Attachment 1 - Drawings - Pre-Construction Addendum1.pdf
PDF 22 MB Posted
- Attached to
- Repair Flight Simulator Facility, B108 Federal contract opportunity
- Solicitation number
- FA441822R0007
About this file
This solicitation is for repair work on a flight simulator facility at Joint Base Charleston in South Carolina. The Department of the Air Force Air Mobility Command is seeking bids for project number DKFX 1098455/1073222 to provide labor, equipment, materials, and supervision to complete repairs to Flight Simulator Facility B108. The project magnitude is estimated between $5 million and $10 million. This is an 8(a) small business set-aside solicitation using trade-off procedures. The NAICS code is 236220 for commercial and institutional building construction with a size standard of $39.5 million. The notice to proceed will be issued within 45 days of award. Any questions should be directed to the point of contact listed.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
E W
B
A IR AS
I N 62 8T H
IR
A
D
MAN
CO
M
MO
IT Y
B I L
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/4 /2
:4
:3
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
G-001
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
TI
TL
E
SH
EE
T
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
DKFX 1098455/1073222
REPAIR FACILITY ENVELOPE, HVAC
REPAIRS, & ROOF FLIGHT SIMULATOR, B.108
JOINT BASE CHARLESTON AIR BASE WING
CHARLESTON, SOUTH CAROLINA
NOVEMBER 08, 2021
ARCHITECT
BULLOCK TICE ASSOCIATES
909 EAST CERVANTES STREET
PENSACOLA, FL 32501
850.434.5444
MECHANICAL ENGINEER
PETERSON ENGINEERING INC.
75 SOUTH F STREET
PENSACOLA, FL 32502
850.434.0513
ELECTRICAL ENGINEER
BAGWELL ENGINEERING INC.
216 EAST GOVERNMENT STREET
PENSACOLA, FL 32502
850.462.8040
FIRE PROTECTION ENGINEER
FISHER ENGINEERING
10475 MEDLOCK BRIDGE ROAD
JOHNS CREEK, GA 30097
770.495.7770
STRUCTURAL ENGINEER
JOE DEREUIL ASSOCIATES
301 WEST CERVANTES STREET
PENSACOLA, FL 32501
850.429.1951
CIVIL ENGINEER
STANTEC
2316 KILLEARN CTR. BVLD. SUITE 102
TALLAHASSEE, FL 32309
850.878.5001
CODE SUMMARY
Code: International Building Code 2018 Wind Design Data:
Ultimate Design Wind Speed: 144 mph Nominal Design Wind Speed: 111.54 mph Risk Category: II Mean Roof Ht (h): 40.0 ft Exposure Category: C Enclosure Classif.:Enclosed Building Internal pressure Coef.: +/-0.18 Directionality (Kd): 0.85
Component and cladding ultimate wind pressures "a", ft.= 16 ft.
Overhang soffit pressure equals adj wall pressure (which includes internal pressure of 8.5 psf)
Roof
Area Negative Zone 1 Negative Zone 2e Negative Zone 2r Negative Zone 3 Positive All Zones Overhang Zone 1 Overhang Zone 2e Overhang Zone 2r Overhang Zone 3
10 sf -69.7 -93.2 -121.5 -93.2 41.4 -84.8 -108.3 -136.6 -136.6
20 sf -69.7 -85.6 -109.5 -85.6 35.8 -84.8 -106.1 -130.0 -122.4
100 sf -55.6 -67.9 -81.7 -67.9 22.6 -94.2 -101.1 -114.8 -89.5
200 sf -55.6 -60.3 -69.7 -60.3 22.6 -94.2 -98.9 -108.3 -75.3
Surface Pressure (psf)
Parapet
Area Case A:
10 sf 0.0 0.0 0.0
20 sf 0.0 0.0 0.0
100 sf 0.0 0.0 0.0
200 sf 0.0 0.0 0.0
Solid Parapet Pressure (psf)
500 sf 0.0 0.0 0.0
Zone 2e Zone 2r Zone 3
Case B: Interior Zone Corner Zone
10 sf -69.7
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
Wall
Area Negative Zone 4 Negative Zone 5 Positive Zones 4 & 5
10 sf -60.3 -74.4 55.6
200 sf -49.5 -52.8 44.7
500 sf -46.1 -46.1 41.4
Surface Pressure (psf)
100 sf -52.0 -74.4 47.2
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
/4 /2
:5
:2
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
G-002
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
C O
D E
SU
M
M
AR
Y
AN
D
IN
D
EX
O F
D R
AW
IN
G S
K . W
H
IT
E K
. W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
GENERAL
G-001 TITLE SHEET
G-002 CODE SUMMARY AND INDEX OF DRAWINGS
G-101 BASE MAP AND CONSTRUCTION LAYDOWN AREA
G-111 PHASING & WORK RESTRICTIONS PLANS
G-121 ASBESTOS ABATEMENT ROOF PLAN
CIVIL
C-100 CIVIL PLANS AND DETAILS
ARCHITECTURAL
A-001 LEGEND, NOTES, & ABBREVIATIONS
A-100 OVERALL FLOOR PLANS - EXISTING / DEMOLITION
A-101 FIRST FLOOR DEMOLITION CEILING PLAN - WEST
A-102 FIRST FLOOR DEMOLITION CEILING PLAN - EAST
A-103 SECOND FLOOR DEMOLITION CEILING PLAN - WEST
A-104 SECOND FLOOR DEMOLITION CEILING PLAN - EAST
A-110 OVERALL FLOOR PLANS
A-111 FIRST FLOOR PLAN - WEST
A-112 FIRST FLOOR PLAN - EAST
A-113 SECOND FLOOR PLAN - WEST
A-114 SECOND FLOOR PLAN - EAST
A-140 ROOF PLAN
A-141 ROOF DEMOLITION PLAN - WEST
A-142 ROOF DEMOLITION PLAN - EAST
A-143 ROOF PLAN - WEST
A-144 ROOF PLAN - EAST
A-151 FIRST FLOOR REFLECTED CEILING PLAN - WEST
A-152 FIRST FLOOR REFLECTED CEILING PLAN - EAST
A-153 SECOND FLOOR REFLECTED CEILING PLAN - WEST
A-154 SECOND FLOOR REFLECTED CEILING PLAN - EAST
A-201 EXISTING EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-501 ROOF DETAILS
A-502 ROOF DETAILS
A-503 ROOF DETAILS
A-504 ROOF DETAILS
INTERIOR DESIGN
I-601 FINISH SCHEDULE AND NOTES
FIRE PROTECTION
FA101 FIRST FLOOR PLAN - EAST - FIRE ALARM
FA102 FIRST FLOOR PLAN - WEST - FIRE ALARM
FA103 SECOND FLOOR PLAN - EAST - FIRE ALARM
FA104 SECOND FLOOR PLAN - WEST - FIRE ALARM
FA501 DETAILS - FIRE ALARM
FX101 FIRST FLOOR PLAN - EAST - FIRE PROTECTION
FX102 FIRST FLOOR PLAN - WEST - FIRE PROTECTION
FX103 SECOND FLOOR PLAN - EAST - FIRE PROTECTION
FX104 SECOND FLOOR PLAN - WEST - FIRE PROTECTION
MECHANICAL
M-001 MECHANICAL NOTES, LEGEND, AND ABBREVIATIONS
MD-101 MECH ROOM 201 HVAC DEMO PLAN
M-101 GROUND FLOOR HVAC PLAN - WEST
M-102 GROUND FLOOR HVAC PLAN - EAST
M-103 SECOND FLOOR HVAC PLAN - WEST
M-104 SECOND FLOOR HVAC PLAN - EAST
M-401 MECHANICAL ROOM 203 AND 129 ENLARGED PLAN
M-402 MECHANICAL ROOM 228 ENLARGED PLAN
M-403 MECHANICAL ROOM 201 ENLARGED PLAN
M-501 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 CHILLED WATER DIAGRAM FOR SIMS 1 & 2
M-604 CHILLED WATER DIAGRAM FOR SIM 3 (SIM-9)
M-605 CHILLED WATER DIAGRAM FOR SIM 4 (SIM-21)
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
M-703 HVAC CONTROLS
M-704 HVAC CONTROLS
M-705 HVAC CONTROLS
ELECTRICAL
E-001 ELECTRICAL LEGEND, GENERAL NOTES
E-002 NEW WORK POWER RISER DIAGRAMS
E-003 PANEL SCHEDULES
E-004 LIGHTNING PROTECTION DETAILS
E-100 FIRST FLOOR DEMOLITION PLAN - WEST
E-101 FIRST FLOOR DEMOLITION PLAN - EAST
E-102 SECOND FLOOR DEMOLITION PLAN - WEST
E-103 SECOND FLOOR DEMOLITION PLAN - EAST
E-104 ENLARGED MECHANICAL ROOM 201 DEMOLITION PLAN
E-105 LIGHTNING PROTECTION DEMOLITION PLAN - WEST
E-106 LIGHTNING PROTECTION DEMOLITION PLAN - EAST
E-200 FIRST FLOOR NEW WORK PLAN - WEST
E-201 FIRST FLOOR NEW WORK PLAN - EAST
E-202 SECOND FLOOR NEW WORK PLAN - WEST
E-203 SECOND FLOOR NEW WORK PLAN - EAST
E-204 ENLARGED MECHANICAL ROOM 201 NEW WORK PLAN
E-205 LIGHTNING PROTECTION NEW WORK PLAN - WEST
E-206 LIGHTNING PROTECTION NEW WORK PLAN - EAST
S O
U
TH
CAROL I N
A
LLLL
II II
CC CC
EEEE
NNNN
SSSS
EEEE
DDDD
PPPP
RRRR
OOOO FFFF EEEE SSSS SSSS IIII OOOO NNNN AAAA LLLL
EEEE
NNNN
GGGG
IIII
NNNN
EE EE
EE EE
RRRR
L I
U E R
E D
HPES
OJ
S I
U O
L
No. 25669
1182021
PROJECT LOCATION
BUILDING 108
MAIN ENTRY GATE
PASS AND REGISTRATION
COMMERCIAL
ENTRY GATE
COMMERCIAL VEHICLE INSPECTION FACILITY
IN
TE
R S
TA
TE
AVIATOR AVE
S A
VIATIO
N
AVE
A R
TH
U
R D
R
E HILL BVLD
PROPOSED LAYDOWN AREA
PRIMARY CRANE LOCATION
BUILDING 108
E HILL BVLD
B A
T E
S S
T
PROVIDE TEMPORARY FENCING AROUND LAYDOWN AREA.FENCING
SHALL BE GALVANIZED STEEL CHAIN LINK FENCING AT 6'-0" TALL.
POSTS SHALL BE SPACED AT 10'-0" MAX. AND BURRIED AT 36" MIN.
LAYDOWN AREA NOTES
1. UTILITIES: CONTRACTOR SHALL PERFORM ALL NECESSARY
COORDINATION AND SHALL BEAR ALL COSTS NECESSARY TO
ESTABLISH ELECTRICAL, WATER, AND SEWER SERVICE TO THE
LAYDOWN AREA.
2. WATER: CONTRACTOR MAY OBTAIN WATER VIA EXISTING FIRE
HYDRANT, AS SHOWN ON SHEET G-101. THE CONTRACTOR SHALL
PROVIDE HYDRANT METERS AND BACKFLOW PREVENTION. WATER
LINES SHALL BE SECURED AT ALL TIMES AND REMOVED UPON
COMPLETION.
3. PORTABLE TOILETS: PRIOR TO ANY CONSTRUCTION ACTIVITIES,
PROVIDE TEMPORARY SEWER AND SANITATION FACILITIES, AS DEFINED
IN THE SPECIFICATIONS, FOR ALL WORK AREAS AND ACCESS GATES.
4. SECURITY: THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
MAINTAINING SECURITY AT THE LAYDOWN AREA.
5. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA
IN A GOOD STATE OF APPEARANCE.
6. FOD: THE CONTRACTOR SHALL MAINTAIN THE LAYDOWN AREA SUCH
THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN
OBJECTS AND DEBRIS.
7. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA
OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN
A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR AN
OFFSITE LAYDOWN AREA.
8. OTHER PERMITS: CONTRACTOR SHALL OBTAIN ALL PERMITS
NECESSARY FOR THE ERECTION AND OPERATION OF
PLANTS/CRUSHER.
9. AIR SPACE LIMITATIONS/7460'S/NOTAMS: AIRFIELD WAIVERS DURING
CONSTRUCTION WILL NOT BE REQUIRED. THE CONTRACTOR WILL ONLY
NEED A 7460-1 FAA NOTICE OF CONSTRUCTION.
HAUL ROUTE NOTES
1. LOCATION: COMMERCIAL LARGE TRUCKS COMING INTO THE
CONSTRUCTION SITE WILL NEED TO ENTER THE BASE THROUGH THE
COMMERCIAL VEHICLE ENTRY GATE. CONTRACTORS WITH CAC CARDS
MAY COME THROUGH EITHER GATE.
2. EXISTING ROADS: HAUL ROUTES UTILIZING EXISTING BASE ROADWAYS
WILL REMAIN OPEN TO PATRON TRAFFIC AT ALL TIMES DURING
CONSTRUCTION. CONTRACTOR SHALL EXERCISE ALL NECESSARY
PROTOCOLS TO INSURE SAFETY TO THE GENERAL PUBLIC ON ALL HAUL
ROUTES.
3. DAMAGE: CONTRACTOR SHALL PREPARE A PHOTOGRAPHIC RECORD OF
EXISTING ROADWAYS, CURBS, AND LANDSCAPING PRIOR TO
CONSTRUCTION. DAMAGE TO EXISTING ROADWAYS, CURBS, AND
LANDSCAPING CAUSED BY CONSTRUCTION TRAFFIC, SHALL BE
REPAIRED TO THE GOVERNMENT'S SATISFACTION AT NO ADDITIONAL
COST.
4. TRAFFIC CONTROL: IF DEEMED NECESSARY BY EITHER THE
CONTRACTOR OR GOVERNMENT, THE CONTRACTOR SHALL, AT NO
ADDITIONAL COST TO THE GOVERNMENT, PREPARE AND SUBMIT A
TRAFFIC CONTROL PLAN IN KEEPING WITH THE LATEST MUTCD MANUAL
FOR APPROVAL.
5. FLAGMEN: PROVIDE AND MAINTAIN FLAG MEN TO DIRECT AND CONTROL
CONSTRUCTION TRAFFIC WHERE ALL UTILIZED HAUL ROUTES ARE ON
ACTIVE ROADWAYS OR CROSS ACTIVE ROADS. COORDINATE FLAGMEN
LOCATIONS WITH THE CONTRACTING OFFICER.
6. TEMPORARY HAUL ROUTES: CONTRACTOR SHALL BE RESPONSIBLE FOR
CONSTRUCTING AND MAINTAINING TEMPORARY HAUL ROUTES AS
REQUIRED. CONTRACTOR SHALL RESTORE HAUL ROUTES TO EXISTING
OR BETTER CONDITIONS AT THE COMPLETION OF PROJECT.
7. LAND DISTURBANCE PERMIT: IF LOCATED OUTSIDE THE PERMIT AREA
OF DISTURBANCE FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN
A SEPARATE LAND DISTURBANCE/STORMWATER PERMIT FOR
CONSTRUCTION OF HAUL ROUTES.
8. APPEARANCE: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES
IN A GOOD STATE OF APPEARANCE.
9. FOD: THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTES SUCH
THAT IT DOES NOT GENERATE OR BECOME A SOURCE OF FOREIGN
OBJECT DEBRIS.
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/4 /2
:4
:4
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
G-101
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
BA
SE
M
AP
A N
D C
O N
ST
R
U C
TI
O
N L
AY
D
O W
N A
R
EA
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
N.T.S.G-101
1 AERIAL MAP / CONTRACTOR HAUL ROUTE
N.T.S.G-101
2 CONTRACTOR LAYDOWN AREA
SIMULATOR BAY
1 (WST-2)
SIMULATOR BAY
2 (WST-1)
SIMULATOR BAY
3 (WST-9)
SIMULATOR BAY
4 (WST-21)
PHASE 1PHASE 2
PHASE 3PHASE 4
PHASE 5PHASE 6
P H
A S
E
WSTLS
LS ROOM
COMPUTER
ROOM
COMPUTER
ROOM
COMPUTER
ROOM
COMPUTER
ROOM
SIMULATOR BAY
1 (WST-2)
SIMULATOR BAY
2 (WST-1)
SIMULATOR BAY
3 (WST-9)
139SIMULATOR BAY
4 (WST-21)
PHASE 1PHASE 2
PHASE 3PHASE 4
PHASE 5
P H
A S
E
PHASE 7
PHASE 7
PHASING NOTES
PHASE 1:
WORK SHALL BE LIMITED TO SIMULATOR BAY 1 AND COMPUTER ROOM SERVING
SIMULATOR BAY 1. EQUIPMENT IN BOTH THE HYDRAULIC ROOM AND MECHANICAL
ROOM SERVING SIMULATOR BAY 1 AND 2 SHALL ALSO BE PART OF THIS PHASE.
EQUIPMENT SERVING SIMULATOR BAY 2 SHALL REMAIN OPERATIONAL DURING
WORK TO SIM BAY 1 EQUIPMENT. ANY SIMULATOR OUTAGES SHALL BE
COORDINATED AND APPROVED BY THE GOVERNMENT PRIOR TO CONSTRUCTION
STARTING.
PHASE 2:
PHASE 3:
PHASE 4:
PHASE 5:
WORK INCLUDES REPAIRS TO ADMIN AREAS OF THE BUILDING. WORK SHALL BE
COORDINATED WITH THE GOVERNMENT AND END USERS PRIOR TO START OF ANY
PORTION OF WORK. WORK SHALL BE DONE IN CONJUNCTION WITH PHASES 1-4.
CONTRACTOR SHALL PRIORITIZE WORK IN CORRIDORS FOR QUICK COMPLETION TO
MINIMIZE DOWNTIME.
PHASE 6:
WORK INCLUDES ANY MODIFICATIONS TO THE EXISTING MECHANICAL ELECTRICAL
AND COMMUNICATIONS SYSTEMS SERVING THE ENTIRE BUILDING. COORDINATE
ANY PARTICULAR OUTAGES THAT MAY AFFECT PREVIOUS PHASES. WORK SHALL BE
DONE IN CONJUNCTION WITH PHASES 1-4.
WORK SHALL BE LIMITED TO SIMULATOR BAY 2 AND COMPUTER ROOM SERVING
SIMULATOR BAY 2. EQUIPMENT IN BOTH THE HYDRAULIC ROOM AND MECHANICAL
ROOM SERVING SIMULATOR BAY 1 AND 2 SHALL ALSO BE PART OF THIS PHASE.
EQUIPMENT SERVING SIMULATOR BAY 1 SHALL REMAIN OPERATIONAL DURING
WORK TO SIM BAY 2 EQUIPMENT. ANY SIMULATOR OUTAGES SHALL BE
COORDINATED AND APPROVED BY THE GOVERNMENT PRIOR TO CONSTRUCTION
STARTING.
WORK SHALL BE LIMITED TO SIMULATOR BAY 3, COMPUTER ROOM SERVING
SIMULATOR BAY 3, EQUIPMENT IN THE HYDRAULIC ROOM, AND MECHANICAL ROOM
SERVING SIMULATOR BAY 3. ANY SIMULATOR OUTAGES SHALL BE COORDINATED
AND APPROVED BY THE GOVERNMENT PRIOR TO CONSTRUCTION STARTING.
WORK SHALL BE LIMITED TO SIMULATOR BAY 4, COMPUTER ROOM SERVING
SIMULATOR BAY 4, EQUIPMENT IN THE HYDRAULIC ROOM, AND MECHANICAL ROOM
SERVING SIMULATOR BAY 4. ANY SIMULATOR OUTAGES SHALL BE COORDINATED
AND APPROVED BY THE GOVERNMENT PRIOR TO CONSTRUCTION STARTING.
PHASE 7:
WORK INCLUDES ANY MODIFICATIONS AND REPAIRS TO THE EXISTING ROOF
SYSTEM AND COMPONENTS. WORK SHALL BE DONE IN CONJUNCTION WITH PHASES
1-4.
GENERAL NOTES
1. REFER TO SPECIFICATION SECTION 01 14 00 - WORK RESTRICTIONS FOR ADDITIONAL
REQUIREMENTS.
2. COORDINATION SHALL BE DONE THROUGH THE CONTRACTING OFFICER'S
REPRESENTATIVE. THE CONTRACTOR SHALL REVIEW WITH THE BUILDING OCCUPANTS
THE ANTICIPATED WORK SCHEDULE AND SEQUENCE OF CONSTRUCTION PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
3. THE FINAL WORK SCHEDULE AND SEQUENCE SHALL BE SUBMITTED TO THE
CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO THE COMMENCEMENT OF WORK.
4. AREAS SHOWN ARE APPROXIMATE LIMITS OF WORK. SEE MECHANICAL AND ELECTRICAL
FOR ADDITIONAL DETAILS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND SEQUENCING.
6. WIRELESS DEVICES SUCH AS TWO-WAY RADIOS, CAMERAS, AND CELL PHONES ARE
PROHIBITED IN SECURE AREAS UNLESS SPECIFICALLY AUTHORIZED BY TENANT.
7. VISITORS MUST SIGN IN/OUT EACH DAY AND OBTAIN VISITOR BADGES FROM TENANT.
BADGES MUST BE RETURNED AT THE END OF EACH WORK DAY. A BASE BADGE IS BE
REQUIRED FOR ALL WHO ACCESS THE BASE.
8. PHASING OF THE CONSTRUCTION IS REQUIRED FOR THE WORK. THE FACILITY WILL BE
IN FULL OPERATION AND FUNCTIONING IN SOME CAPACITY 24/7, AND ONLY ONE
SIMULATOR BAY CAN BE DOWN AT ANY TIME DURING CONSTRUCTION THE PHASING OF
CONSTRUCTION REQUIRES FULL COORDINATION WITH THE TENANT SINCE THE BUILDING
IS A SECURE FACILITY WITH LIMITED ACCESS. WORK EFFORT WILL BE LIMITED TO THE
ABILITY OF THE TENANT TO PROVIDE ESCORTS FOR THE CONSTRUCTION STAFF AT ANY
GIVEN TIME. FOR BIDDING AND PLANNING PURPOSES, THE TENANT PLANS TO PROVIDE
TWO ESCORTS MONDAY THROUGH FRIDAY, FROM 7:00 TO 3:30 PM. CONTRACTORS WILL
BE REQUIRED TO STAY IN IN SIGHT OF THEIR ESCORT AT ALL TIMES INSIDE BUILDING 108
SECURE SPACES. FIVE CONTRACTOR PERSONNEL PER ESCORT IS THE MAXIMUM
ALLOWED PER ESCORT; WITH THE EXCEPTION OF WORKING INSIDE A SIMULATOR
BAY. WORKING INSIDE ONE SIMULATOR BAY, ONE OF THE BASE TENANT ESCORTS CAN
ACCOMPANY UP TO TEN CONTRACTOR PERSONNEL, WHILE THE SECOND BASE TENANT
ESCORT CAN ONLY ACCOMPANY UP TO 5 CONTRACTOR PERSONNEL. THE TENANT
BASE PREFERENCE WILL BE TO START WORK FROM BAY 1 (EAST SIDE) AND WORK
TOWARD BAY 4 TO THE WEST SIDE. BUILDING 108 WILL BE OCCUPIED DURING
CONSTRUCTION.
9. GENERALLY THERE WILL BE 4 MAJOR PHASES WITH EACH SIMULATOR BAY (AND
ASSOCIATIVE ADMINISTRATIVE AREAS) BEING PHASED AREAS FOR WORK DUE TO THE
IMPORTANCE OF THE SIMULATOR TO THE AIR FORCE MISSION; THE REALLOCATE/MOVE
THE MAJOR PHASING AROUND AT NO COST TO THE GOVERNMENT AND PROCEED TO
ANOTHER MAJOR PHASE FOR THEIR WORK. AIR FORCE WILL PROVIDE 3 MONTHS
MINIMUM WRITTEN NOTICE OF ANY EQUIPMENT/UPGRADE MODIFICATION NEEDED THAT
WILL REQUIRE A PHASING CHANGE. THIS SCHEDULE MODIFICATION IS ONLY FOR MAJOR
SOFTWARE/EQUIPMENT CHANGES/UPGRADES REQUIRED BY THE SIMULATOR
MANUFACTURER AND THE AIR FORCE MOBILITY AIR COMMAND. CONTRACTOR IS
REQUIRED TO ADJUST HIS WRITTEN CONSTRUCTION SCHEDULE AT HIS COSTS FOR ANY
PHASING MODIFICATION.
10. THE OPERATION OF THE FACILITY IN THE RENOVATION OVERALL AREA WILL CONTINUE
WHILE THE CONSTRUCTION OF THE DIFFERENT PHASES OCCURS.
11. CONSTRUCTION PHASING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE PHASES
THAT ARE SHOWN AND DESCRIBED IN THESE DOCUMENTS CAN BE SCHEDULED TO MEET
THE MILESTONE DATES IN THE CONTRACT. THE CONTRACTOR SHALL SUBMIT PROPOSED
PHASING PLANS WITH A DETAILED CONSTRUCTION SCHEDULE FOR REVIEW AND
APPROVAL PRIOR TO BEGINNING WORK.
12. THE CONTRACTOR MUST SUBMIT A DETAILED CONSTRUCTION PLAN THAT FOLLOWS
SIMILAR PHASES SHOWN BEFORE COMMENCING CONSTRUCTION ACTIVITIES.
13. CONTRACTOR MUST PROVIDE TEMPORARY DUST BARRIERS/PARTITIONS/ BETWEEN
CURRENT CONSTRUCTION PHASES.
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/5 /2
:2
:2
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
G-111
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
PH
AS
IN
G
W
O R
K R
ES
TR
IC
TI
O N
S
PL
AN
S
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
1/16" = 1'-0"G-111
1 FIRST FLOOR PHASING PLAN
1/16" = 1'-0"G-111
2 SECOND FLOOR PHASING PLAN
SCALE: 1/16" = 1'-0"
0 8' 16' 32'
PLAN
NORTH
PLAN
NORTH
AREA DENOTES KNOWN AREAS OF ACM
WITHIN THE PROJECT.
M A
T C
H
LI
N E
M A
T C
H
LI
N E
EXISTING BUILT-
UP ROOF
NOTE:
REMOVE ASBESTOS MATERIALS, NON-FRIABLE
ROOF FLASHING FELT AROUND ROOF
PARAPETS AND OTHER AREAS IDENTIFIED ON
ASBESTOS REPORT DATED JUNE 1, 2020 - SEE
SPECIFICATIONS.
ASBESTOS ABATEMENT NOTES
1. THIS DRAWING INDICATES AREAS OF ASBESTOS ABATEMENT. OTHER
ABATEMENT REQUIRED INCLUDING MODIFICATIONS THAT MAY EXTEND
BEYOND THE AREAS SHOWN SHALL INCLUDE ANY NECESSARY
DEMOLITION OF SPACES ADJACENT TO, ABOVE AND/ OR BELOW
REQUIRED FOR THE INSTALLATION OF WORK IN THIS PROJECT.
2. THE CONTRACTOR SHALL COORDINATE ALL ABATEMENT WORK WITH
DEMOLITION CONTRACTOR.
3. CONTRACTOR SHALL DELIVER TO THE COR COPIES OF ALL
ENVIRONMENTAL PERMITS AND ALL WASTE MANIFESTS. WASTE MAY
NOT BE STORED AND MUST BE DISPOSED OF IMMEDIATELY FOLLOWING
ABATEMENT.
4. THE ASBESTOS ABATEMENT CONTRACTOR SHALL DECONTAMINATE
ALL BUILDING MATERIALS, WHICH BECOME CONTAMINATED OR ARE
DISTURBED FROM ASBESTOS REMOVAL.
5. ASBESTOS ABATEMENT CONTRACTOR SHALL COORDINATE ON SITE
WORK WITH THE COR, GENERAL, AND SUB-CONTRACTORS TO
FACILITATE THE PROMPT COMPLETION OF ALL ASPECTS OF THE
DEMOLITION RENOVATION PROJECTS.
6. SPECIAL CARE SHOULD BE TAKEN WHEN WORKING NEAR ELECTRIC,
WATER, STEAM AND GAS SUPPLY LINES.
7. ASBESTOS ABATEMENT CONTRACTOR MAY BE RESPONSIBLE FOR
REMOVING NON-ASBESTOS MATERIALS TO ACCESS ASBESTOS
CONTAINING AND OTHER HAZARDOUS MATERIALS INCLUDING BUT NOT
LIMITED TO, DROP CEILINGS, DRYWALL ENCLOSURES, ETC..
COORDINATE SELECTIVE DEMOLITION WITH THE DEMOLITION
CONTRACTOR.
8. DEPICTION OF EXISTING CONDITIONS BASED ON OWNER-FURNISHED
DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS
AND CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES
WERE NOT OBSERVED OR INVESTIGATED. ONCE CUTTING AND
SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS
TO DESIGNER. THE CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR
ALTERATIONS AS NECESSARY TO INSTALL COMPLETE AND OPERABLE
SYSTEMS IN ACCORDANCE WITH THE CODES HAVING JURISDICTION AT
NO ADDITIONAL COST TO THE GOVERNMENT.
9. CONTRACTOR TO DEVELOP AND PUBLISH SAFETY PLAN FOR
APPROVAL BY GOV. PRIOR TO BEGINNING THEIR WORK. PLAN TO
INCLUDE MEANS AND METHODS OF DEBRIS STAGING AND REMOVAL,
BOTH INTERNALLY AND EXTERNALLY.
10. COORDINATE ALL WORK AS SPECIFIED IN 02 82 00.
11. ALL ASBESTOS REMOVAL AREAS INDICATED ON THE PLANS AND
SPECIFICATIONS IS FOR INFORMATIONAL ASSISTANCE TO THE
CONTRACTOR. ALL MATERIALS MUST BE FIELD VERIFIED FOR SIZE AND
QUANTITIES. ROOFING MATERIALS WHICH HAVE ASBESTOS CONTAINING
MATERIALS (ACM) ARE PRESENT. THE CONTRACTOR SHALL REMOVE ALL
ACM ON SPECIFIED AREAS WHETHER OR NOT SHOWN OR ACCURATELY
INDICATED. THESE SPECIFICATIONS SHALL BE USED AS A GUIDE AND DO
NOT LIMIT THE CONTRACTORS RESPONSIBILITY TO SEEK AND REMOVE ALL
ACM AS SPECIFIED.
12. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL
ABATEMENT PROCEDURES. CONTRACTOR SHALL CONDUCT REMOVAL OF
ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND
PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING
PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC.,
THROUGHOUT THE BUILDINGS.
13. ALL ASBESTOS REMOVAL SHALL BE PERFORMED IN ACCORDANCE
WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS,
REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT
LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF SOUTH CAROLINA
AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY (USEPA), U.S.
DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA), NATIONAL INSTITUTE OF OCCUPATIONAL
SAFETY AND HEALTH (NIOSH), STATE OF SOUTH CAROLINA
DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL (SCDHEC).
14. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD
OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE
MAXIMUM PROTECTION AND SAFEGUARDS FOR ASBESTOS EXPOSURE
TO WORKERS, EMPLOYEES, GENERAL PUBLIC, AND THE ENVIRONMENT.
15. ASBESTOS MATERIALS IDENTIFIED IN THE CONSULTANT ASBESTOS
SURVEY REPORT DATED JUNE 1, 2020, MUST BE REMOVED PRIOR TO
ANY RENOVATION OR DEMOLITION ACTIVITIES MAKES NO CLAIMS AS
TO THEIR ACCURACY OR FOR QUANTITIES DERIVED THROUGH THEIR
USE.
16. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS AND
POSTED INSTRUCTIONS THAT ARE NECESSARY TO PROTECT, INFORM
AND WARN PEOPLE OF THE HAZARD FROM ASBESTOS EXPOSURE.
17. THE ASBESTOS ABATEMENT CONTRACTOR SHALL PREPARE THE WORK
AREA FOR REMOVAL IN ACCORDANCE WITH STATE OF SOUTH
CAROLINA DEPARTMENT OF HEALTH RULES AND ENVIRONMENTAL
CONTROL (SCDHEC), REGULATION 61.86.1 STANDARDS OF
PERFORMANCE FOR ASBESTOS PROJECTS.
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/4 /2
:4
:4
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
G-121
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
AS
BE
ST
O
S
AB
AT
EM
EN
T
R O
O F
PL
AN
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
1/8" = 1'-0"G-121
1 ASBESTOS ABATEMENT ROOF PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
34.36
34.11
33.52
33.70
FFE: 35.70'
34.36
34.11 33.52
33.70
34.34
SCO
SCO
34.78
(35)
(34)
(34)
(34)
(35)
(36)
(37)
(3 8)
34.8
35.5 36.5
36.5
34.5
35.5
35.5
36.5
49.47'
TGA 37.29
TGA 37.39
36.39 36.85
35.95
35.80
34.8
34.5
35.5
35.5
36.5
49.47'
TGA 37.29
TGA 37.39
36.39 36.85
35.95
35.80
0 10' 20'
N
VA
R
IE
S, S
EE
P
LA
N S
4" M
IN
(1) PVC CAP,
SIZE TO MATCH DRAIN
BASIN, DO NOT SOLVENT
WELD TO STRUCTURE
NOTES:
1. THE UNIFORMLY OPEN GRADED COARSE AGGREGATE
SHALL BE SIZE NO. 8 PER ASTM C 33 OR NO. 89 COARSE
AGGREGATE ( 3
64 TO 38-IN PER ASTM D448), SIMILAR IN SIZE
TO PEA GRAVEL.
2. THE UNIFORMLY OPEN GRADED COARSE AGGREGATE
SHALL HAVE FINE SAND AND SMALLER PARTICLES
REMOVED FROM THE STONE LAYER TO PROVIDE BETTER
PERMEABILITY AND A STORMWATER RUNOFF STONE
BASE RESERVOIR.
3. THE OPEN GRADED COARSE AGGREGATE SHALL
PROVIDE A MINIMUM VOID RATIO OF 0.40.
4. THE COARSE AGGREGATE SUBBASE LAYER SHALL BE IN
ACCORDANCE WITH THE SOUTH CAROLINA DEPARTMENT
OF TRANSPORTATION STANDARD SPECIFICATIONS,
LATEST EDITION, SECTION 305, GRADED AGGREGATE
BASE.
5. STRUCTURE SHALL BE SIMILAR TO NYLOPLAST STORM
DRAIN OR APPROVED EQUAL SYSTEM.
WATERTIGHT JOINT VARIABLE SUMP DEPTH
ACCORDING TO PLANS
(6" MIN. BASED ON
MANUFACTURING REQ.)
OUTLET ADAPTOR FOR
PERFORATED PVC PIPE
3 STORM DRAIN BASIN STRUCTURE
NTS
NOTES:
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
4 FRENCH DRAIN SYSTEM DETAIL
1/2" = 1'-0"
NON-WOVEN GEOTEXTILE FABRIC.
OVERLAP 6" AT TOP AND ALL SEAMS
18"
3"
6"
5' MIN
2%
6" METAL
LANDSCAPE
BARRIER
FA
CE
O F
BU
ILD
IN
G
1 EXISTING CONDITIONS PLAN
1" = 10'
2 DRAINAGE PLAN
1" = 10'
CIVIL KEYNOTES
KEY NOTE:
PROPOSED STRUCTURE #1
BUBBLE-UP STORM STRUCTURE W/ TYPE 1 FRAME, GRATE
AND HOOD
STRUCTURE #1:
A. SCDOT TYPE 1 (3'-6”X4')
B. GRATE EL = 34.00
C. INV EL = 32.20 (8" PVC-E)
PROPOSED 8” PVC STORM DRAIN PIPE, 37 LF @ 3% SLOPE
PROPOSED 8” PVC STORM DRAIN PIPE, 10 LF @ 3% SLOPE
PROPOSED 8” PVC 45-DEGREE BEND
PROPOSED 8” PVC 22.5-DEGREE BEND
PROPOSED 8” PERFORATED PVC PIPE, 7 LF @ 3% SLOPE
PROPOSED 8” PERFORATED PVC PIPE, 35 LF @ 3% SLOPE
PROPOSED 8” PVC 45-DEGREE BEND WITH 8"x8" PVC WYE
AND CLEANOUT
PROPOSED STRUCTURE #2
12” DIA STORM DRAIN BASIN,
INV EL = 33.95 (8" PVC-N&E)
SEE DETAIL 3 THIS SHEET
PROPOSED STRUCTURE #3
12” DIA STORM DRAIN BASIN,
INV EL = 35.00 (8" PVC-W)
SEE DETAIL 3 THIS SHEET
EXISTING 3.5'X10' CONCRETE LANDING
PROPOSED 5' WIDE GRAVEL FRENCH DRAIN SYSTEM, SEE
DETAIL 4
ROOF LEADER DOWNSPOUT CONNECTED TO STORM DRAIN
BASIN. 6" PVC PIPE, 3 LF @ 0.55% SLOPE
A. INV UP = 36.85
B. INV DOWN = 36.83
EXISTING RIPRAP, PROTECT
UNIFORMLY GRADED COARSE AGGREGATE
ROOF LEADER DOWNSPOUT CONNECTED TO STORM DRAIN
BASIN. 6" PVC PIPE, 3 LF @ 0.55% SLOPE
A. INV UP = 36.39
B. INV DOWN = 36.37
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
RE
V.
DE
SC
RI
PT
IO
N
PR
EP
B Y
DA
TE
AP
PR
'D
SEAL AREA
BU
LL
OC
K
TI
CE
A
SS
OC
IA
TE
S
9 E
AS
T
CE
RV
AN
TE
S
ST
RE
ET
PE
NS
AC
OL
A, F
L 3
DE
SIG
N B
Y:
DR
AW
N B
Y:
CH
EC
K B
Y:
CH
EN
G
DA
TE
SU
PV
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
CH
AR
LE
ST
ON
, S
C
JO
IN
T
BA
SE
C
HA
RL
ES
TO
N
IRA D
MANCOM
MO
IT Y
BIL
G
E W
BAIR AS
IN628TH
C-100
08 NOVEMBER 2021
DKFX 1098455/1073222
RE
PA
IR
F
AC
ILI
TY
E
NV
EL
OP
E, H
VA
C
RE
PA
IR
S, RO
OF
F
LIG
HT
S
IM
UL
AT
OR
, B .10
CI
VIL
PL
AN
S A
ND
D
ET
AIL
S
De sig ne r
Au tho r Ch ec ke r
DKFX 1098455/1073222
BUILDING 108
FFE = 35.70
BUILDING 108
FFE = 35.70
EXISTING
SWMF
EXISTING
SWMF
REFER TO SURVEY SHEET FOR EXISTING CONDITIONS LEGEND.
CIVIL LEGEND
STORM DRAIN PIPE
PERFORATED STORM PIPE
FRENCH DRAIN
EXISTING BUILDING
DOWNSPOUT, SEE ARCHITECTURAL
STORM DRAIN BASIN STRUCTURE
EXISTING SURFACE CONTOUR
NEW SURFACE CONTOUR34
(34)
DIRECTION OF SURFACE FLOW
EXIST. 18" RCP
EXIST. 18" RCP
NOTES:
1. DISTURBED AREAS SHALL BE SODDED WITH BERMUDA GRASS.
2. THE CONTRACTOR SHALL SUBMIT AN EROSION CONTROL PLAN FOR WORK DURING CONSTRUCTION, SIGNED AND
STAMPED BY A REGISTERED CIVIL ENGINEER PRIOR TO THE START OF CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF OR EROSION CONTROL
MEASURES CONTAINED WITHIN THE CONTRACT SPECIFICATIONS OR AS REQUIRED BY THE BASE OR OTHER REGULATORY AUTHORITY. THE CONTRACTOR SHALL ALSO PROVIDE ANY ADDITIONAL EROSION CONTROL MEASURES DICTATED BY FIELD CONDITIONS TO PREVENT EROSION OR THE INTRODUCTION OF DIRT OR DEBRIS INTO EXISTING WATERWAYS OR ONTO ADJACENT PROPERTIES DURING ANY PHASE OF CONSTRUCTION
OPERATIONS.
4. CONTRACTOR SHALL REGRADE DISTURBED AREAS WITHIN THE PROJECT TO PERPETUATE POSITIVE DRAINAGE TOWARD EXISTING NATURAL LOW POINTS AND/OR STORM STRUCTURES. EXISTING RUNOFF PATTERNS AND CONDITIONS OUTSIDE THE PROJECT LIMITS SHALL NOT BE CHANGED WITHOUT PRIOR APPROVAL OF THE ENGINEER
OF RECORD AND BASE COR.
0 10' 20'
N
TOS 36.09
TOS 36.28 TOS 36.09
TOS 35.90
36.5 NEW SPOT ELEVATION
TOP OF CONCRETE SLAB ELEVATION (EXISTING)TOS 36.28
STRUCTURE BACKFILL OR
COARSE AGGREGATE
MATERIAL
NOTES:
1. THE UNIFORMLY OPEN GRADED COARSE AGGREGATE SHALL BE SIZE NO. 8 PER
ASTM C 33 OR NO. 89 COARSE AGGREGATE ( 3
64 TO 38-IN PER ASTM D448), SIMILAR IN
SIZE TO PEA GRAVEL.
2. THE UNIFORMLY OPEN GRADED COARSE AGGREGATE SHALL HAVE FINE SAND AND
SMALLER PARTICLES REMOVED FROM THE STONE LAYER TO PROVIDE BETTER
PERMEABILITY AND A STORMWATER RUNOFF STONE BASE RESERVOIR.
3. THE OPEN GRADED COARSE AGGREGATE SHALL PROVIDE A MINIMUM VOID RATIO
OF 0.40.
4. THE COARSE AGGREGATE SUBBASE LAYER SHALL BE IN ACCORDANCE WITH THE
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS, LATEST EDITION, SECTION 305, GRADED AGGREGATE BASE.
UNIFORMLY GRADED COARSE
AGGREGATE
34.34 EXISTING SPOT ELEVATION
INV = 32.51
OUTLET ADAPTOR
FOR ROOF LEADER
1.
0.
Ø 7.85"
Ø 9.85"
STORM DRAIN BASIN STRUCTURE
CASTING DETAIL STORM DRAIN BASIN STRUCTURE
SECTION VIEW
8" YARD DRAIN
STRUCTURE BACKFILL OR
COARSE AGGREGATE
MATERIAL
FINISH GRADE
8" PVC TO STORM
DRAIN COLLECTION
SYSTEM
NTS
NTS
5 ENLARGED DRAINAGE PLAN
1" = 5'
0 5' 10'
N
INV = 32.51
INV = 32.51
36.39 EXISTING GROUND ELEVATION
TOP OF GRADED COARSE AGGREGATE ELEVATIONTGA 36.28
C-100
ENLARGED DRAINAGE PLAN
DIRECTION OF PIPE FLOW
6 80
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHOLORIDE
R RADIUS, RANGE, RISER
RCP REFLECTED CEILING PLAN
RD REINFORCING STEEL BARS REBAR
REF REFERENCE, REFRIGERATOR
REG REGISTER
REINF REINFORCE
RET RETURN
REV REVISION
RH RIGHT HAND
RM ROOM
ROW RIGHT OF WAY
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FOOT(FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TE TOP ELEVATION
TEL TELEPHONE
TOC TOP OF CONCRETE
TOS TOP OF SLAB, TOP OF STEEL
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VTR VENT THROUGH ROOF
W WASHER, WEST, WIDE
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WATERPROOFING
WSCT WAINSCOT
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
BD BOARD
BLDG BUILDING
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BUR BUILT-UP ROOFING
CF/CI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CF/GI CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CID COMPREHENSIVE INTERIOR
DESIGN PACKAGE
CIP CAST-IN-PLACE, CAST IRON PIPE
CJ CONSTRUCTION JOINT/CONTROL
JOINT
CL CENTER LINE, CLASS, CLOSE
CLG CEILING
CLR CLEAR, COLOR, COOLER
CMU CONCRETE MASONRY UNIT
CPT CARPET
COL COLUMN
CONC CONCRETE
CONT CONTINUE, CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
COTR CONTRACTING OFFICER
TECHNICAL REPRESENTATIVE
CU FT CUBIC FEET
CU YD CUBIC YARD
D DRYER
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWS EYE WASH STATION
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FIN GR FINISH GRADE
FLR FLOOR
FP FIREPROOF
FT FEET, FOOT
FTG FOOTING
GA GAGE
GALV GALVANIZED IRON
GB GRAB BAR
GC GENERAL CONTRACTOR
GF/GI GOVERNMENT FURNISHED/
GOVERNMENT INSTALLED
GF/CI GOVERNMENT FURNISHED/
CONTRACTOR INSTALLED
GL GLASS
GLZ GLAZING
GMS GALVANIZED METAL STUD
GYP BD GYPSUM BOARD
HB HOSE BIBB
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATING/AIR COND
IBC INTERNATIONAL BUILDING CODE
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MS MOP SINK
MT MOUNT
MTD MOUNTED
MTG MEETING
MTL METAL
MW MICROWAVE
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OF/OI OWNER FURNISH/
OWNER INSTALLED
OF/CI OWNER FURNISH/
CONTRACTOR INSTALLED
OH OVERHANG, OVERHEAD
OH DR OVERHEAD (COILING) DOOR
OPNG OPENING
OPP OPPOSITE
PCF POUNDS PER CUBIC FOOT
ABBREVIATIONS
ROOM NAME / NUMBER
DESIGNATION
DOOR NUMBER
WINDOW / LOUVER
TYPE
WALL TYPE
ELEVATION
TARGET
ELEVATION NUMBER
INTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION NUMBER
EXTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
NORTH ARROW
SECTION NUMBER
SECTION SYMBOL
SHEET ON WHICH
SECTION IS DRAWN
DETAIL NUMBER
DETAIL SYMBOL
SHEET ON WHICH
DETAIL IS DRAWN
PLAN
NORTH
A101
SIM
A
A
4 A-200
ROOM NAME
A-201
PLAN NORTH
TRUE NORTH A-201
SYMBOLS LEGEND
GENERAL NOTES
1. THE CONTRACTOR MUST VISIT THE SITE TO OBSERVE ACTUAL
CONDITIONS AND ASSESS THE FULL SCOPE OF THE PROJECT PRIOR TO
EXECUTING THE CONTRACT.
2. THE CONTRACTOR SHALL VERIFY THE PROPOSED SCOPE OF WORK
(INCLUDING DIMENSIONS, LAYOUT, ETC.) PRIOR TO INITIATING THE
IMPROVEMENTS IDENTIFIED WITHIN THESE DOCUMENTS. SHOULD ANY
DISCREPANCY BETWEEN THE EXISTING SITE CONDITIONS AND THE
PROPOSED WORK BE FOUND, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER REPRESENTATIVE PRIOR TO THE START OF
CONSTRUCTION.
3. BUILDING 108 WILL REMAIN IN OPERATION THROUGHOUT ENTIRE
CONSTRUCTION PROCESS.
4. CONTRACTOR MUST COORDINATE WITH CONTRACTING OFFICER
REPRESENTATIVE (C.O.R.) FOR AFTER BUILDING HOURS CONSTRUCTION.
5. A PROTECTIVE SEALED ENVELOPE BETWEEN ACTIVE/INACTIVE
CONSTRUCTION AREAS DURING EACH PHASE MUST BE PROVIDED.
6. A CLEAN UNOBSTRUCTIVE PATH TO THE AREA OF WORK MUST BE
MAINTAINED AT ALL TIMES.
7. SUPPORT UTILITY SYSTEMS WILL BE MAINTAINED AT ALL HOURS OF
OPERATION. ANY NECESSARY INTERRUPTION MUST BE AUTHORIZED WITH
THE CONTRACTING OFFICER REPRESENTATIVE.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND ENSURE
THAT ALL REQUIRED APPROVALS HAVE BEEN OBTAINED PRIOR TO THE
START OF CONSTRUCTION. COPIES OF ALL REQUIRED PERMITS AND
APPROVALS SHALL BE KEPT ON-SITE AT ALL TIMES DURING
CONSTRUCTION.
9. THE CONTRACTOR IS RESPONSIBLE TO RESTORE ANY DAMAGED OR
UNDERMINED BUILDING SYSTEM THAT ARE IDENTIFIED TO REMAIN. ALL
REPAIRS SHALL USE NEW MATERIALS TO RESTORE THE FEATURE TO ITS
EXISTING CONDITION AT THE CONTRACTOR'S EXPENSE.
10. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES AND
OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT THE
GOVERNMENT PERSONNEL, OCCUPANTS, AND OFFICIAL VISITORS FROM
INJURY DUE TO WORK.
11. ANY EXISTING MECHANICAL OR ELECTRICAL DEVICES, OR EQUIPMENT
AFFECTED BY ANY RENOVATION AND NOT CALLED FOR TO BE REMOVED
OR DISCONNECTED, SHALL BE RESTORED AND LEFT IN FULL OPERATING
CONDITION.
12. EXISTING FURNITURE AND EQUIPMENT IN AREAS REQUIRING CEILING
WORK MUST BE COVERED AND PROTECTED BY THE CONTRACTOR
DURING CONSTRUCTION.
13. CONDITIONS AS SHOWN ARE BASED ON AS-BUILT DRAWINGS PROVIDED
BY THE GOVERNMENT AND LIMITED FIELD INVESTIGATION. THE
CONTRACTOR SHALL REPORT ANY DISCREPANCIES BETWEEN
CONDITIONS SHOWN ON DRAWINGS AND FIELD CONDITIONS TO THE COR
PRIOR TO PROCEEDING WITH CONSTRUCTION.
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/5 /2
:2
:4
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
A-001
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
LE
G
EN
D
, N O
TE
S, A
BB
R
EV
IA
TI
O
N S
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
A-101
A-102
A-103
A-104
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/5 /2
:2
:4
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
A-100
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
O
VE
R
AL
L
FL
O O
R P
LA
N
S -E
XI
ST
IN
G
D
EM
O
LI
TI
O N
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
1/16" = 1'-0"A-100
1 FIRST FLOOR EXISTING / DEMOLITION PLAN OVERALL
1/16" = 1'-0"A-100
2 SECOND FLOOR EXISTING / DEMOLITION PLAN OVERALL
SCALE: 1/16" = 1'-0"
0 8' 16' 32'
PLAN
NORTH
CSSR
STAIR
S4
SIMULATOR BAY
4 (WST-21)
LS ROOM
ELEC.
STAIR
S3
COMPUTER
ROOM
STOR.
ELEV EQUIP.
CORRIDOR
C6
BRIEFING ROOM
COMPUTER
ROOM
SIMULATOR BAY
3 (WST-9)
COMM.
CORRIDOR
C5
WOMEN
MEN
ELEV.
E2
HYDRAULIC
ROOM
INSTRUCTORS
OFFICE
WSTLS
134 CORRIDOR
C4
CORRIDOR
C3
BREAK
BRIEFING ROOM
STOR.
M A
T C
H
LI
N E
1/
A -1
M
A T
C H
LI
N
E
1/ A
-1
OPEN TO ABOVE
OPEN TO ABOVE
D4
D1 D2
D4
D4
D4
D4
D4
D4
D4
D5
D5
D4
D4
D4
D4
D4
D4
D4
D1
D2
D1
D2
D3
D3
D4
D1 D2
D1 D2
DEMOLITION SHEET NOTES
D1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID IN ITS
ENTIRETY.
D2 EXISTING CEILING MOUNTED DEVICES TO REMAIN, ENSURE ALL
DEVICES ARE REMOVED AND STORED FOR RE-INSTALLATION. SEE
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION FOR ADDITIONAL
REQUIREMENTS.
D3 EXISTING GYPSUM BOARD CEILING TO REMAIN. REMOVE ANY DAMAGED
PORTIONS AND REPLACE. CEILING TO BE REPAIRED TO A LIKE NEW
CONDITION.
D4 EXISTING ACOUSTICAL CEILING TILE TO REMAIN. ENSURE CEILING
REMAINS PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL
REPLACE ANY TILES DAMAGED DUE TO CONSTRUCTION. SEE
RELFECTED CEILING PLANS A-151 TO A-154 FOR ANY LOCATIONS OF
TILE REPLACEMENT.
D5 REMOVE EXISTING PRE FINISHED METAL SOFFIT PANELS.
D6 REMOVE EXISTING GYPSUM BOARD CEILING.
D7 EXISTING LOUVER TO BE REMOVED AND STORED FOR
REMOVAL/INSTALLATION OF NEW HVAC EQUIPMENT. CONTRACTOR IS
RESPONSIBLE FOR INSTALLING A TEMPORARY MEANS OF CLOSING AREA
OFF AREA DURING CONSTRUCTION. LOUVER TO BE REINSTALLED ONCE
WORK TO MECHANICAL ROOM HAS BEEN COMPLETED. A SECURE
PERIMETER SHALL BE MAINTANED DURING CONSTRUCTION IN THIS
AREA. COORDINATE WITH COR TO MAKE ROOM SECURE PRIOR TO
REMOVING PANEL.
D8 REMOVE EXISTING BATT INSULATION INSTALLED ABOVE EXISTING
CEILING.
D9 EXISTING GYPSUM BOARD CEILING TO REMAIN.
D10 EXISTING BRIDGE CRANE TO REMAIN. ENSURE BRIDGE CRANE REMAINS
PROTECTED DURING CONSTRUCTION. STOP 6" SHORT OF BRIDGE CRANE
SUPPORT MEMBERS IF GYPSUM BOARD REMOVAL IS REQUIRED.
GENERAL NOTES
1. THE WORK IDENTIFIED ON THE DEMOLITION PLAN PROVIDES GENERAL
INFORMATION ON THE EXISTING FEATURES TO BE DEMOLISHED AND/OR
REMOVED.
2. VERIFY ALL CONDITIONS TO BE REMOVED BEFORE PROCEEDING WITH THE
DEMOLITION WORK.
3. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE THE MEANS AND
METHODS OF DEMOLITION ACTIVITIES.
4. ALL WASTE/DEBRIS GENERATED FROM DEMOLITION ACTIVITIES SHALL BE
DISPOSED PER LOCAL, STATE, AND FEDERAL REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL RECORDS OF THE
DISPOSAL TO DEMONSTRATE COMPLIANCE WITH THE ABOVE REGULATIONS.
5. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, DAMAGES
CAUSED TO ADJACENT AREAS BY DEMOLITION WORK.
6. PATCHING AND PAINTING OF EXISTING STUD WALLS AND GYPSUM
WALLBOARD TO REMAIN DUE TO DAMAGE FROM CONSTRUCTION SHALL
ALSO BE INCLUDED IN SCOPE OF WORK.
7. REFER TO ELECTRICAL, MECHANICAL, AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL DEMOLITION REQUIREMENTS.
8. ANY PORTION OF BUILDING DAMAGED DURING CONSTRUCTION OF NEW
DUCTWORK, PIPING, CONDUIT, ETC. SHALL BE REPAIRED BY THE
CONTRACTOR.
9. FLIGHT SIMULATOR EQUIPMENT SHALL BE COVERED IN PROTECTIVE
SHRINKWRAP PLASTIC PRIOR TO ANY CONSTRUCTION WORK IN EACH
SIMULATOR BAY. REMOVE ALL DUST AND DEBRIS FROM PRIOR TO REMOVAL
OF SHRINK WRAP.
10. TENANT REQUIRES AT LEAST 45 DAYS NOTICE PRIOR TO ANY WORK IN THE
SIMULATOR BAYS, COMPUTER ROOMS, LS ROOM, ROOM 145, WSTLS ROOM
134, OR VTRAT ROOM (ROOMS 211 AND 213). ONLY ONE SIMULATOR AND
RELATED COMPUTER ROOM CAN BE TAKEN DOWN AT A TIME. ONLY ONE OF
EITHER THE LS ROOM, ROOM 145 OR WSTLS ROOM 134 CAN BE TAKEN OUT
OF SERVICE FOR CONSTRUCTION AT ANY TIME.
11. THE CONTRACTOR SHALL INSURE ALL EGRESS PATHS ARE INTACT PRIOR
TO CONSTRUCTION. IF A PORTION OF CONSTRUCTION THAT MAY
COMPROMISE LIFE SAFETY SHALL BE COORDINATED WITH THE
GOVERNMENT PRIOR TO START OF CONSTRUCTION.
12. EXISTING FURNITURE AND EQUIPMENT IN AREAS REQUIRING CEILING WORK
MUST BE COVERED AND PROTECTED BY THE CONTRACTOR DURING
CONSTRUCTION. ANY REMOVAL OF FURNITURE IF REQUIRED, SHALL BE
COORDINATED WITH THE GOVERNMENT PRIOR TO START OF ANY WORK.
GRAPHIC LEGEND
EXISTING SUSPENDED GYPSUM BOARD CEILING (PAINTED)
TO BE REMOVED
EXISTING 2' X 2' SUSPENDED ACOUSTICAL TILE LAY-IN
CEILING WITH GRID TO BE REMOVED
D1 SHEET NOTE
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/5 /2
:2
:4
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
A-101
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
C
EI
LI
N
G P
LA
N
W
ES
T
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
1/8" = 1'-0"A-101
1 FIRST FLOOR DEMOLITION CEILING PLAN - WEST
HYDRAULIC
ROOM
SIMULATOR BAY
2 (WST-1)
COMPUTER
ROOM
COMPUTER
ROOM
SIMULATOR BAY
1 (WST-2)
HYDRAULIC
ROOM
CORRIDOR
C9
MAINTENANCE
PARTS
STOR.
WOMEN
136A
MEN
136B
JAN.
STOR.
STAIR
S2
MECH
ELEC.
PUMP ROOM
OFFICE
OFFICE
COMM.
VESTIBULE
ELEV.
E1
STAIR
S1
MECHANICAL
COMMUNICATIONS
STORAGE
MENS
WOMENS
CORRIDOR
C1
OFFICE
OFFICE
108OLD SIM BAY
OFFICE
SITE MANAGE
M A
T C
H
LI
N E
1/
A -1
M
A T
C H
LI
N
E
1/ A
-1
OPEN TO ABOVE
OPEN TO ABOVE
OPEN TO ABOVE
SECURE
VESTIBULE
ELEV LOBBY
JANITOR
ELECTRICAL
CORRIDOR
C2
D9
D4
D4
D4
D4 D4
D4
D4
D4
D4
D4
D4
D4
D4
D4
D4D4
D4
D4 D4
D4
D4
D4
D4
D1
D2
D5
D5
D5
D2
SECURE AREA
NON-SECURE AREA
OFFICE
BRIEFING ROOM
CORRIDOR
C3
D1
D2
D1
D2
D1
D2
D1
D2
D1 D2
D6
D1
D2
D1
D2
D1
D2
D1 D2
D2 D6
D1 D2
D1 D2
D3
D3
D3
D4
D3
D1
D2
DEMOLITION SHEET NOTES
D1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID IN ITS
ENTIRETY.
D2 EXISTING CEILING MOUNTED DEVICES TO REMAIN, ENSURE ALL
DEVICES ARE REMOVED AND STORED FOR RE-INSTALLATION. SEE
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION FOR ADDITIONAL
REQUIREMENTS.
D3 EXISTING GYPSUM BOARD CEILING TO REMAIN. REMOVE ANY DAMAGED
PORTIONS AND REPLACE. CEILING TO BE REPAIRED TO A LIKE NEW
CONDITION.
D4 EXISTING ACOUSTICAL CEILING TILE TO REMAIN. ENSURE CEILING
REMAINS PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL
REPLACE ANY TILES DAMAGED DUE TO CONSTRUCTION. SEE
RELFECTED CEILING PLANS A-151 TO A-154 FOR ANY LOCATIONS OF
TILE REPLACEMENT.
D5 REMOVE EXISTING PRE FINISHED METAL SOFFIT PANELS.
D6 REMOVE EXISTING GYPSUM BOARD CEILING.
D7 EXISTING LOUVER TO BE REMOVED AND STORED FOR
REMOVAL/INSTALLATION OF NEW HVAC EQUIPMENT. CONTRACTOR IS
RESPONSIBLE FOR INSTALLING A TEMPORARY MEANS OF CLOSING AREA
OFF AREA DURING CONSTRUCTION. LOUVER TO BE REINSTALLED ONCE
WORK TO MECHANICAL ROOM HAS BEEN COMPLETED. A SECURE
PERIMETER SHALL BE MAINTANED DURING CONSTRUCTION IN THIS
AREA. COORDINATE WITH COR TO MAKE ROOM SECURE PRIOR TO
REMOVING PANEL.
D8 REMOVE EXISTING BATT INSULATION INSTALLED ABOVE EXISTING
CEILING.
D9 EXISTING GYPSUM BOARD CEILING TO REMAIN.
D10 EXISTING BRIDGE CRANE TO REMAIN. ENSURE BRIDGE CRANE REMAINS
PROTECTED DURING CONSTRUCTION. STOP 6" SHORT OF BRIDGE CRANE
SUPPORT MEMBERS IF GYPSUM BOARD REMOVAL IS REQUIRED.
GENERAL NOTES
1. THE WORK IDENTIFIED ON THE DEMOLITION PLAN PROVIDES GENERAL
INFORMATION ON THE EXISTING FEATURES TO BE DEMOLISHED AND/OR
REMOVED.
2. VERIFY ALL CONDITIONS TO BE REMOVED BEFORE PROCEEDING WITH THE
DEMOLITION WORK.
3. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE THE MEANS AND
METHODS OF DEMOLITION ACTIVITIES.
4. ALL WASTE/DEBRIS GENERATED FROM DEMOLITION ACTIVITIES SHALL BE
DISPOSED PER LOCAL, STATE, AND FEDERAL REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL RECORDS OF THE
DISPOSAL TO DEMONSTRATE COMPLIANCE WITH THE ABOVE REGULATIONS.
5. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, DAMAGES
CAUSED TO ADJACENT AREAS BY DEMOLITION WORK.
6. PATCHING AND PAINTING OF EXISTING STUD WALLS AND GYPSUM
WALLBOARD TO REMAIN DUE TO DAMAGE FROM CONSTRUCTION SHALL
ALSO BE INCLUDED IN SCOPE OF WORK.
7. REFER TO ELECTRICAL, MECHANICAL, AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL DEMOLITION REQUIREMENTS.
8. ANY PORTION OF BUILDING DAMAGED DURING CONSTRUCTION OF NEW
DUCTWORK, PIPING, CONDUIT, ETC. SHALL BE REPAIRED BY THE
CONTRACTOR.
9. FLIGHT SIMULATOR EQUIPMENT SHALL BE COVERED IN PROTECTIVE
SHRINKWRAP PLASTIC PRIOR TO ANY CONSTRUCTION WORK IN EACH
SIMULATOR BAY. REMOVE ALL DUST AND DEBRIS FROM PRIOR TO REMOVAL
OF SHRINK WRAP.
10. TENANT REQUIRES AT LEAST 45 DAYS NOTICE PRIOR TO ANY WORK IN THE
SIMULATOR BAYS, COMPUTER ROOMS, LS ROOM, ROOM 145, WSTLS ROOM
134, OR VTRAT ROOM (ROOMS 211 AND 213). ONLY ONE SIMULATOR AND
RELATED COMPUTER ROOM CAN BE TAKEN DOWN AT A TIME. ONLY ONE OF
EITHER THE LS ROOM, ROOM 145 OR WSTLS ROOM 134 CAN BE TAKEN OUT
OF SERVICE FOR CONSTRUCTION AT ANY TIME.
11. THE CONTRACTOR SHALL INSURE ALL EGRESS PATHS ARE INTACT PRIOR
TO CONSTRUCTION. IF A PORTION OF CONSTRUCTION THAT MAY
COMPROMISE LIFE SAFETY SHALL BE COORDINATED WITH THE
GOVERNMENT PRIOR TO START OF CONSTRUCTION.
12. EXISTING FURNITURE AND EQUIPMENT IN AREAS REQUIRING CEILING WORK
MUST BE COVERED AND PROTECTED BY THE CONTRACTOR DURING
CONSTRUCTION. ANY REMOVAL OF FURNITURE IF REQUIRED, SHALL BE
COORDINATED WITH THE GOVERNMENT PRIOR TO START OF ANY WORK.
GRAPHIC LEGEND
EXISTING SUSPENDED GYPSUM BOARD CEILING (PAINTED)
TO BE REMOVED
EXISTING 2' X 2' SUSPENDED ACOUSTICAL TILE LAY-IN
CEILING WITH GRID TO BE REMOVED
D1 SHEET NOTE
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
TE
S
ST
R
EE
T
PE
N
SA
C
O
LA
, F L
D
ES
IG
N
B Y:
D R
AW
N
B Y:
C H
EC
K
BY
C H
E N
G
D
AT
E
SU
PV
D
EP
AR
TM
EN
T
O F
TH
E
AI
R
F O
R C
E
AI
R M
O
BI
LI
TY
C O
M M
AN
D
C H
AR
LE
ST
O
N , S
C
JO
IN
T B
A S
E C
H A
R
LE
S T
O N
11-08-2021
/5 /2
:2
:5
P M
D
R
V T
\P ro je c ts
\1
-2
J B
C h a rl e s to n
B
R e n o k a
.w h it e b u llt ic e .c o m
.r v t
A-102
08 NOVEMBER 2021
DKFX 1098455/1073222
R E
P A
IR
F
A C
IL
IT
Y E
N V
E
LO
P E
, H V
A C
R E
P A
IR
S
R
O O
F F
LI
G
H T
S
IM
U
LA
T O
R , B
.1
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
C
EI
LI
N
G P
LA
N
EA
ST
K.
W
H
IT
E K.
W H
IT
E
D . A
R R
IA
G
A
DKFX 1098455/1073222
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
1/8" = 1'-0"A-102
1 FIRST FLOOR DEMOLITION CEILING PLAN - EAST
STAIR
S4
SIMULATOR BAY
4 (WST-21)
STAIR
S3
SIMULATOR BAY
3 (WST-9)
ELEV.
E2
WEAPONS
SYSTEM TRAINER
LS BRIEFING
ROOM
WEAPONS
SYSTEM TRAINER
LS BRIEFING
ROOM
WOMEN
MEN
JAN.
CORRIDOR
C8
MECH.
MECH.
INSTRUCTORS
OFFICE
CLASS. VIEWING
CLASS. VIEWING
CLASS. STORAGE
M A
T C
H
LI
N E
1/
A -1
M
A T
C H
LI
N
E
1/ A
-1
D1
D1D1
D2
D2D2
D6
D4
D4
D4
D4
D4
D4
D4
D4D4
D4 D4
D5
D5
D5
D5
D5
D5
D5
D5 D5
D5
D5
D5
D7
D3
D4
D9
D9
D9
D9
D1 D2
D8
D10
D10
D9 D9
D9
D9
DEMOLITION SHEET NOTES
D1 REMOVE EXISTING ACOUSTICAL CEILING TILE AND GRID IN ITS
ENTIRETY.
D2 EXISTING CEILING MOUNTED DEVICES TO REMAIN, ENSURE ALL
DEVICES ARE REMOVED AND STORED FOR RE-INSTALLATION. SEE
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION FOR ADDITIONAL
REQUIREMENTS.
D3 EXISTING GYPSUM BOARD CEILING TO REMAIN. REMOVE ANY DAMAGED
PORTIONS AND REPLACE. CEILING TO BE REPAIRED TO A LIKE NEW
CONDITION.
D4 EXISTING ACOUSTICAL CEILING TILE TO REMAIN. ENSURE CEILING
REMAINS PROTECTED DURING CONSTRUCTION. CONTRACTOR SHALL
REPLACE ANY TILES DAMAGED DUE TO CONSTRUCTION. SEE
RELFECTED CEILING PLANS A-151 TO A-154 FOR ANY LOCATIONS OF
TILE REPLACEMENT.
D5 REMOVE EXISTING PRE FINISHED METAL SOFFIT PANELS.
D6 REMOVE EXISTING GYPSUM BOARD CEILING.
D7 EXISTING LOUVER TO BE REMOVED AND STORED FOR
REMOVAL/INSTALLATION OF NEW HVAC EQUIPMENT. CONTRACTOR IS
RESPONSIBLE FOR INSTALLING A TEMPORARY MEANS OF CLOSING AREA
OFF AREA DURING CONSTRUCTION. LOUVER TO BE REINSTALLED ONCE
WORK TO MECHANICAL ROOM HAS BEEN COMPLETED. A SECURE
PERIMETER SHALL BE MAINTANED DURING CONSTRUCTION IN THIS
AREA. COORDINATE WITH COR TO MAKE ROOM SECURE PRIOR TO
REMOVING PANEL.
D8 REMOVE EXISTING BATT INSULATION INSTALLED ABOVE EXISTING
CEILING.
D9 EXISTING GYPSUM BOARD CEILING TO REMAIN.
D10 EXISTING BRIDGE CRANE TO REMAIN. ENSURE BRIDGE CRANE REMAINS
PROTECTED DURING CONSTRUCTION. STOP 6" SHORT OF BRIDGE CRANE
SUPPORT MEMBERS IF GYPSUM BOARD REMOVAL IS REQUIRED.
GENERAL NOTES
1. THE WORK IDENTIFIED ON THE DEMOLITION PLAN PROVIDES GENERAL
INFORMATION ON THE EXISTING FEATURES TO BE DEMOLISHED AND/OR
REMOVED.
2. VERIFY ALL CONDITIONS TO BE REMOVED BEFORE PROCEEDING WITH THE
DEMOLITION WORK.
3. THE CONTRACTOR IS RESPONSIBLE TO DETERMINE THE MEANS AND
METHODS OF DEMOLITION ACTIVITIES.
4. ALL WASTE/DEBRIS GENERATED FROM DEMOLITION ACTIVITIES SHALL BE
DISPOSED PER LOCAL, STATE, AND FEDERAL REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL RECORDS OF THE
DISPOSAL TO DEMONSTRATE COMPLIANCE WITH THE ABOVE REGULATIONS.
5. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, DAMAGES
CAUSED TO ADJACENT AREAS BY DEMOLITION WORK.
6. PATCHING AND PAINTING OF EXISTING STUD WALLS AND GYPSUM
WALLBOARD TO REMAIN DUE TO DAMAGE FROM CONSTRUCTION SHALL
ALSO BE INCLUDED IN SCOPE OF WORK.
7. REFER TO ELECTRICAL, MECHANICAL, AND FIRE PROTECTION DRAWINGS
FOR ADDITIONAL DEMOLITION REQUIREMENTS.
8. ANY PORTION OF BUILDING DAMAGED DURING CONSTRUCTION OF NEW
DUCTWORK, PIPING, CONDUIT, ETC. SHALL BE REPAIRED BY THE
CONTRACTOR.
9. FLIGHT SIMULATOR EQUIPMENT SHALL BE COVERED IN PROTECTIVE
SHRINKWRAP PLASTIC PRIOR TO ANY CONSTRUCTION WORK IN EACH
SIMULATOR BAY. REMOVE ALL DUST AND DEBRIS FROM PRIOR TO REMOVAL
OF SHRINK WRAP.
10. TENANT REQUIRES AT LEAST 45 DAYS NOTICE PRIOR TO ANY WORK IN THE
SIMULATOR BAYS, COMPUTER ROOMS, LS ROOM, ROOM 145, WSTLS ROOM
134, OR VTRAT ROOM (ROOMS 211 AND 213). ONLY ONE SIMULATOR AND
RELATED COMPUTER ROOM CAN BE TAKEN DOWN AT A TIME. ONLY ONE OF
EITHER THE LS ROOM, ROOM 145 OR WSTLS ROOM 134 CAN BE TAKEN OUT
OF SERVICE FOR CONSTRUCTION AT ANY TIME.
11. THE CONTRACTOR SHALL INSURE ALL EGRESS PATHS ARE INTACT PRIOR
TO CONSTRUCTION. IF A PORTION OF CONSTRUCTION THAT MAY
COMPROMISE LIFE SAFETY SHALL BE COORDINATED WITH THE
GOVERNMENT PRIOR TO START OF CONSTRUCTION.
12. EXISTING FURNITURE AND EQUIPMENT IN AREAS REQUIRING CEILING WORK
MUST BE COVERED AND PROTECTED BY THE CONTRACTOR DURING
CONSTRUCTION. ANY REMOVAL OF FURNITURE IF REQUIRED, SHALL BE
COORDINATED WITH THE GOVERNMENT PRIOR TO START OF ANY WORK.
GRAPHIC LEGEND
EXISTING SUSPENDED GYPSUM BOARD CEILING (PAINTED)
TO BE REMOVED
EXISTING 2' X 2' SUSPENDED ACOUSTICAL TILE LAY-IN
CEILING WITH GRID TO BE REMOVED
D1 SHEET NOTE
AR94997
DERETSI
G
E R
A R C H
IT
E C
T
FOETAT
S
FL O R ID
A
R ICE
ACREBO
R
R LT
IR
A
D
MAN
CO
M
MO
IT Y
B I L
G
E W
B
A IR AS
I N 62 8T H
SHEET OF
RECORD DRAWING DATE
PROJECT NO.
DRAWING SIZE ARCH E(30X42)
R
EV
D
ES
C
R
IP
TI
O
N
PR
EP
B
Y D
AT
E
AP
PR
'D
SEAL AREA
BU
LL
O C
K
TI
C E
AS
SO
C
IA
TE
S
EA
ST
C
ER
VA
N
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .