Text version

REVISED SECTION B – DATED 8/5/2015

FA4418-15-R-0011

PAGE of 44

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Repair Electrical Distribution, Area J

FFP

All work as required by drawings and specifications for Project DKFX 07-0003J Repair Electrical Distribution System Area J. The work to be performed consists of providing the labor, equipment, and materials to replace substandard equipment and replace base overhead primary (12.47kV) distribution systems (poles, conductors, equipment), and overhead secondary supply conductors with a new underground utility systems. All work will be coordinated with the phone and CATV utility providers. Work includes all electrical, painting, concrete trenching, directional drilling, and site work.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Estimated Quantities (Repair) - Area J

Disposal of one Transformer with lead based paint and no PCB's.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Estimated Quantities (Repair) - Area J

Disposal of one Transformer with PCB's and no lead based paint.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Estimated Quantities (Repair) - Area J

Disposal of one Transformer with PCB's and lead based paint.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

Estimated Quantities (Repair) - Area J

Work associated with installing new cable a manhole that is not shown on the plans.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1,200
Linear Foot

Estimated Quantities (Repair) - Arera J

Replacement of existing cable that fails electrical tests when new equipment is installed. (including re-test and terminate)

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
6
Each

Estimated Quantities (Repair) - Area J

Replacement of existing 15 kV cable termination including retest.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
6
Each

Estimated Quantities (Repair) - Area J

Installation of additional 10 foot copper clad steel ground rod and 25 foot of 4/0 bare copper connecting wire with exothermic connections.

NET AMT

ESTIMATED QUANTITIES

SCHEDULE B

NOTE: (Applicable to CLINS 0002-0009). If actual quantities should be less than 85% or more than 115% of the estimated quantities, the unit prices of those items falling outside the parameters of 85% / 115% will be subject to negotiation. However, if the actual quantities installed/removed fall within the 85% / 115% range of estimated quantities, the unit prices will be used for payment purposes. In either event, the contractor shall only be paid for the actual quantities installed/removed (as applicable to price schedule). In no case shall the contractor exceed the amount of the contract without consent of the Contracting Officer.