SOW FY21 TWCF PAINT SIGN STRIPING dated 19 May 2021.pdf
PDF 145 KB Posted
- Attached to
- Various Paint/ Signs and Striping
- Solicitation number
- FA442721R0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA442721R00220002 SF 30.pdf | ||
| B564Repaint Rm 122 and 132 -2 (2).jpg | JPG image | |
| 810 WARNING SIGNS (1).jpg | JPG image | |
| B814 Fire Bottle Box Request.pptx | PPTX presentation | |
| B564Repaint Rm 122 and 132 -2 (1).jpg | JPG image | |
| 924 STRIPING.PNG | PNG image | |
| BLDG NUMBER SAMPLE.jpg | JPG image | |
| 810 WARNING SIGNS (2).jpg | JPG image | |
| B819 STRIPING.PNG | PNG image | |
| Solicitation Amendment FA442721R00220001 SF 30.pdf | ||
| Travis Design Guide FEG.PDF | ||
| Contract Security Clause 5 Mar 19.pdf | ||
| Solicitation - FA442721R0022.pdf | ||
| SOW FY21 TWCF PAINT SIGN STRIPING.pdf | ||
| CA20210007 Wage Determination.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19 May 21
STATEMENT OF WORK
FY21 TWCF PAINT SIGN STRIPING
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line item task listing description, and in accordance with (IAW) the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards. Point of contact for this project is: Warren Cabanlit, 60 CES/CEOES, (707) 424-2706.
DESCRIPTION OF WORK: FY21 TWCF Paint sign & striping projects
Project No.
W/O # BLDG POC Name POC Phone Description
4208225
Warren Cabanlit
424-2706
Exterior paint, fuel tank, 75SF
7909155
Paint hallway from atrium to university
4500SF
3 7492765 31
Wall paper removal & paint, main entrances (North, South and East)
1200SF
4 7141895 31
Warren Cabanlit 424-2706
Wall paper removal & paint, MXG Command Offices, rooms 31 through 34, 3000SF
4719300
Paint office, 630SF
4610028
Paint Treaty office wall
,500SF
3770332 819 Warren Cabanlit 424-2706
Restripe crosswalk line and 7 parking spots on south side, 300SF
4210186
Paint, Red and White hangar markings, 500SF
7427550
Northeast Parking lot parking spot lines, 3320SF
4744842
Paint x9 metal doors, 400SF
3223916 837 Warren Cabanlit 424-2706 Paint x5 rooms,3500SF
6557610
Paint floor, Epoxy,18000SF
1817984 3 Warren Cabanlit 424-2706
Paint P3 baggage claim area, 3960SF
5916821
Paint 2 boxes on ground for fire bottles ,16SF
5786773
Paint drywall repair,40SF
5752007
424-2706 Paint roll up door,80SF
7492340
Paint, planter circles red, 300SF
5406230
Prep, prime & paint retaining wall, 350SF
5619152
Paint, wall repair, 2SF
5201102
Paint door, 384SF
5361444
Paint door, 64SF
22 5752217
Paint floor and wall in room 115, 800SF
3550235
Paint entrance door near room 111, 160SF
24 5751948
Repaint warning signs on floor x60 each, 60SF
25 7184433 803 Warren Cabanlit
Chair rail/wall paper removal 600SF, and paint, 1200 SF
26 8807672 819 Warren Cabanlit
Interior paint, Rm 16, 2850SF
6912389 564 Warren Cabanlit 424-2706
Interior paint, Rms 122
& 123, 3320SF
28 7785375 859 Warren Cabanlit 424-2706 Paint 1st floor, rm 124 paint 7 walls, 1575SF
6061193 1802
Make & install facility number,1SF
6060542 1026
6056580 565
32 7184433 803 Warren Cabanlit 424-2706
Chair rail/wall paper removal, 200SF & Interior paint,700SF
ADDITIONAL REQUIREMENTS:
1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.
2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.
3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.
4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.
5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.
6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.
7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.
8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit
9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.
10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.
PERIOD OF PERFORMANCE:
All work orders will be completed in sixty days (60) days after receipt NTP.
| 19 May 21 |
| STATEMENT OF WORK |
| FY21 TWCF PAINT SIGN STRIPING |