Repair Electrical Distribution System - Area J DKFX 07-003J Joint Base Charleston (JBC) Air Base, South Carolina
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
01/08
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 30
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Submit the following items to the Contracting Officer:
Utility Outage Requests;
G
Utility Connection Requests;
Excavation Permits;
Proposed Contractor Laydown Area Plan; G
Burning Permits; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work to be performed under this project consists of providing the labor, equipment, and materials to perform the demolition of the existing overhead electrical distribution system and the construction of a new underground electrical distribution system as shown on the Contract Documents prepared by McKellar & Associates Architects.
The work includes electrical, sitework, concrete, directional drilling, and site lighting and other items defined in the Contract Documents.
1.2.2 Location
The work shall be located at the Joint Base Charleston Air Force Base in South Carolina. The Joint Base Charleston Air Force Base is accessible by interstate 26 and SC Highway 643 (Dorchester Road).
1.3 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Drawing No.
T001 Title Sheet C101 Existing Site Survey C102 Existing Site Survey
Section 01 11 00 Page 2
C103 Existing Site Survey C104 Existing Site Survey C105 Existing Site Survey E001 Electrical Legend, Notes, & Abbreviations E002 Electrical Details & Schedules E003 Electrical Details E004 Electrical Details E011 Electrical Existing One-Line Schematic E012 Electrical One-Line Schematic E101 Electrical Demolition Site Plan – Part 1 E102 Electrical Demolition Site Plan – Part 2 E103 Electrical Demolition Site Plan – Part 3 E104 Electrical Demolition Site Plan – Part 4 E201 Electrical New Work Site Plan – Part 1 E202 Electrical New Work Site Plan – Part 2 E203 Electrical New Work Site Plan – Part 3 E204 Electrical New Work Site Plan – Part 4
Five sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished.
Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
1.4 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
Section 01 11 00 Page 3
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.6 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation. Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
If any communication cables, pipes, utility service wires or other Government property is damaged by the Contractor by unauthorized digging or other excavating, the Contractor shall be responsible for the repairs and any incidental and consequential damages, and the Contractor shall provide, where applicable, an estimate and plan for making the repairs or other proposals, to the Contracting Officer and Communication Squadron within one hour. If the Contractor fails to respond and report the damage within four
(4) hours, the Government has the option to repair the damage and deduct all cost associated with the repairs of the damage from the contract price or bill the Contractor if the cost of repair is more than the contract price.
Repairs of Government-owned communications cable shall be in accordance with AFTO 31W3-10-13 standards. A copy of these standards can be obtained from the Contracting Office.
The Contractor shall coordinate with the Contracting Officer on materials and down-time prior to beginning any work. All work will undergo a final inspection by the Contracting Officer and representative of the Communication Squadron before acceptance. In accordance with Air Force Instruction 51-502 Chapter 4 (Claims in Favor of the Government), a copy of the invoice for repairs shall be submitted to the Contracting Officer for administrative purposes.
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.
Section 01 11 00 Page 4
The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.
1.7.2 Excavation and Burning Permits
ACTIVITY SUBMISSION DATE
Excavation Permits 14 calendar days prior to work
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted on project site.]
1.7.3 Contractor Laydown Area
Contractor shall submit Proposed Contractor Laydown Area Plan
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.2.1 Project Description |
| 1.2.2 Location |
| 1.3 CONTRACT DRAWINGS |
| 1.4 PROJECT ENVIRONMENTAL GOALS |
| 1.5 EXISTING WORK |
| 1.6 LOCATION OF UNDERGROUND FACILITIES |
| 1.7 ON-SITE PERMITS |
| 1.7.1 Utility Outage Requests and Utility Connection Requests |
| 1.7.2 Excavation and Burning Permits |
| 1.7.3 Contractor Laydown Area |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |