C-32_QASP.pdf

PDF 313 KB Posted

Attached to
C-32 Pilot Training Federal contract opportunity
Solicitation number
FA4452-13-R-0001
Issued by
Department of the Air Force Air Mobility Command

About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to C-32 Pilot Training, newest first.
File Type Posted
Questions_and_Answers.docx DOCX document
FA4452-13-R-0001_Amd_0001.pdf PDF
FA4452-13-R-0001-0001_(conformed).pdf PDF
CDRLS_A001-A004.pdf PDF
CDRLS_A005-A008.pdf PDF
FA4452-13-R-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

TABLE OF CONTENTS:

1.0 Mission

2.0 Purpose

3.0 Authority

4.0 Roles and Responsibilities

5.0 Contractor’s Quality Control Plan (QCP)

6.0 Performance Requirements and Method(s) of Surveillance

7.0 Surveillance Documentation

8.0 Acceptance of Services

9.0 Contract Management

Appendices:

1. Services Summary (SS) and Method of Surveillance

2. Corrective Action Report (CAR)

3. AMC Student Course Critique

4. Performance Assessment Report (PAR)

1.0 Mission

In order to maintain a high state of mission readiness, AMC/A3T seeks to provide high quality training for Pilots. Specifically, this requirement shall ensure Flight Crews for the C-32A are provided professional aircraft simulator training which will encompass normal and emergency procedures for initial and refresher training that includes aircraft simulator training.

2.0 Purpose

This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this surveillance/inspection process will be conducted to ensure successful PWS performance. It provides a systematic method for a continuous oversight process to determine conformity with the technical requirements of the contract. The QASP answers the following questions:

What will be monitored?

How monitoring will take place?

Who will conduct monitoring?

How monitoring efforts and results will be documented?

The contractor is responsible for implementing and delivering performance that meets contract objectives using its Quality Control Plan (QCP). The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract requirements. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance. The Contracting Officer (CO) shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract and determines the final assessment of contractor performance.

The QASP is not part of the contract nor is it intended to duplicate the contractor’s QCP. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.

The QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

3.0 Authority

Authority for issuance of this QASP is provided under Part 37.604 and 46.4 of the Federal Acquisition Regulation (FAR), Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the Contracting Officer (CO) or a duly authorized representative.

4.0 Roles and Responsibilities

The following personnel comprise the Multi-Functional Team (MFT) and shall oversee and coordinate surveillance activities.

Government Representatives:

Contracting Officer Representative (COR) Supervisor – The COR Supervisor nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s surveillance activities.

Assigned COR Supervisor: TBD Organization or Agency: TBD Telephone: TBD Email: TBD

Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.

Specific duties of the CO include:

Delegating authority for inspection and/or acceptance to the COR in accordance with the terms and conditions of the contract.

Informing the contractor of the names, duties, and limitations of authority for all COR assigned to the contract.

Periodically assessing the COR’s performance.

Managing contractor performance surveillance data, including submitting Contractor

Performance Assessment Reporting System (CPARS) reports.

Ensuring the MFT reviews this QASP annually (at a minimum) for recommended changes.

Providing contract-specific training (to include refresher training) administered by CO or

CO’s designee to all appointed CORs.

Assigned CO: TBD Organization or Agency: TBD Telephone: TBD Email: TBD

Contracting Officer’s Representative (COR) - The COR is responsible for providing continuous program and technical oversight of the contractor’s performance. While the COR may serve as a direct conduit to provide Government guidance and feedback to the contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf. The COR is responsible for reporting early identification of performance problems to the CO and may use the applicable appendix items for documenting contractor performance.

Specific duties of the COR include:

Evaluating and documenting the contractor’s performance in accordance with the procedures set forth in the QASP.

Recommending any changes necessary to the contract, PWS, QASP, or other items to provide more effective operations or eliminate unnecessary costs.

Keeping a COR file that accurately documents the contractor’s actual performance (i.e.

COR surveillance reports).

Utilizing COR file data (i.e. performance and COR surveillance reports) to assist the CO in the preparation of the CPARS reports.

Receiving required training before performing any COR duties (IAW MP5301.602-2(d)).

Notifying the CO immediately regarding contractor non-compliance with FAR 52.222-

50, “Combating Trafficking in Persons.”

Assigned COR: TBD Organization or Agency: TBD Telephone: TBD Email: TBD

Alternate COR: TBD Organization or Agency: TBD Telephone: TBD Email: TBD

Quality Assurance Program Coordinator (QAPC) - The QAPC is responsible for developing, managing, and implementing the Quality Assurance Program. The QAPC may also provide refresher training, as needed.

Assigned QAPC: Mr. Michael Hoh Organization or Agency: AMC/A7KQE Telephone: (618) 256-4393 Email: michael.hoh.1@us.af.mil

Contractor Representatives:

Contractor – Complies fully with the terms and conditions of the contract and ensures non-conforming contract services are identified and corrected.

Specific duties of the Contractor include:

Participating as a member of the MFT in the post-award management phase.

Maintaining and implementing their commercial quality procedures that ensure contract requirements are met.

Ensuring that the QCP is revised when necessary to prevent recurrence of non-conforming contract services.

Tendering to the government for acceptance, only those services that conform to contract requirements.

Recommending any changes to the contract that will provide more effective operations or eliminate unnecessary costs.

Contract Manager: TBD Telephone: TBD Email: TBD

Other Contract Personnel: TBD Title: TBD Telephone: TBD Email: TBD

5.0 Contractor’s Quality Control Plan (QCP)

As required by the contract, the contractor’s commercial QCP included in the final proposal dated ___________________, is incorporated by reference.

6.0 Performance Requirements and Method(s) of Surveillance

6.1 Contract Surveillance

The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the CO and the contractor, which enables positive, open and timely communications. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the Government, is responsible for management and quality control/quality assurance actions to successfully meet the terms of the contract.

6.2 Surveillance Summary

The Services Summary (SS) and Method of Surveillance (Appendix 1) is the list of performance objectives and thresholds that must be performed by the contractor. This summary details the method(s) of surveillance the COR will use to validate and inspect these performance objectives.

Inspection of each objective will be documented in the COR file.

Performance objectives define the desired outcomes. Performance thresholds define the level of service required under the contract to successfully meet the performance objective. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance thresholds. The PWS and QASP should be used to form the foundation of the COR’s inspection.

6.3 Method(s) of Surveillance:

Course Critiques and Periodic Surveillance will be the standard contract performance review and analysis processes used in evaluating the contractor’s performance. Definition of surveillance methods:

AMC OSA/EA Student Course Critiques. Upon completion of training, the contractor shall provide each student with a copy of AMC OSA/EA, Student Course Critique. Each student shall complete the form and return it to the contractor. The form queries the students with regard to quality of training materials, instruction, facilities and overall satisfaction with the course.

Periodic Surveillance: Services are inspected using periodic surveillance (daily, weekly, monthly, quarterly, etc.) as determined by the COR. The results of the periodic surveillance inspections may be used as the basis for actions (other than payment deductions) toward the contractor. In such cases the Inspection of Services clause becomes the basis for the CO’s actions. The COR will submit a schedule to the CO the month prior to the month being inspected. Schedule will show time, date, location, and item(s) that will be inspected. Any changes to the schedule will be submitted to the CO when the change occurs.

7.0 Surveillance Documentation

7.1 Corrective Action Report (CAR) (Appendix 2)

Corrective Action reporting is divided into two categories, which are as follows: minor and major.

Minor: A minor discrepancy is a departure from established standards having little bearing on the service provided. Some examples would be data deliverables with minor grammatical or spelling errors or insufficient copies of documents. When the COR identifies a minor discrepancy, the COR shall document the discrepancy and verbally contact the designated contractor representatives, but is not required to notify the CO; however, if the same minor discrepancy is identified more than once, it may be an indication that a major discrepancy is occurring or has occurred because the contractor has not taken proper steps to prevent recurrence. In this case, the COR shall notify the CO in writing.

Major: If at any time the COR identifies a condition as having a significant adverse effect on the quality of the service, such as those stated below, the COR shall document their findings and notify the CO immediately in writing. Major discrepancies will be reported by the COR to the designated contractor representative in writing; however, copies of written correspondence will be coordinated with the CO prior to issuance to the contactor representative. Some examples would contractor failure to meet a performance objective, failure to provide adequate corrective action to preclude recurrence of government-identified findings, failure to provide corrective action to deficiencies identified by the COR within a prescribed suspense period or failure to adhere to security regulations that results in a security incident.

7.2 AMC OSA/EA, Student Course Critique (Appendix 3)

The results of the student course critiques will determine the government’s next course of action.

For example, if more than one valid student complaint concerning quality of instruction is received during a training session quarter, the COR needs to document that finding. The COR shall receive, document, and validate or invalidate all complaints. If the complaint is invalid, the COR shall contact the complainant and explain why the complaint was invalid. If the complaint is valid, the COR needs to document this finding as well, and begin corrective action.

7.3 Performance Assessment Report (PAR) (Appendix 4)

All evaluations will be at the Task Order level. PARs will be used to report all minor discrepancies and will be generated by the COR and sent to the contractor for corrective action.

Contractors will be given 30 days to correct PARs unless they have requested an extension. If five minor discrepancies are found, combine them and process a CAR.

8.0 Acceptance of Services

Before acceptance of product(s) or service(s) and/or approval of an invoice, the COR shall prepare a COR Services Summary Surveillance Report (Appendix 5) in accordance with the QASP and FAR 52.212-4 (Contract Terms and Conditions – Commercial Items), Inspection and Acceptance Clause. The report shall identify both positive and negative performance. At a minimum, the report shall identify the number of assessments scheduled and conducted, the number of unacceptable/acceptable performances observed, the number of CARs issued, number of valid complaints, any significant contractor performance discrepancies, and a rating of the Contractor’s overall performance. The report shall be signed and dated by the COR and uploaded to the CORT Tool.

The COR will certify that acceptable services were received, in accordance with the terms and conditions of the contract. The COR will certify receipt of contractor services via the Wide Area Workflow (WAWF) website. Certification of services shall be accomplished no later than seven calendar days after receipt of the invoice. To avoid payment of interest penalties, if the invoice is unacceptable, it should be rejected in WAWF within the first seven calendar days after receipt of the invoice, and the CO should be notified immediately.

9.0 Contract Management

The MFT shall conduct periodic progress meetings to review the contractor’s performance. At these meetings the CO will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. The contractor will immediately notify the CO and/or COR of any work being performed that the contractor considers over and above the requirements of the contract.

Appropriate action shall be taken to resolve any outstanding issues (i.e. CPARS, customer complaint reports, etc.). The MFT shall also provide any recommended changes to the QASP to the CO at the progress meetings or on an annual basis (at a minimum).

Appendix 1

C-32A FLIGHT CREW TRAINING

Services Summary and Method of Surveillance

Performance

Objective

PWS

Para.

Performance Threshold

Metric

Method of Surveillance

Provide C-32A Initial Pilot Training

1.3.1. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Number of complaints received from student course critiques during a training session quarter

Course Critiques and Periodic Surveillance

Provide C-32A Refresher Pilot Training (2 Day)

1.3.2. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Number of complaints received from student course

Provide C-32A Pilot Recurring Evaluation Training (3 Day)

1.3.3. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Number of complaints received from student course

Surveillance/

Provide C-32A Pilot Senior Officer Training

1.3.4. COR shall receive no more than one

validated student complaint concerning quality of instruction during a training quarter.

Number of complaints received from student course

Provide Simulator Time 1.3.5. Level D, CAT IIIB capable or better simulator operational 100% of the time.

Percentage of time the simulator is in working condition divided by the time it is not

Course Critiques.

Simulator Position Fill In

1.3.6.

The contractor instructor will participate in all required simulator training 100% of the time.

Percentage of time the instructor participates in simulator time divided by the time the instructor does not.

Course Critiques.

APPENDIX 2

CORRECTIVE ACTION REPORT (CAR)

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY MAJOR MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

ACCEPTED REJECTED

12. CLOSE DATE

Appendix 3

AMC OSA/EA, STUDENT COURSE CRITIQUE

Adobe Acrobat Document

OPERATIONAL SUPPORT AIRLIFT/EXECUTIVE AIRLIFT

STUDENT COURSE CRITIQUE

COURSE NUMBER

COURSE TITLE DATE

NAME OF STUDENT

GRADE (Optional) ORGANIZATION

NAME(S) OF INSTRUCTOR(S)

GRADE (As Req’d) REPLY REQUESTED

YES NO

1. Instructor professionalism?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

COMMENTS:

2. Instructor knowledge?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

3. Instructor’s explanations to student/trainee’s questions.

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

4. Were visual aids current and helpful?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

5. Were study materials (workbooks/handouts) current and helpful?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

6. Were course length and time for each unit of instruction adequate?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

7. (If applicable) How well did the exam evaluate your mastery of the course material?

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

OPR: AMC/A3TA-OSA/EA, 1 May 2012

PLEASE RATE THE COURSE OVERALL

UNSATISFACTORY MARGINAL SATISFACTORY EXCELLENT OUTSTANDING

OTHER COMMENTS: (Please make any additional comments you feel will help to improve this course)

FOLLOW-UP ACTION

DATE

CONDUCTED BY:

OPR: AMC/A3TA-OSA/EA, 1 May 2012 (REVERSE)

Appendix 4

Performance Assessment Report (PAR)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES

4. CONTRACTING OFFICER’S REPRESENTATIVE (COR) SIGNATURE AND DATE

5. COR PHONE 6. SUSPENSE DATE

I. PERFORMANCE

7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)

NEW

REPEAT

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS

CHECKED)

10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE CONCUR NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE

OF COR CITED DEFICIENCY

III. ACTION CORRECTED