Description_of_Requirement.pdf

PDF 107 KB Posted

Attached to
Honeywell EBI R500 Equipment
Solicitation number
FA4427-17-Q-0096
Issued by

View the file

Other files

File Type Posted
SOW_-_Upgrade_Honeywell_ICS_System_-_Bldg_877__2_Jun_17.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Honeywell Internal communicate with the new R500 program and a complete usable controls system will be provided at turn over.

Confirm that Contractor understands that point servers will be relocated from Bldg 381 to 877 server room. Additionally, the ICS system network communication will be transferred over to the CE-

VLAN. Coordination has been arranged with 60CS for support with LAN connections during project execution.

WORK TO BE PERFORMED

THIS QUOTE IS TO PROVIDE AN UPGRADE AT TRAVIS AIR FORCE BASE TO THE HONEYWELL ENTERPRISE BUILDING INTERGATOR (EBI) FROM CURRENT VERISON R310 TO R500. THIS QUOTE WILL INCLUDE ALL HARDWARE UPGRADES, SOFTWARE UPGRADES AND THE LABOR TO INSTALL. TECH LABOR PROVIDED TO

INSTALL, TEST, CONFIGURE AND COMPLETE A FINAL CHECKOUT.

LINE ITEMS

EBI R500 HARDWARE INCLUDES 1 RACK MOUNTED SERVER, MONITOR, KEYBOARD AND MOUSE. TECH

LABOR FOR SET UP, SYNCHRONIZATION AND FINAL CHECKOUT.

HARDWARE COST

SOFTWARE COST

LABOR COST

TOTAL

EBI R500 POINT SERVER UPGRADE TO INCLUDE (3) THREE RACK MOUNTED SERVERS. INCLUDES THE REPLACEMENT OF (2) TWO FAILED POINT SERVERS IN ORDER TO REIMAGE THE FAILED SERVERS, SET UP, PROGRAM AND COMPILE. INCLUDES ONE (1) 45U SERVER RACK WITH ONE (1) UPS POWER SURGE

PROTECTION

HARDWARE COST SOFTWARE

COST

LABOR COST

TOTAL

WORKSTATION LAPTOP UPDATE, INCLUDES NEW HARDWARE SWITCH, UPDATED SOFTWARE AND

LABOR TO INSTALL AND SET UP. INCLUDES CARE SOFTWARE UPDATE, REIMAGING AND SET UP FOR

LAPTOP USE.

HARDWARE COST Honeywell recently provided a new laptop under the current ESPC SOFTWARE COST contract, will this laptop be updated with the new program?

LABOR COST

TOTAL

WORKSTATION COMPUTER UPGRADE FOR EMCS 877 WORKSTATION, INCLUDES NEW SOFTWARE AND

LABOR TO INSTALL AND SET UP. REIMAGING AND SET UP FOR WORKSTATION. ALSO INCLUDES TWO (2)

24 INCH MONITORS.

HARDWARE COST

SOFTWARE COST

LABOR COST

TOTAL

LON SOFTWARE AND HARDWARE TO ADD LNS DATABASE. THIS ALLOWS ACCESS FROM EBI TO YOUR POINT SERVERS, PROVIDES ENTIRE SYSTEM SYNCHRONIZATION. INCLUDE ECHELON HARDWARE AND SOFTWARE PLUS LABOR TO INSTALL ON EACH POINT SERVER. ADD THE LABOR TO INSTALL UP TO TEN

(10) BNA TO CONNECT THE REMOTE SITES ON THE POINT SERVERS.

HARDWARE COST Verify if all required software/interface/hardware/devices are SOFTWARE COST included to ensure existing legacy XBSI and EBI systems will

LABOR COST

TOTAL