Specification_-_Attachmnt_1.pdf
PDF 3 MB Posted
- Attached to
- Upgrade Primary Electric Service - Northside Federal contract opportunity
- Solicitation number
- FA4418-15-R-0018
About this file
Specifications - Attachment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ADDENDUM__2_-_Upgrade_Primary_Elec_Sv_Northside_20150824LJP.docx | DOCX document | |
| Revised_Sec_B_-_Solc_15-R-0018.doc.pdf | ||
| Amendment_0002_dated_8262015.doc | DOC document | |
| Questions_ _Answers.docx | DOCX document | |
| ADDENDUM__2_-_Upgrade_Primary_Elec_Sv_Northside_20150824LJP.docx | DOCX document | |
| Questions_ _Answers.docx | DOCX document | |
| Atch__2_-_Power_Point_Slides.pdf | ||
| ADDENDUM__1_-_Upgrade_Primary_Elec_Sv_Northside_LJP.docx | DOCX document | |
| Site_Vist_Minutes_held_on_11_Aug_2015.pdf | ||
| Amendment_0001_dated_13_Aug_2015.pdf | ||
| Atch__1_-_Record_of_Attendance.pdf | ||
| DRAWINGS_-_Attachmnt_2_-_Section_3.pdf | ||
| DRAWINGS_-_Attachmnt_2_Section_4.pdf | ||
| DRAWINGS_-_Attachmnt_2_-_Section_1.pdf | ||
| DRAWINGS_-_Attachmnt_2_-_Section_2.pdf | ||
| Solc_-FA4418-15-R-0018_-_WS.doc | DOC document | |
| Wage_Determinatn-_Attachmnt_5.pdf | ||
| Green_Procment_Form_-_Attachmnt_4.pdf | ||
| Submitl_Reg_-Attachmnt_3.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Primary Electrical Service, Northside 100% submittal
JBC
SPECIFICATIONS
Weapons Station Electrical Distribution
System – Upgrade Primary Electrical
Service, Northside
AT
JOINT BASE CHARLESTON,
SOUTH CAROLINA
PROJECT No.: DKGV 11-2192
SUBMITTAL DATE: July 10, 2015
ARCHITECTURE / PLANNING / INTERIOR DESIGN
493 King Street, Suite 100 Charleston, South Carolina 29403
Telephone: 843.577.6377 / Fax: 722.1768 Internet: www.glickboehmarchitecture.com
ATTACHMENT 1 - FA4418-15-R-0018
Project Design Team
Architect: Glick/Boehm & Associates, Inc.
493 King Street, Suite 100 Charleston, South Carolina 29403 843.577.6377
Electrical Consultant: DWG Consulting Engineers, Inc.
1009 Anna Knapp Blvd., Suite 202 Mt. Pleasant, SC 29464 843.849.1141
Civil Consultant / Forsberg Engineering & Surveying, Inc.
Landscape Consultant: 1587 Savannah Hwy, Suite B Charleston, SC 29407 843.571.2622
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.00 20 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 CONSTRUCTION QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 50 10 ENVIRONMENTAL
01 54 00 GREEN PROCUREMENT
01 57 20 WASTE MANAGEMENT
01 57 50 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATIONS AND MAINTENANCE DATA
DIVISION 02 – EXISTING CONDITIONS
02 41 13 SELECTIVE SITE DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS
DIVISION 03 – CONCRETE
03 30 53 MISCELLANEOUS CAST IN-PLACE CONCRETE
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.00 40 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS
26 13 01 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 18 23.00 40 MEDIUM-VOLTAGE SURGE ARRESTORS
26 20 00 INTERIOR DISTRIBUTION SYSTEMS
26 27 13.10 30 ELECTRICAL METERS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 71 01.00 40 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 77 36.00 40 MEDIUM VOLTAGE UTILITY FUSES
DKGV 11-2192 Design Upgrade Primary Electrical Service, Northside
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33
00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submit the following items to the Contracting Officer:
Proposed Contractor Laydown Area Plan; G
Utility Outage Requests; G
Utility Connection Requests; G
Excavation Permits; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work to be performed under this project consists of providing the labor, equipment, and materials to perform the construction of new electrical primary distribution system as shown on the Contract Documents prepared by
Glick Boehm Architecture.
The work includes new electrical construction, secondary distribution system modifications, buried conduit, medium voltage cables, concrete work, installation of new pad mounted equipment, and demolition of existing poles, aerial conductors and equipment, as well as demolition of existing ground mounted equipment, and other ancillary work as defined in the Contract
Documents
1.2.2 Location
The work shall be located at the Joint Base Charleston - Naval Weapons
Station in South Carolina.
1.3 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Drawing No.
G001 Cover Sheet
G002 Location Maps Sheet Index
C100 Civil Drawings
C101 Civil Drawings
C102 Civil Drawings
../Word/01%2033%2000.doc
Section 01 11 00 Page 2
C103 Civil Drawings
C104 Civil Drawings
C105 Civil Drawings
C106 Civil Drawings
C107 Civil Drawings
C108 Civil Drawings
C109 Civil Drawings
C110 Civil Drawings
C111 Civil Drawings
C112 Civil Drawings
C113 Civil Drawings
C114 Civil Drawings
C115 Civil Drawings
C116 Civil Drawings
C117 Civil Drawings
C118 Civil Drawings
E001 Electrical Notes and Legends
E002 Electrical Details
E003 Electrical Details
E004 Electrical Details
E005 Electrical schedules
E006 Existing One-Line
E007 New One-Line
E008 Substation 314 One-Line and Equipment Layout
E009 New One-Line
E010 New One-Line
E011 New One-Line
E012 New One-Line
E013 New One-Line
E014 New One-Line
E015 New One-Line
E016 New One-Line
E100 Electrical Demolition Site Plan Key Map
E101 Electrical Demolition Site Plan
E102 Electrical Demolition Site Plan
E103 Electrical Demolition Site Plan
E104 Electrical Demolition Site Plan
E105 Electrical Demolition Site Plan
E106 Electrical Demolition Site Plan
E107 Electrical Demolition Site Plan
E108 Electrical Demolition Site Plan
E109 Electrical Demolition Site Plan
E110 Electrical Demolition Site Plan
E111 Electrical Demolition Site Plan
E112 Electrical Demolition Site Plan
E113 Electrical Demolition Site Plan
E114 Electrical Demolition Site Plan
E115 Electrical Demolition Site Plan
E116 Electrical Demolition Site Plan
E117 Electrical Demolition Site Plan
E118 Electrical Demolition Site Plan
E200 Electrical Installation Site Plan Key Map
E201 Electrical Installation Site Plan
E202 Electrical Installation Site Plan
E203 Electrical Installation Site Plan
E204 Electrical Installation Site Plan
E205 Electrical Installation Site Plan
Section 01 11 00 Page 3
E206 Electrical Installation Site Plan
E207 Electrical Installation Site Plan
E208 Electrical Installation Site Plan
E209 Electrical Installation Site Plan
E210 Electrical Installation Site Plan
E211 Electrical Installation Site Plan
E212 Electrical Installation Site Plan
E213 Electrical Installation Site Plan
E214 Electrical Installation Site Plan
E215 Electrical Installation Site Plan
E216 Electrical Installation Site Plan
E217 Electrical Installation Site Plan
E218 Electrical Installation Site Plan
Five sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished.
Contractor shall immediately check furnished drawings and notify the
Government of any discrepancies.
1.4 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a project that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
Section 01 11 00 Page 4
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.6 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation. Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
If any communication cables, pipes, utility service wires or other
Government property is damaged by the Contractor by unauthorized digging or other excavating, the Contractor shall be responsible for the repairs and any incidental and consequential damages, and the Contractor shall provide, where applicable, an estimate and plan for making the repairs or other proposals, to the Contracting Officer and Communication Squadron within one hour. If the Contractor fails to respond and report the damage within four
(4) hours, the Government has the option to repair the damage and deduct all cost associated with the repairs of the damage from the contract price or bill the Contractor if the cost of repair is more than the contract price.
Repairs of Government-owned communications cable shall be in accordance with
AFTO 31W3-10-13 standards. A copy of these standards can be obtained from the Contracting Office.
The Contractor shall coordinate with the Contracting Officer on materials and down-time prior to beginning any work. All work will undergo a final inspection by the Contracting Officer and representative of the
Communication Squadron before acceptance. In accordance with Air Force
Instruction 51-502 Chapter 4 (Claims in Favor of the Government), a copy of the invoice for repairs shall be submitted to the Contracting Officer for administrative purposes.
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed, but indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Section 01 11 00 Page 5
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the
Government and shall be scheduled outside the regular working hours or on weekends.
Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 30 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved
The contractor shall submit utility outages per Joint Base Charleston
Weapons Station regulations using Air Force form 103.
1.7.2 Excavation, Welding, and Burning Permits
The Contractor may not begin any excavation or welding activities on the project site without prior approval from the Contracting Officer. A request for permission to conduct such activities shall be submitted for approval.
The scope of the required activities shall be described in detail,including locations of the activities, an estimated start date and finish date.
Provide additional information as required by the Contracting Officer.
ACTIVITY SUBMISSION DATE
Excavation Permits 14 calendar days prior to work
Welding Permits 14 calendar days prior to work
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted on project site.
1.7.3 Contractor Laydown Area
Contractor shall submit Proposed Contractor Laydown Area Plan.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
-- End of Section --
Section 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
07/07
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
1.1.1.1 Subcontractors and Personnel Contacts
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.1.1.2 Identification Badges
Identification badges will be furnished without charge. Application for and use of badges will be as directed. Furnish a completed EMPLOYMENT
ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://uscis.gov/graphics/formsfee/forms/files/i-9.pdf. Immediately report instances of lost or stolen badges to the Contracting Officer.
1.1.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contractor Officer, between 7:00 a.m. and 3:30 p.m., Monday through
Friday, and 7:00 a.m. to 11:00 p.m. on Saturday, excluding Federal holidays.
1.1.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the
Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer.
1.1.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to electric service, shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular
Hours." d. Operation of Station Utilities: The Contractor shall
Section 01 14 00 Page 2 not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.
Notify the Base Contracting Office a minimum of 4 weeks prior to interruption of any electrical services. In addition, notify the
Communications Squadron, BellSouth and Comcast Cablevision at least
3 weeks prior to interruption of telephone, cable television, and fiber optic services, as applicable.
Notify the affected Facility Managers a minimum of 3 weeks prior to interruption of any utilities services. All work affecting facility operations shall be approved by the facilities managers.
Section 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
11/09
1.1 SUBMITTALS
00 SUBMITTAL PROCEDURES:
List of contact personnel; G,
1.2 MINIMUM INSURANCE REQUIREMENTS
Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
a. Comprehensive general liability: $500,000 per occurrence
b. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage
c. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.
d. Employer's liability coverage of $100,000, except in States where workers compensation may not be written by private carriers,
e. Others as required by South Carolina.
1.3 CONTRACTOR PERSONNEL REQUIREMENTS
1.3.1 Subcontractors and Personnel
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.2 Identification Badges
Identification badges will be furnished without charge. Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.
1.3.3 Contractor Personnel Requirements
Failure to obtain entry approval will not affect the contract price or time of completion.
Section 01 30 00 Page 2
1.4 SUPERVISION
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.5 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work. Major subcontractors who will engage in the work shall also attend.
1.6 AVAILABILITY OF CADD DRAWING FILES
After award and upon request, the electronic "Computer-Aided Drafting and
Design (CADD)" drawing files will only be made available to the Contractor for use in preparation of construction data related to the referenced contract subject to the following terms and conditions.
Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the
Contractor and without liability or legal exposure to the Government. The
Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic CADD drawing files are not construction documents.
Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
If the Contractor uses, duplicates and/or modifies these electronic CADD files for use in producing construction drawings and data related to this contract, all previous indicia of ownership (seals, logos, signatures, initials and dates) shall be removed.
Section 01 30 00 Page 3
1.7 ELECTRONIC MAIL (E-MAIL) ADDRESS
The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the
Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use e-mail to notify the
Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple e-mail address will not allowed.
It is the Contractor's responsibility to make timely distribution of all
Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting
Officer, in writing, of any changes to this e-mail address.
Not Used
Section 01 32 17.00 20 Page 1
SECTION 01 32 17.00 20
NETWORK ANALYSIS SCHEDULES (NAS)
12/09
1.1 DESCRIPTION
The Contractor is responsible for scheduling procurement, Contractor quality control and construction, acceptance testing and training. Refer to
Specification Section 01 33 00 SUBMITTAL PROCEDURES to determine if any items require Government approval prior to construction; If any are required, that submittal review time shall be included in the schedule.
The schedule is a tool to manage the project, both for Contractor and
Government activities. It will also be used to report progress and evaluate time extensions. If cost-loaded, it will provide the basis for progress payments.
The Contractor shall use the Critical Path Method (CPM) and the Precedence
Diagram Method (PDM) to satisfy time and cost applications. For consistency, when scheduling software terminology is used in this specification, the terms in Primavera's scheduling programs are used.
1.2 SUBMITTALS
00 SUBMITTAL PROCEDURES, except as modified in this contract.
Qualifications; G
Baseline Network Analysis Schedule (NAS); G
SD-07 Certificates
Monthly Network Analysis Schedule Update; G
SD-11 Closeout Submittals
As-Built Schedule; G
1.3 SCHEDULE ACCEPTANCE PRIOR TO START OF WORK
The Contracting Officer and Contractor shall participate in a preliminary meeting(s) to discuss the proposed schedule and requirements of this section prior to the Contractor preparing the Project Baseline Schedule.
Government review comments on the Contractor's schedule(s) shall not relieve the Contractor from compliance with requirements of the Contract Documents.
Section 01 32 17.00 20 Page 2
Only bonds shall be paid prior to acceptance of the Baseline Network
Analysis Schedule (NAS).
The acceptance of a Baseline NAS is a condition precedent to:
a. The Contractor starting work on the demolition or construction stage(s) of the contract.
b. Processing Contractor's pay request(s) for construction activities/items of work.
c. Review of any schedule updates.
Submittal of the Baseline Network Analysis Schedule, and subsequent schedule updates, shall be understood to be the Contractor's certification that the submitted schedule meets all of the requirements of the Contract Documents, represents the Contractor's plan on how the work shall be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).
1.4 SOFTWARE
Project schedules must be prepared and maintained using Primavera P3, Primavera SureTrak or current mandated scheduling program. Save files in
Concentric P3 or current mandated scheduling program file format, compatible with the Governments version of the scheduling program. Importing data into
P3/SureTrak/current mandated scheduling program using data conversion techniques or third party software will be cause for rejection of the submitted schedule.
1.5 QUALIFICATIONS
The designated Scheduler for the project shall have prepared and maintained at least 3 previous schedules of similar size and complexity of this contract using SureTrak/P3 or current mandated scheduling program. A resume outlining the qualifications of the Scheduler shall be submitted for acceptance to the Contracting Officer. Payment will not be processed until an acceptable Scheduler is provided.
1.6 NETWORK SYSTEM FORMAT
The system shall include time scaled logic diagrams and specified reports.
1.6.1 Diagrams
Provide Time-scaled Logic Diagram printed in color on ANSI D size sheets.
The diagram shall clearly show activities on the critical path. Include the following information for each activity:
a. Activity ID
b. Activity Description
c. Original Duration in Work Days
d. Remaining duration
Section 01 32 17.00 20 Page 3
e. Percent Complete
f. Early Start Date
g. Early Finish Date
h. Total Float
1.6.2 Schedule Activity Properties and Level of Detail
The NAS shall identify all Government, Construction Quality Management
(CQM), Construction activities planned for the project and all other activities that could impact project completion if delayed. Separate activities shall be created for each Phase, Area, and Location the activity is occurring. The minimum number of construction activities in the final network diagram shall be as discussed at the Pre-Construction meeting
Activity categories included in the schedule are specified below.
With the exception of the Contract Award and Contract Completion Date (CCD) milestone activities, no activity shall be open-ended; each activity shall have predecessor and successor ties. Once an activity exists on the schedule it may not be deleted or renamed to change the scope of the activity and shall not be removed from the schedule logic without approval from the Contracting Officer. The ID number for a deleted activity shall not be re-used for another activity. No more than 20 percent of the activities shall be critical or near critical. Critical is defined as having zero days of Total Float. "Near Critical" is defined as having Total
Float of 1 to 14 days. Contractor activities shall be driven by calendars that reflect Saturdays, Sundays and all Federal Holidays as non-work days.
1.6.2.1 Activity Categories
a. Procurement Activities: Examples of procurement activities include, but are not limited to; Material/equipment submittal preparation, submittal and approval of material/equipment; material/equipment fabrication and delivery, and material/equipment on-site. As a minimum, separate procurement activities will be provided for critical items, long lead items, items requiring government approval and material/equipment procurement for which payment will be requested in advance of installation. The Contractor shall show each delivery with relationship tie to the Construction Activity specifically for the delivery.
b. Government Activities: Government and other agency activities that could impact progress shall be clearly identified. Government activities include, but are not limited to; Government approved submittal reviews, Government conducted inspections/tests, environmental permit approvals by State regulators, utility outages, Design Start, Construction Start, (including Design/Construction Start for each Fast-Track Phase, and delivery of Government Furnished
Material/Equipment.
c. Quality Management (QM) Activities: CQM Activities shall identify the
Preparatory Phase and Initial Phase for each Definable Feature of Work identified in the Contractor's Quality Control Plan. These activities shall be added to each Three-Week Look Ahead Schedule referenced in the paragraph entitled "THREE-WEEK LOOK AHEAD SCHEDULE" and will also be
Section 01 32 17.00 20 Page 4 included in each monthly update. The Follow-up Phase will be represented by the Construction Activities in the Baseline Schedule and in the schedule updates.
d. Construction Activities: No on-site construction activity shall have a duration in excess of 20 working days. Separate construction activities shall be created for each Phase, Area, Floor Level and Location the activity is occurring. Contractor activities will be driven by calendars that reflect Saturdays, Sundays and all Federal Holidays as non-work days, unless otherwise defined in this contract.
e. Turnover and Closeout Activities: Include a separate section with all items on the Navfac Red Zone Checklist/POAM that are applicable to this project. The checklist will be provided at the Preconstruction
Meeting. As a minimum, this will include all testing, specialized inspection activities, Pre-Final inspection, Punch List Completion, Final Inspection and Acceptance. Add a milestone for the Facility
Turnover Planning Meeting at approximately 75 percent construction contract completion or three to six months prior to BOD, whichever is sooner.
1.6.2.2 Contract Milestones and Constraints
a. Project Start Date Milestones: The Contractor shall include as the first activity on the schedule a start milestone titled "Contract
Award", which shall have a Mandatory Start constraint equal to the
Contract Award Date.
b. Projected Completion Milestone: The Contractor shall include an unconstrained finish milestone on the schedule titled "Projected
Completion". Projected Completion is defined as the point in time the
Government would consider the project complete and ready for its intended use. This milestone shall have the Contract Completion (CCD) milestone as its only successor.
c. Contract Completion Date (CCD) Milestone: The Contractor shall include as the last activity on the schedule a finish milestone titled
"Contract Completion (CCD)", which shall have a Mandatory Finish constraint equal to the current Contract Completion Date. Calculation of schedule updates shall be such that if the finish of the "Projected
Completion" milestone falls after the contract completion date, then negative float will be calculated on the longest path and if the finish of the "Projected Completion" milestone falls before the contract completion date, the float calculation shall reflect positive float on the longest path. The only predecessor to the Contract Completion Date
Milestone shall be the Projected Completion milestone.
1.6.2.3 Activity Code
At a minimum, the Contractor shall establish activity codes identified in this specification and 3 additional activity codes identified by the
Contracting Officer. Once established, activity codes and values cannot be changed without approval by the Contracting Officer.
a. Phase: All activities shall be assigned a 4-digit code value based on the contract phase it occurs in.
Section 01 32 17.00 20 Page 5
b. Area Code: All activities shall be assigned an area code value identifying the Area in which the activity occurs. Activities shall not belong to more than one area. Area is defined as a distinct space, function or activity category; such as, separate structure(s), sitework, project summary, construction quality management, material/equipment procurement, etc.
c. Work Item: All activities in the project schedule shall be assigned a
4-digit Work Item code value. Examples of Work Item code values include but are not limited to water lines, drain lines, building pad and foundation, slab on grade, walls and columns, suspended slab, roof structure, roofing, exterior finish systems, interior rough-in, and finishes, etc.
d. Location 1: Assign a 4-digit Location 1 code value to activities associated with multistory structures. Code values are used to identify the floor level where an activity is occurring.
e. Location 2: Assign a 4-digit Location 2 code value to all activities to identify the location within an Area, Work Item or Building Level that an activity is occurring.
f. Responsibility Code: All activities in the project schedule shall be identified with the party responsible for completing the task.
Activities shall not belong to more than one responsible party.
1.6.2.4 Anticipated Weather Delays
The Contractor shall use the National Oceanic and Atmospheric
Administration's (NOAA) historical monthly averages for the NOAA location closest to the project site as the basis for establishing a "Weather
Calendar" showing the number of anticipated non-workdays for each month due to adverse weather, Saturdays, Sundays and all Federal Holidays as non-work days.
Assign the Weather Calendar to any activity that could be impacted by adverse weather. The Contracting Officer will issue a modification in accordance with the contract clauses, giving the Contractor a time extension for the difference of days between the anticipated and actual adverse weather delay if the number of actual adverse weather delay days exceeds the number of days anticipated for the month in which the delay occurs and the adverse weather delayed activities critical to contract completion. A lost workday due to weather conditions is defined as a day in which the
Contractor cannot work at least 50 percent of the day on the impacted activity.
1.6.2.5 Cost Loading
a. Cost Loading Activities: Material and Equipment Costs for which payment will be requested in advance of installation shall be assigned to their respective procurement activity (i.e., the material/equipment on-site activity). All other construction costs shall be assigned to their respective Construction Activities. The value of inspection/testing activities will not be less than 10 percent of the total costs for Procurement and Construction Activities. Evenly disperse overhead and profit to each activity over the duration of the project.
Section 01 32 17.00 20 Page 6
b. Quantities and Units of Measure: Each cost loaded activity shall have a detailed quantity breakdown and unit of measure.
1.6.3 Schedule Software Settings and Restrictions
a. Activity Constraints: Date/time constraint(s), other than those required by the contract, will not be allowed unless accepted by the
Contracting Officer. Identify any constraints proposed and provide an explanation for the purpose of the constraint in the Narrative Report.
b. Default Progress Data Disallowed: Actual Start and Actual Finish dates on the CPM schedule shall match the dates on the Contractor Quality
Control and Production Reports.
c. Software Settings: Schedule calculations and Out-of-Sequence progress
(if applicable) shall be handled through Retained Logic, not Progress
Override. All activity durations and float values will be shown in days. Activity progress will be shown using Remaining Duration. Default activity type will be set to "Task". The project "Must Finish By" date shall be left blank.
1.6.4 Required Tabular Reports
The following reports shall be included with the schedule submittal:
a. Log Report: Listing of all changes made between the previous schedule and current updated schedule.
b. Narrative Report: Identify and justify; 1) Progress made in each area of the project; 2) Critical Path; 3) Date/time constraint(s), other than those required by the contract 3) Changes in the following; added or deleted activities, original and remaining durations for activities that have not started, logic, milestones, planned sequence of operations, critical path, and cost loading; 4) Any decrease in previously reported activity Earned Amount; 5) Pending items and status thereof, including permits, changes orders, and time extensions; 6)
Status of Contract Completion Date and interim milestones; 7) Current and anticipated delays (describe cause of delay and corrective actions(s)); and 8) Description of current and future schedule problem areas. Each entry in the narrative report will cite the respective
Activity ID and Activity Description, the date and reason for the change, and description of the change.
c. Earned Value Report: Listing all activities having a budget amount cost loaded. Compilation of total earnings on the project from notice to proceed to current progress payment request. Group and sort activities as directed by the Contracting Officer. Show current budget, previous physical percent complete, to-date physical percent complete, previous earned value, to-date earned value and cost to complete on the report for each activity:
d. Schedule Variance Control (SVC) Diagram: With each schedule submission, provide a SVC diagram showing 1) Cash Flow S-Curves indicating planned project cost based on projected early and late activity finish dates and 2) Earned Value to-date. Revise Cash Flow S-
Section 01 32 17.00 20 Page 7
Curves when the contract is modified, or as directed by the Contracting
Officer.
1.7 SUBMISSION AND ACCEPTANCE
1.7.1 Preliminary Meeting
Prior to the preparation of the Construction Network Analysis Schedule for acceptance; the Contracting Officer, Contractor and the scheduler shall participate in a preliminary meeting to discuss the proposed schedule and requirements of this section prior to submission of the network.
Discussions shall include: 1) Which construction activities may have delivered material costs included (e.g., concrete placement, etc.), 2) Which procurement activities will have material/equipment costs separated from their respective construction activity costs (e.g., any stored equipment, etc.) and, 3) Which procurement and construction activities will have separate testing/inspection costs; per the paragraph entitled "Cost Loading
Activities"
1.7.2 Monthly Network Analysis Updates
Contractor and Government representatives shall meet at monthly intervals to review and agree on the information presented in the updated project schedule. The submission of an acceptable, updated schedule to the
Government is a condition precedent to the processing of the Contractor's pay request. If a Schedule of Prices is the basis for progress payments, it shall be consistent with the logic and activity breakdowns on the progress schedule. If progress payments are based on a cost-loaded schedule, the
Contractor and Government shall agree on percentage of payment for each activity progressed during the update period.
Provide the following with each Schedule submittal:
a. Time Scaled Logic Diagram.
b. Reports listed in paragraph entitled "Required Tabular Reports."
c. Data disks containing the project schedule. Include the back-up native
.prx/current mandated schedule program files.
1.7.3 As-Built Schedule
As a condition precedent to the release of retention and making final payment, submit an "As-Built Schedule," as the last schedule update showing all activities at 100 percent completion. This schedule shall reflect the exact manner in which the project was actually constructed.
1.8 CONTRACT MODIFICATION
Submit a Time Impact Analysis with each cost and time proposal for a proposed change. Time Impact Analysis (TIA) shall illustrate the influence of each change or delay on the Contract Completion Date or milestones. No time extensions will be granted nor delay damages paid unless a delay occurs which consumes all available Project Float, and extends the Projected Finish beyond the Contract Completion Date.
Section 01 32 17.00 20 Page 8
a. Each TIA shall be in both narrative and schedule form demonstrating the delay impact. The TIA shall identify the predecessors to the new activities and demonstrate the impacts to successor activities. The
Contractor shall run the schedule calculations and submit the impacted schedule with the proposal or claim.
b. The TIA schedule submitted with the proposal shall show all activity progress as of the date of the proposal. If the impact to the schedule occurs prior to the proposal submission, the TIA schedule shall be updated to show all activity progress as of the time of the impact. If the proposed change does not impact the CCD, no TIA shall be required.
c. Submit Data disks containing the TIA schedule. Include the back-up native .prx/current mandated schedule program files.
d. Unless the Contracting Officer requests otherwise, only conformed contract modifications shall be added into the Project NAS.
1.9 PROJECT FLOAT
Project Float is the length of time between the Contractor's Projected
Finish Milestone and the Contract Completion Date Milestone. Project Float available in the schedule, at any time shall not be for the exclusive use of either the Government or the Contractor.
1.10 THREE-WEEK LOOK AHEAD SCHEDULE
The Contractor shall prepare and issue a 3-Week Look Ahead schedule to provide a more detailed day-to-day plan of upcoming work identified on the
Project Network Analysis Schedule. The work plans shall be keyed to NAS activity numbers and updated each week to show the planned work for the current and following two-week period. Additionally, include upcoming outages, closures, preparatory meetings, and initial meetings. Identify critical path activities on the Three-Week Look Ahead Schedule. The detail work plans are to be bar chart type schedules, maintained separately from the Project NAS on an electronic spreadsheet program and printed on 8 ½ by
11 sheets as directed by the Contracting Officer. Activities shall not exceed 5 working days in duration and have sufficient level of detail to assign crews, tools and equipment required to complete the work. Three hard copies and one electronic file of the 3-Week Look Ahead Schedule shall be delivered to the Contracting Officer no later than 8 a.m. each Monday and reviewed during the weekly CQC Coordination Meeting.
Section 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;
samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:
Submittals which are required prior to or commencing work on site.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Section 01 33 00 Page 2
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Section 01 33 00 Page 3
Report which includes findings of a test required to be performed by the
Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or
Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment.
This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
Section 01 33 00 Page 4
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract.
For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-
01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTALS
submittals not having a "G" designation are for Contractor QC approval.
Submit the following in accordance with this section.
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4.1 Government Approved
Within the terms of the Contract Clause entitled, "Specifications and
Drawings for Construction," they are considered to be "shop drawings."
1.4.2 Information Only
They are not considered to be "shop drawings" within the terms of the
Contract Clause referred to above.
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL
1.5.1 Submittals Required from the Contractor
As soon as practicable after award of contract, and before procurement of fabrication, forward to the contracting officer submittals required in the technical sections of this specification, including shop drawings, product
Section 01 33 00 Page 5 data and samples. One copy of the transmittal form for all submittals shall be forwarded to the Resident Officer in Charge of Construction.
JBC will review and approve for the Contracting Officer those submittals reserved for Contracting Officer approval to verify submittals comply with the contract requirements.
1.5.1.1 O&M Data
JBC will review and approve for the Contracting Officer O&M Data to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.
In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.
1.6 PREPARATION
1.6.1 Transmittal Form
Transmit each submittal, except sample…
This is the start of the file's text. The full file is on GovTribe.