As Builts pg 226-300.pdf

PDF 23 MB Posted

Attached to
Repair Flight Simulator Facility, B108 Federal contract opportunity
Solicitation number
FA441822R0007
Issued by
Department of the Air Force Air Mobility Command

About this file

This solicitation is for repair work on a flight simulator facility at Joint Base Charleston in South Carolina. The Department of the Air Force Air Mobility Command is seeking bids for project number DKFX 1098455/1073222 to provide labor, equipment, materials, and supervision to complete repairs to Flight Simulator Facility B108. The project magnitude is estimated between $5 million and $10 million. This is an 8(a) small business set-aside solicitation using trade-off procedures. The notice to proceed will be issued within 45 days of award. The NAICS code is 236220 for commercial and institutional building construction and the size standard is $39.5 million. Any questions should be directed to the point of contact listed. The closing date was not provided.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 16

22 23

24 25

28 29

8A

8B

11A

24A 25A

30A

30B

28A

FIRST FLOOR PLAN

3/32"=1’−0"

NEW WALL

NEW WALL

LEGEND

LOCATION 1: NEW SECURITY WALL WITH DOOR.

LOCATIONS 2,33,34: INSTALL EXPANDED METAL INSIDE LOUVERS.

LOCATIONS 5,11,17,18: REPLACE STOREFRONT DOORS & FRAMES WITH EXIT ONLY STEEL DOORS.

LOCATIONS 14,16: REPLACE SINGLE STOREFRONT DOORS & FRAMES WITH DOUBLE STEEL DOORS.

LOCATIONS 8A,11A,22,23,24,24A,25,25A,28,29,30A,30B: REPLACE EXISTING INTERIOR DOORS WITH SOLID CORE WOODEN DOORS.

LOCATIONS 19,30: DEMO EXISTING PARTITION WALL & REPLACE WITH STEEL STUD, INSULATED PERMANENT WALLS.

LOCATIONS 6,26: INSTALL OPAQUE DOUBLE PANE GLAZING OVER EXISTING WINDOWS.

LOCATIONS 8,9,31,32: INSTALL GLASS BREAK SENSOR (GBS).

SECOND FLOOR PLAN

3/32"=1’−0"

NEW WALL

LOCATIONS 8B,12,20: REPLACE DOOR HARDWARE ONLY.

LOCATION 3: INSTALL EXPANDED METAL GRATING OVER INSIDE OF DOORS.

As builts pg 1-300 226
As builts pg 1-300 227
As builts pg 1-300 228
As builts pg 1-300 229
As builts pg 1-300 230
As builts pg 1-300 231
As builts pg 1-300 232
As builts pg 1-300 233
As builts pg 1-300 234
As builts pg 1-300 235
As builts pg 1-300 236
As builts pg 1-300 237
As builts pg 1-300 238
As builts pg 1-300 239
As builts pg 1-300 240
As builts pg 1-300 241
As builts pg 1-300 242
As builts pg 1-300 243
As builts pg 1-300 244
As builts pg 1-300 245
As builts pg 1-300 246
As builts pg 1-300 247
As builts pg 1-300 248
As builts pg 1-300 249
As builts pg 1-300 250
As builts pg 1-300 251
As builts pg 1-300 252
As builts pg 1-300 253
As builts pg 1-300 254
As builts pg 1-300 255
As builts pg 1-300 256
As builts pg 1-300 257
As builts pg 1-300 258
As builts pg 1-300 259
As builts pg 1-300 260
As builts pg 1-300 261
As builts pg 1-300 262
As builts pg 1-300 263
As builts pg 1-300 264
As builts pg 1-300 265
As builts pg 1-300 266
As builts pg 1-300 267
As builts pg 1-300 268
As builts pg 1-300 269
As builts pg 1-300 270
As builts pg 1-300 271
As builts pg 1-300 272
As builts pg 1-300 273
As builts pg 1-300 274
As builts pg 1-300 275
As builts pg 1-300 276
As builts pg 1-300 277
As builts pg 1-300 278
As builts pg 1-300 279
As builts pg 1-300 280
As builts pg 1-300 281
As builts pg 1-300 282
As builts pg 1-300 283
As builts pg 1-300 284
As builts pg 1-300 285
As builts pg 1-300 286
As builts pg 1-300 287
As builts pg 1-300 288
As builts pg 1-300 289
As builts pg 1-300 290
As builts pg 1-300 291
As builts pg 1-300 292
As builts pg 1-300 293
As builts pg 1-300 294
As builts pg 1-300 295
As builts pg 1-300 296
As builts pg 1-300 297
As builts pg 1-300 298
As builts pg 1-300 299
As builts pg 1-300 300

File details come from the government source that posted it. Updated .