Schedule_B_After_Amendment_0002.doc
DOC document 128 KB Posted
- Attached to
- Repair Weapons Station Housing Sewer Mains
- Solicitation number
- FA4418-15-R-0023
About this file
Schedule B after Amendment 0002.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 8,854 |
| Linear Foot |
Sewer Line Cleaning
FFP
The contractor shall provide all labor, materials, supervision and equipment to clean existing 8” sewer line in accordance with (IAW) the Specification dated 11 June 2015.
FOB: Destination
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 13,194 |
| Linear Foot |
Sewer Line TV Inspection
The contractor shall provide all labor, materials, supervision and equipment to perform sewer line TV inspection of existing 8” sewer main in accordance with (IAW) the Specification dated 11 June 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 10 |
| Each |
Manhole Repairs
The contractor shall provide all labor, materials, supervision and equipment to repair manholes IAW the specifications dated 11 June 2015. The work includes cleaning, pointing, and applying an approved epoxy coating system.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 16 |
| Each |
Replace Manhole Frame and Covers
The contractor shall provide all labor, materials, supervision and equipment to replace manholes frames and covers IAW the specifications dated 11 June 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4 |
| Each |
Adjust Manhole to Grade
The contractor shall provide all labor, materials, supervision and equipment to adjust manholes to grade IAW the specifications dated 11 June 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Slip-Lining Mob/Demob
Slip-Line equipment Mobilization and Demobilization.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Slip-Lining/Post TV Insp/Reinstatement
This CLIN is a non-priced, information only CLIN. The contractor shall provide all labor, materials, supervision and equipment to slip-line existing 8” sewer main and perform post TV inspection of existing (Vitrified Clay pipe (VCP), Truss pipe, and PVC) gravity sanitary sewer main with cured in place pipe (CIPP), approximately 112 service laterals reinstatement. Work includes post TV inspections, By-Pass pumping, Traffic Control and all other accessories and incidental work IAW the Specifications dated 11 June 2015.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AA
| 8,854 |
| Linear Foot |
Est Qty - Slip-Lining & Post TV Insp
The contractor shall provide all labor, materials, supervision and equipment to slip-line existing 8” sewer main and perform post TV inspection of existing (Vitrified Clay pipe (VCP), Truss pipe, and PVC) gravity sanitary sewer main with cured in place pipe (CIPP). Work includes post TV inspections, By-Pass pumping, Traffic Control and all other accessories and incidental work IAW the Specifications dated 11 June 2015. This CLIN is an estimated quantities CLIN. Quantity may be adjusted based on results of the TV Inspection.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0007AB
| 112 |
| Each |
Est Qty - Reinstate Service Laterals
The contractor shall provide all labor, materials, supervision and equipment to reinstate approximately 112 service laterals IAW the Specifications dated 11 June 2015. This CLIN is an estimated quantities CLIN. Quantity may be adjusted based on results of the TV Inspection.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Sewer Line Replacement Mob/Demob
Sewer Line equipment Mobilization and Demobilization.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Sewer Line Replacement
This CLIN is a non-priced, information only CLIN. The contractor shall provide all labor, materials, supervision and equipment to replace approximately 245 LF of 8” (VCP, Truss, and polyvinyl chloride (PVC)) sewer gravity main by open cut trench IAW the Specifications dated 11 June 2015. Work includes erosion controls, traffic control, By-pass pumping, excavation, remove existing pipe, install new pipe, backfill, compaction, and hydro-seeding. Quantity may be adjusted based on results of the TV Inspection.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AA
| 159 |
| Linear Foot |
Est Qty - Excavation Less than 6 Feet
Excavation and trenching less than 6 feet. Work includes erosion controls, traffic control, By-pass pumping, excavation, remove existing pipe, install new pipe, backfill, compaction, and hydro-seeding. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AB
| 60 |
| Linear Foot |
Est Qty - Excavation Greater than 6 Feet
Excavation and trenching greater than 6 feet. Work includes erosion controls, traffic control, By-pass pumping, excavation, remove existing pipe, install new pipe, backfill, compaction, and hydro-seeding. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AC
| 12 |
| Square Yard |
Est Qty - Road Repair
The contractor shall provide all labor, materials, supervision and equipment to sawcut, demo and replace road (Including flowable fill). This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AD
| 42 |
| Linear Foot |
Est Qty - Repair concrete curbs, gutters
The contractor shall provide all labor, materials, supervision and equipment to sawcut, demo and replace concrete curbs and gutters, including form and concrete finish. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AE
| 25 |
| Cubic Yard |
Est Qty - Repair sidewalks
The contractor shall provide all labor, materials, supervision and equipment to sawcut, demo and replace concrete sidewalks, including form and concrete finish. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AF
| 5 |
| Cubic Yard |
Est Qty - Contaminated Soil
The contractor shall provide all labor, materials, supervision and equipment to remove and dispose of existing contaminated soil and replace with approved soil/fill. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AG
| 16 |
| Cubic Yard |
Est Qty - #57 Stone Bedding
The contractor shall provide all labor, materials, supervision and equipment to install #57 stone bedding. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AH
| 8 |
| Each |
Est Qty - Soil Density Test
The contractor shall provide all labor, materials, supervision and equipment to provide soil density testing. This CLIN is an estimated quantities CLIN.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0009AJ
| 20 |
| Cubic Yard |
Est Qty - Unsuitable Soil
The contractor shall provide all labor, materials, supervision and equipment to remove and dispose of existing unsuitable soil and replace with approved soil/fill. This CLIN is an estimated quantities CLIN.
NET AMT
File details come from the government source that posted it. Updated .