Attach 1 General Wage Decision Revised.pdf

PDF 159 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) Federal contract opportunity
Solicitation number
FA4460-10-R-0004
Issued by
Department of the Air Force Air Mobility Command

About this file

Revised Wage Decision

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineer Requirements (SABER), newest first.
File Type Posted
DET02.dwg DWG drawing
Other Information.doc DOC document
As-Built Drawings.pdf PDF
Amendment 02.pdf PDF
HVAC 79.mdi MDI file
8924-A201_as_built.dwg DWG drawing
WIMS_SIMS DETAILS_SCHEDULES.mdi MDI file
8924-A401_as_built.dwg DWG drawing
HVAC.mdi MDI file
SPECIFICATIONS 77.mdi MDI file
FLOOR PLAN 55.mdi MDI file
8926-M301_as_built.dwg DWG drawing
POWER PLOT PLAN 56.mdi MDI file
ELECTRICAL PLAN 76.mdi MDI file
8929-E1-536_as_built.dwg DWG drawing
ELEVATIONS 55.mdi MDI file
MECHANICAL PLAN 76.mdi MDI file
FOUNDATION PLAN 55.mdi MDI file
Bldg 536 HVAC Report.pdf PDF
FLOOR PLAN.mdi MDI file
PLUMBING_AC FLOOR PLAN 82.mdi MDI file
ACND DUCT 81.mdi MDI file
FLOODLIGHTS 56.mdi MDI file
Attach 3 General Wage Decision Revised.pdf PDF
WIMS FLOOR PLAN_DETAILS.mdi MDI file
DEMOLITION PLAN2 76.mdi MDI file
VICINITY MAP2 76.mdi MDI file
FLOOR PLAN_FINISH SCHEDULE_DETAILS 76.mdi MDI file
RADIO DISPATCH CONSOLE 72.mdi MDI file
FIRD DETAILS.mdi MDI file
HVAC DEMOLITION PLAN.mdi MDI file
VICINITY MAP 83.mdi MDI file
CANOPY 74.mdi MDI file
WALL SECTIONS_DETAILS 55.mdi MDI file
DETAILS 77.mdi MDI file
8926-M202_as_built.dwg DWG drawing
VICINITY MAP.mdi MDI file
MECHANICAL 56.mdi MDI file
FA4460-10-R-0004-0001.pdf PDF
Questions Information 27 May 2010.pdf PDF
Question and Answer 21 May 2010.pdf PDF
Attach 7 Debris Report.pdf PDF
Attach 10 INITIAL SOW B536 NKAK 01-1115 Seed Project.pdf PDF
Attach 12 Past Performance Questionnaire.pdf PDF
Attach 2 Wage Decision.pdf PDF
Attach 8 SABER Daily Report.pdf PDF
Attach 5 Environmental MOA.pdf PDF
Attach 3 Wage Decision.pdf PDF
Solicitation FA446010R0004.pdf PDF
Attach 9 SAMPLE Summary of Work.pdf PDF
Show all 50

Simplified Acquisition of Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: FA4460-10-R-0004

Attachment 1

General Decision Number: AR100153 05/21/2010 AR153

Superseded General Decision Number: AR20080153

State: Arkansas

Construction Type: Building

Building Construction

County: White County in Arkansas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 05/21/2010

BOIL0069-001 01/01/2009

Rates Fringes

BOILERMAKER......................$ 27.63 13.96

ELEC0295-003 12/01/2009

ELECTRICIAN

Electrical contracts over

$1,500,000..................$ 24.41 8.81+5%

Electrical contracts under

$1,500,000..................$ 22.84 8.81+5%

IRON0321-008 08/01/2009

IRONWORKER, STRUCTURAL...........$ 18.10 12.34

* PLUM0155-008 09/22/2009

PIPEFITTER.......................$ 23.51 7.75

ROOF0020-018 01/01/2008

ROOFER...........................$ 14.50 .20

SFAR0669-001 01/01/2010

SPRINKLER FITTER (Fire

Sprinklers)......................$ 23.70 14.35

SUAR2008-107 11/20/2008

BRICKLAYER.......................$ 16.00 0.74

CARPENTER, Including

Acoustical Ceiling

Installation, Drywall Hanging and Form Work....................$ 14.67 0.00

CEMENT MASON/CONCRETE FINISHER...$ 13.47 2.53

IRONWORKER, REINFORCING..........$ 20.46 4.53

LABORER: Common or General......$ 9.37 0.29

LABORER: Mason Tender - Brick...$ 9.25 0.00

OPERATOR: Backhoe/Excavator.....$ 12.50 1.97

OPERATOR: Bulldozer.............$ 11.08 0.00

OPERATOR: Crane.................$ 15.00 0.00

PAINTER: Brush, Roller and

Spray............................$ 12.43 0.00

PLUMBER..........................$ 16.14 0.00

TRUCK DRIVER: Dump Truck........$ 11.00 0.00

TRUCK DRIVER: Flatbed Truck.....$ 12.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage

Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the

Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .