PROJECT NUMBER
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
1 01 30 00, Para 1.2.1, "List of contact personnel"; G 5
2 01 32 01.00 10, Para 1.2, "Construction Schedule"; G 5
01 32 01.00 10, Para 1.3, "Equipment Delivery Schedule"; G
4 01 33 00, Para 1.7, "Submittal register"; G 5
5 01 35 13, Para 3.1.2, "Heavy Equipment and Vehicle List" 5
6 01 35 13, Para 3.1.2, "Existing Conditions Survey" 5
01 35 13, Para 3.1.2, "Construction Operations Plan"
01 35 13 Para 3 1 2 "Safety
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
AN
CE
DA
TA
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
TI
ON
SU
BM
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
8 01 35 13, Para 3.1.2, "Safety Plan" 5
9 01 35 13, Para 3.1.2, "Schedule of Work" 5
10 01 35 13, Para 3.1.2, "Pavement Protection Plan" 5
11 01 35 13, Para 3.1.7, "Pavement Protection Plan" 5
01 35 13, Para 3.1.12, "Notice of Proposed Construction or Alteration (Form 7460-1)"
01 35 13, Para 3.1.12, "FAA Determination of Form 7460- 1"
01 35 13, Para 3.1.12, "Notice of Actual Construction or Alteration (Form 7460-2)"
01 35 29, Para 1.6, "Accident Prevention Plan
(APP)"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
16 01 35 29, Para 1.7, "Activity Hazard Analysis (AHA)"; G 5
17 01 35 29, Para 1.11, "Reports" 5
18 01 35 29, Para 1.11.1, "Accident Reports" 5
19 01 35 29, Para 1.11.3, "Monthly Exposure Reports" 5
01 35 29, Para 1.8, "Confined Space Entry Permit"
21 01 35 29, Para 1.8, "Hot work permit" 5
01 45 00.00 20, Para 1.6.1, "Construction Quality Control (QC) Plan"; G
23 01 50 02.00 10, Para 2.1, "Backflow Preventers" 523 "Backflow Preventers" 5
24 01 50 02.00 10, Para 3.3, "Backflow Preventer Tests" 5
25 01 50 02.00 10, Para 1.5, "Backflow Tester" 5
01 50 02.00 10, Para 2.1, "Backflow Preventer Certificate"
01 57 19.00 20, Para 3.1, "Environmental Protection Plan"
28 01 57 19.00 20, Para 3.8.1, "Dirt and Dust Control Plan" 5
29 01 57 19.00 20, Para 3.3.1, "Laboratory Analysis" 5
30 01 57 19.00 20, Para 1.6.1, "Preconstruction Survey" 5
01 57 19.00 20, Para 3.6.1, "Solid Waste Disposal Permit"
01 57 19.00 20, Para 3.3, "Waste Determination Documentation"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
01 57 19.00 20, Para 3.7.4.1, "Disposal Documentation for Hazardous and Regulated Waste"
01 57 19.00 20, Para 1.6.3, "Contractor 40 CFR Employee Training Records"
35 01 57 19.00 20, Para 1.6.2, "Regulatory Notification" 5
01 57 19.00 20, Para 3.2.4, "Erosion and Sediment Control Inspection Reports"
01 57 19.00 20, Para 3.6.2, "Solid Waste Disposal Report"
01 57 20 Para 1 4 1
01 57 20, Para 1.4.1, "Material Safety Data Sheet
(MSDS)"
39 01 57 20, Para 1.8, "Monthly Green Procurement" 5
40 01 57 20, Para 1.8, "Annual Green Procurement" 5
41 01 57 20, Para 1.3, "Monthly Recycling Report" 5
42 01 57 20, Para 1.3, "Annual Recycling Report" 5
43 01 78 02.00 20, Para 2.1, "Record Drawings"; G 5
44 01 78 02.00 20, Para 2.2, "Record GIS Data"; G 5
45 01 78 02.00 20, Para 2.3, "Record Specifications"; G 5
46 01 78 02.00 20, Para 2.4, "Record Product Data"; G 5
47 02 41 00, Para 1.6.2, "Existing Conditions"; G 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
48 02 41 00, Para 1.1O, "Demolition Plan"; G 5
49 02 41 00, Para 1.4.1, "Notifications"; G 5
50 03 30 53, Para 2.1.3.1, "Air- Entraining Admixture" 5
03 30 53, Para 2.1.3.2, "Water-Reducing or Retarding Admixture"
52 03 30 53, Para 2.1.10, "Curing Materials" 5
53 03 30 53, Para 2.1.5, "Reinforcing Steel" 5
54 03 30 53, Para 2.1.6, "Expansion Joint Filler Strips
03 30 53, Para 2.1.7, "Joint Sealants - Field Molded Sealants"
Sealants"
03 30 53, Para 3.1.4.3, "Batching and Mixing Equipment"
03 30 53, Para 3.2, "Conveying and Placing Concrete"
58 03 30 53, Para 2.1.8, "Formwork" 5
59 03 30 53, Para 2.1.2, "Aggregates" 5
03 30 53, Para 1.3.3, "Concrete Mixture Proportions"
03 30 53, Para 3.12, "Compressive Strength Testing"
62 03 30 53, Para 3.12, "Slump" 5
63 03 30 53, Para 2.1.1, "Cementitious Materials" 5
64 03 30 53, Para 2.1.2, "Aggregates" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
65 03 30 53, Para 3.1, "Bill of Lading" 5
66 31 00 00, Para 3.4, "Shoring"; G 5
67 31 00 00, Para 1.4.2, "Dewatering Work Plan"; G 5
31 00 00, Para 3.7, "Utilization of Excavated Materials"; G
69 31 00 00, Para 3.11, "Testing" 5
70 31 00 00, Para 1.3.4, "Topsoil composition tests" 5
71 31 00 00, Para 3.11, "Testing" 5
72 32 01 19, Para 1.2, "Equipment" 5
32 01 19 Para 1 4 1 73 32 01 19, Para 1.4.1, "Materials"; G 2
74 32 01 29.61, Para 3.5.1.1, "Absorbent curing material" 2
75 32 01 29.61, Para 2.1.7, "Joint filler" 2
76 32 01 29.61, Para 2.1.6, "Joint sealant" 2
77 32 01 29.61, Para 1.5.1, "Concrete Mix Design" 5
78 32 01 29.61, Para 1.5.2, "Test Results" 5
79 32 01 29.61, Para 2.1.3.1, "gradation" 5
80 32 01 29.61, Para 2.1.1, "Cement" 5
81 32 01 29.61, Para 2.3.1, "slump" 5
82 32 01 29.61, Para 2.3.1, "air content" 5
83 32 01 29.61, Para 3.3.1.3, "strength" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
84 32 01 29.61, Para 2.1.1, "Cement" 5
85 32 01 29.61, Para 2.1.3, "Aggregates" 5
86 32 01 29.61, Para 2.1.4, "Admixtures" 5
87 32 01 29.61, Para 3.5.1.1, "Absorbent curing material" 5
32 01 29.61, Para 2.1.5.2, "Liquid membrane-forming compound"
89 32 01 29.61, Para 2.1.5.3, "Sheet" 5
90 32 01 29.61, Para 2.1.7, "Joint filler" 5
91 32 01 29.61, Para 2.1.6, "Joint sealant" 5
32 11 16 Para 1 3 92 32 11 16, Para 1.3, "Equipment" 5
93 32 11 16, Para 1.5, "Sampling and Testing" 5
94 32 11 16, Para 1.5.2.4, "Field Density Tests" 5
95 32 11 23, Para 1.3, "Plant
96 32 11 23, Para 1.5, "Sampling and Testing"; G 5
97 32 11 23, Para 1.5.2.4, "Field Density Tests"; G 5
98 32 12 10, Para 3.7, "Sampling and Testing" 5
99 32 12 17, Para 1.3.2, "Job-mix formula" 5
32 12 17, Para 2.2, "ASPHALT CEMENT
BINDER"
101 32 12 17, Para 2.3, "MIX
DESIGN" 5
32 12 17, Para 2.5.1, "Specific gravity test of asphalt"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
103 32 12 17, Para 2.5.1, "Coarse aggregate tests" 5
104 32 12 17, Para 2.5.1, "Weight of slag test" 5
32 12 17, Para 2.5.1, "Percent of crushed pieces in gravel"
106 32 12 17, Para 2.5.1, "Fine aggregate tests" 5
32 12 17, Para 2.5.1, "Specific gravity of mineral filler"
108 32 12 17, Para 2.5.1, "Bituminous mixture tests" 5
109 32 12 17, Para 3.5.2.1, "Aggregates tests" 5
110 32 12 17, Para 3.5.2.2, "Bituminous mix tests" 5110 "Bituminous mix tests" 5
111 32 12 17, Para 3.5.2.3, "Pavement courses" 5
112 32 13 13.03, Para 1.7, "Equipment" 5
113 32 13 13.03, Para 1.8, "Proposed Techniques"; G 5
114 32 13 13.03, Para 2.11.2, "Proportioning Studies"; G 5
115 32 13 13.03, Para 1.4, "Sampling and Testing"; G 5
116 32 13 13.03, Para 3.12.2.2, "Concrete Slump" 5
117 32 13 13.03, Para 3.12.2.2, "Air Content" 5
118 32 13 13.03, Para 3.12.2.2, "Pavement Thickness" 5
119 32 13 13.03, Para 3.12.2.2, "Flexural Strength" 5
120 32 13 13.03, Para 3.12.2.2, "Control Charts" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
DKFX 09-1009D
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
REPAIR IMC PAVEMENTS - AREA D
SOLICITATION/CONTRACT NO.
REMARKSDATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
SD
-1
0 O
PE
RA
TI
ON
M
AI
NT
EN
SD
-0
9 M
AN
UF
AC
TU
RE
R' S
FI
EL
D
RE
PO
RT
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
SD
-0
4 S
AM
PL
ES
SD
-0
5 D
ES
IG
N
DA
TA
SD
-0
7 C
ER
TI
FI
CA
TE
S
SD
-0
8 M
AN
UF
AC
TU
RE
R' S
IN
ST
RU
CT
IO
NS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
SD
-0 1 P
RE
CO
NS
TR
UC
IT
TA
LS
SD
-0
2 S
HO
P
DR
AW
IN
GS
SD
-0
3 P
RO
DU
CT
D
AT
A
OT
HE
RS
A
S
SP
EC
IF
IE
D
SD
-0
6 T
ES
T
RE
PO
RT
S
SD
-1
1 C
LO
SE
OU
T
SU
BM
IT
TA
LS
32 13 13.03, Para 1.5.1, "Contractor Quality Control Staff"; G
122 32 13 13.03, Para 1.5.3, "Laboratory Accreditation"; G 5
123 32 13 13.03, Para 1.4, "Commercial Laboratory"; G 5
124 32 17 24.00 10, Para 1.2, "Equipment"; G 5
125 32 17 24.00 10, Para 2.2.1, "Composition Requirements" 5
126 32 17 24.00 10, Para 1.4.1, "Qualifications" 5
127 32 17 24.00 10, Para 2.4, "Sampling and Testing" 5
32 17 24.00 10, Para 2.2.3, "Volatile Organic Compound 5128 "Volatile Organic Compound
(VOC)"
129 32 92 19, Para 2.5.3, "Wood cellulose fiber mulch" 5
130 32 92 19, Para 2.4, "Fertilizer" 5
131 32 92 19, Para 2.1, "seed" 5
132 32 92 19, Para 2.7, "Erosion Control Materials" 5
133 32 92 23, Para 2.4, "Fertilizer" 5
134 32 92 23, Para 2.1, "sods" 5
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.