SOW FY21 TWCF PAINT SIGN STRIPING.pdf

PDF 138 KB Posted

Attached to
Various Paint/ Signs and Striping Federal contract opportunity
Solicitation number
FA442721R0022
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Various Paint/ Signs and Striping, newest first.
File Type Posted
B564Repaint Rm 122 and 132 -2 (2).jpg JPG image
810 WARNING SIGNS (1).jpg JPG image
BLDG NUMBER SAMPLE.jpg JPG image
Solicitation Amendment FA442721R00220002 SF 30.pdf PDF
B814 Fire Bottle Box Request.pptx PPTX presentation
B564Repaint Rm 122 and 132 -2 (1).jpg JPG image
810 WARNING SIGNS (2).jpg JPG image
924 STRIPING.PNG PNG image
B819 STRIPING.PNG PNG image
Solicitation Amendment FA442721R00220001 SF 30.pdf PDF
SOW FY21 TWCF PAINT SIGN STRIPING dated 19 May 2021.pdf PDF
Travis Design Guide FEG.PDF PDF
Contract Security Clause 5 Mar 19.pdf PDF
Solicitation - FA442721R0022.pdf PDF
CA20210007 Wage Determination.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 Nov 20

STATEMENT OF WORK

FY21 TWCF PAINT SIGN STRIPING

GENERAL DESCRIPTION:

The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line item task listing description, and in accordance with (IAW) the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards.

DESCRIPTION OF WORK: FY21 TWCF Paint sign & striping projects

Project No.

W/O # BLDG Description

3640127

Paint interior paint, 2507SF

4208225

Exterior paint, fuel tank, 75SF

7909155

Paint hallway from atrium to university

4500SF

4 7492765 31

Wall paper removal & paint, main entrances (North, South and East)

1200SF

5 7141895 31

Wall paper removal & paint, MXG Command Offices, rooms 31 through 34, 3000SF

4719300

Paint office, 630SF

4610028

Paint Treaty office wall

,500SF

3770332 819

Restripe crosswalk line and 7 parking spots on south side, 300SF

4210186

Paint, Red and White hangar markings, 500SF

7427550

Northeast Parking lot parking spot lines, 3320SF

4744842

Paint x9 metal doors, 400SF

3223916 837 Paint x5 rooms,3500SF

6557610

Paint floor, Epoxy,18000SF

1817984 3

Paint P3 baggage claim area, 3960SF

5916821

Paint 2 boxes on ground for fire bottles ,16SF

5786773

Paint drywall repair,40SF

5752007

810 Paint roll up door,80SF

7492340

Paint, planter circles red, 300SF

5406230

Prep, prime & paint retaining wall, 350SF

5619152

Paint, wall repair, 2SF

5201102

Paint door, 384SF

5361444

Paint door, 64SF

23 5752217

Paint floor and wall in room 115, 800SF

3550235

Paint entrance door near room 111, 160SF

25 5751948

Repaint warning signs on floor x60 each, 60SF

26 7184433 803

Chair rail removal 600SF, and paint, 1200

SF

27 8807672 819 Interior paint, Room 16, 2850SF

6912389 819

Interior paint, Rooms

122 & 123, 3320SF

29 7785375 859

Paint 1st floor, Room 124 paint 7 walls, 1575SF

6061193 1802

Make & install facility number,1SF

6060542 1026

6056580 565

33 7184433 803

Chair rail removal, 200SF & Interior paint,700SF

ADDITIONAL REQUIREMENTS:

1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.

2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.

3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.

4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.

5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.

6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.

7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.

8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit

9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved

Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.

10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.

PERIOD OF PERFORMANCE:

All work orders will be completed in sixty days (60) days after receipt NTP.