter 6 N/A
Attachment 13 Subcontractor/Teaming Partner Consent Form 1 N/A
Specifications Simplified Acquisition of Base Engineer
Requirements (SABER), NKAK 06-1074 180 27-Apr-10
Drawings As-Built Drawings 69 N/A
The following have been deleted:
TABLE OF CONTENTS
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
27 May 2010 2:00 p.m. local
29 Jun 2010 10:00 a.m. local
(c) Participants will meet at—
TH
CONTRACTING SQUADRON
642 THOMAS AVENUE
LITTLE ROCK AFB AR 72099-4971
Compact Discs (CDs) containing the SABER Basic specification with access to all folder links and hyperlinks as in the specification will be provided at the site visit. If you do not attend the site visit, you may request the CD to be mailed to you via regular mail (US Postal Service). The Government is not responsible for CDs lost in transit by the
US Postal Service. If you want any type of express delivery service (i.e. FedEx, DHL, etc), you must provide a prepaid envelope to this office. The Government is not responsible for CDs lost by express delivery services.
(End of provision)
ADDITIONAL SITE VISIT INSTRUCTIONS:
The site visit will commence at the time specified. It is necessary to arrive ten minutes early to sign in. All individuals attending the site visit will be required to provide the following information either by email or fax 3
(three) calendar days prior to each site visit. Information required is Full Name, date of birth, driver’s license number, and state of driver license. Email the information to lisa.smith1@littlerock.af.mil or betty.rosewaren@littlerock.af.mil. In addition, at the entry control point, in order to gain access to the installation, each individual must provide a valid driver’s license, vehicle registration, and vehicle insurance card to obtain a visitor pass. Failure to provide this information will prevent entry into the installation. SOME DELAYS SHOULD
BE ANTICIPATED. Individuals should allow sufficient time to obtain a visitor pass. Individuals not providing the required information 3 (three) calendar days in advance of the site visit will not be granted access to attend the site visit. Those individuals who have access to the installation and will not require a visitors pass may attend the site visit without an RSVP. Each individual name must be provided. Failure to RSVP for those who do not have base access will prevent site visit attendance. NO EXCEPTIONS WILL BE MADE.
(End of Summary of Changes)