Questions_ _Answers.docx

DOCX document 15 KB Posted

Attached to
Upgrade Primary Electric Service - Northside Federal contract opportunity
Solicitation number
FA4418-15-R-0018
Issued by
Department of the Air Force Air Mobility Command

About this file

Answers to questions

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Primary Electric Service - Northside, newest first.
File Type Posted
ADDENDUM__2_-_Upgrade_Primary_Elec_Sv_Northside_20150824LJP.docx DOCX document
Revised_Sec_B_-_Solc_15-R-0018.doc.pdf PDF
Amendment_0002_dated_8262015.doc DOC document
Questions_ _Answers.docx DOCX document
ADDENDUM__2_-_Upgrade_Primary_Elec_Sv_Northside_20150824LJP.docx DOCX document
Atch__2_-_Power_Point_Slides.pdf PDF
ADDENDUM__1_-_Upgrade_Primary_Elec_Sv_Northside_LJP.docx DOCX document
Atch__1_-_Record_of_Attendance.pdf PDF
Site_Vist_Minutes_held_on_11_Aug_2015.pdf PDF
Amendment_0001_dated_13_Aug_2015.pdf PDF
DRAWINGS_-_Attachmnt_2_-_Section_3.pdf PDF
DRAWINGS_-_Attachmnt_2_Section_4.pdf PDF
DRAWINGS_-_Attachmnt_2_-_Section_1.pdf PDF
DRAWINGS_-_Attachmnt_2_-_Section_2.pdf PDF
Solc_-FA4418-15-R-0018_-_WS.doc DOC document
Wage_Determinatn-_Attachmnt_5.pdf PDF
Green_Procment_Form_-_Attachmnt_4.pdf PDF
Submitl_Reg_-Attachmnt_3.pdf PDF
Specification_-_Attachmnt_1.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upgrade Primary Electrical Service, Northside Project: DKGV 11-2192 Joint Base Charleston – WS, SC

24 AUG 2015

QUESTIONS/ANSWERS

Q1. Detail 9 on E003 show a 4/0 ground wire in the trench above the concrete in the ductbank, however, the areas to receive directional drilling shows no requirement for this 4/0 ground wire. Is this ground wire going to be required wherever new UGP is installed and if so, can it be pulled in with the bore pipe or will a separate bore need to be made to accommodate this wire?

A1. The 4/0 ground wire is only required for trenched locations and isn't required for areas with directional drilling.

Q2. Transformers to be demoed are normally tested for PCB's and shown for disposal as an estimated quantity on the bid schedule. Are we required to assume that all or none of this equipment will be tested as positive for PCB's? Does the government want to keep all of this removed equipment?

A2. All transformers that are being removed from service will be required to be tested for PCBs before being disposed. It is assumed that all transformers removed from service shall be disposed of. However, disposal schedule should be coordinated with the contracting officer to meet the needs of JBC Weapons Station.

Q3. The meter schedule on sheet E005 shows the meter to be a "Schnieder Electric Powerlogic 8650 for both socket & CT type applications and for both single and three phase configurations, however, the 8650 is for use on three phase systems only and will only work by using CT's. Please review the meter schedule and revise the meter requirement.

A3. Meter Schedule Note #2 on drawing E005 will be changed to the following: "ALL NEW METERS SHALL BE SCHEIDER ELECTRIC POWERLOGIC ION 8650 OR EQUIVALENT WITH DEFAULT I/O AND ETHERNET (10/100 BASE) FEATURE SET 'C.'"