Attachment 1 - Upgrade Area Lighting (Revised 30 May 2013

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4418-13-R-0014 Attachment 1 (Revised)

Statement of Work

DKFX 11-1059 Upgrade Area Lighting (Induction)

Charleston Air Force Base

South Carolina

18 April 2013

30 May 2013

(Revised)

Statement of Work:

The project consists of providing all plant, labor, material parts, and equipment necessary to replace existing 400 watt high pressure sodium (HPS) street pole lighting fixtures along Hill Blvd and adjacent streets to include parking lots. Existing fixtures will be replaced with shadow box type induction lighting fixtures located on Joint

Base Charleston (Air Base), South Carolina. The performance period for this project shall be 180 days. The project requirements include, but are not limited to the following major items of work:

General Requirements:

Contractor shall submit lighting fixture and surge protector cut sheets along with the AF Form 66

(Schedule of Material Submittal) to the Government Contract Officer for review and approval. The Cut sheets shall be from the manufacture showing details of the fixture and will include items such as the fixture color, size, voltage and mounting brackets.

Parking Lot Fixtures: Disconnect and remove existing High Pressure Sodium (HPS) fixtures located at parking lot areas identified on the attached map. Provide and install advanced 100W and/or 80W

Induction fixtures with photocells which meet or exceed existing lighting specifications as determined by the IES recommended lighting requirements. Specifications for the Induction lighting replacements are listed in the Technical Data below. Contractor shall verify voltage requirements prior to ordering fixtures and surge protection.

Utilize existing lighting poles and ensure weight specifications are maintained with new Induction fixtures.

Provide all electrical power connections and grounding as necessary to complete the lighting fixture installation and ensure that it is operational at each location.

Lighting fixtures shall be equipped with a dusk to dawn photocell sensor. Photocells will be installed on the each lighting fixture. If a pole mounted photocell exists install a shorting cap and install photocell on each light.

Install a surge protector on each pole (inside the hand-hole). Specifications for the surge protectors are listed in the Technical Data below.

Disposal and/or recycling of the existing lighting fixtures will be in accordance with Federal, State and Local regulations.

All fixtures will meet the Charleston AFB color specifications, (Sherwin-Williams Nightscape/SW

2007 Dark Bronze).

FA4418-13-R-0014 Attachment 1 (Revised)

Locations: (See Attached Map for Locations)

B – 214/215 (Bowling Alley/Library) – 6ea/100W shoe box w/ PE cell (2 double Pole & 2 Single Pole)

B – 254 (Security Forces) – 8ea/100W shoe box w/ PE cell (4 Double Pole)

B – 256 (Security Forces Warehouse) - 6ea/100W shoe box w/ PE cell (1 double Pole & 4 Single Poles)

B – 113 (C-17 Trainer) - 6ea/100W shoe box w/ PE cell (2 double Pole & 2 Single Pole)

B – 108 (Flight Sim.) – 9ea/100W shoe box w/PE cell (2 double Pole & 5 Single Pole)

B – 164 (Passenger Terminal) – 8ea/100W shoe box w/PE cell (4 Double Pole)

B – 51 (Reserve Bldg) – 15ea/100W shoe box w/PE cell (6 double Pole & 3 Single Pole)

B – 58 (Avionics Shop) – 33ea/100W shoe box w/PE cell and 2ea/80W shoe box w/twist lock PE cell

(15 double Pole & 5 Single Pole)

B – 16000/129 (Wing HQ) - 8ea/100W shoe box w/PE cell and 2ea/80W shoe box w/twist lock PE cell

(1 double Pole & 8 Single Pole)

B – 503 (Contracting) – 11ea/100W shoe box w/PE cell (5 double Pole & 1 Single Pole)

B – 581/506 (Life Support) – 9ea/100W shoe box w/PE cell (9 Single Pole)

B – 224 (Pool) – 3ea/100W shoe box w/PE cell (3 Single Pole)

Street Lighting Fixtures: Disconnect and remove existing 400W HPS fixtures located along Hill

Blvd from the East Jackson to Bates Ave. and along Graves Ave. See Attached map for light fixture locations. Provide and install 200W Induction fixtures with photocells which meet or exceed existing lighting specifications as determined by the IES recommended lighting requirements. Specifications for the Induction lighting replacements are listed in the Technical Data below. Contractor shall verify voltage requirements prior to ordering fixtures and surge protectors.

Utilize existing lighting poles and ensure weight specifications are maintained with new Induction fixtures.

Provide all electrical power connections and grounding as necessary to complete the lighting fixture installation and ensure that it is operational at each location.

Lighting fixtures shall be equipped with a dusk to dawn photocell sensor. Lighting fixtures shall be equipped with a dusk to dawn photocell sensor. Photocells will be installed on the each lighting fixture. If a pole mounted photocell exists install a shorting cap and install photocell on each light.

Install a surge protector on each pole (inside the hand-hole). Specifications for the surge protectors are listed in the Technical Data below.

Light poles (15) on Hill Blvd will require a round pole adapter for mounting the fixtures.

Note: Contractor should include in their proposal the replacement of the (15) Top Slip

Couplings on the round pole application.

Disposal and/or recycling of the existing lighting fixtures will be in accordance with Federal, State and Local regulations.

Paint all fixtures to Charleston AFB color specifications, (Sherwin-Williams Nightscape/SW 2007

Dark Bronze)

Locations: (See Attached Map for Locations)

Hill Blvd – 56ea/200W shoe box w/PE cell (24 Single pole & 16 Double pole)

FA4418-13-R-0014 Attachment 1 (Revised)

Graves Ave. – 6ea/200W shoe box w/PE cell (6 Single Pole)

Hill Blvd – (Dorchester Gate) 20ea/200W shoe box w/PE cell (5 Double pole & 10 Single Pole)

Building 602 Golf Cart Storage Facility: Disconnect and remove (12) existing Metal Halide fixtures. Provide and install (12) T8 fluorescent fixtures with end mount high-bay occupancy sensor which meet or exceed existing lighting specifications as determined by the IES recommended lighting requirements. Specifications for the T8 lighting fixtures and Occupancy sensors are listed in the Technical Data below. Contractor shall verify voltage requirements prior to ordering fixtures.

Utilize existing lighting pendant drops and ensure weight specifications are maintained with new fixtures. Install seismic restraints in accordance with Federal, State and Local regulations.

Provide all electrical power connections and grounding as necessary to complete the lighting fixture installation and ensure that it is operational at each location.

Disposal and/or recycling of the existing lighting fixtures will be in accordance with

Federal, State and Local regulations.

Project Work Site Locations:

See attached area maps for fixture locations.

Light Plan.pdf

Technical Descriptions

Technical Specifications: All Induction lighting fixtures shall meet and/or exceed the IES recommended lighting requirements/specifications and will have a minimum warranty of 5 years.

If using suitable substitute, submittals are required for review and approval.

Surge Protector:

Model: SYCOM Surge Inc, SYC-LP series or suitable substitute

General Description: Lifetime warranty, Hard- wire parallel installation, thermal fusing and enclosure measures 2-7/8” x 3-3/4” x 2”, UL 94V0 flame retardant and NEMA 4 weatherproof.

Max Load Current: Unlimited

Life Cycle: > 3000 10,000A pulses

Insulation: > 600V

Protected Modes: L-N, L-G, N-G, and L-L

Current Drain: < 100uA

Operating Frequency: 0-400Hz

Response Time: < 5 Nanoseconds

Voltage: Varies depending on pole location

FA4418-13-R-0014 Attachment 1 (Revised)

Parking Lot Lighting Fixtures:

Model: Industrial Lighting Products (ILP) F16A-100-120/277-FLEM6-PC (100W) or F16A-80-120/277-

FLEM6-PC (80W) or suitable substitute

General Description: Ideal for parking lot and general area applications. Housing is made of heavy gauge die cast aluminum with textured bronze powercoat finish. Standard Mounting is 6” side arm

(pole). Instant on, flicker free, cold start and hot restart. 16” Large Window Flood Induction fixture.

Safety: UL listed for wet locations, ETL/UL Standard 1598.

Finish: Finish color shall be Sherwin-Williams Nightscape/SW 2007 Dark Bronze or suitable substitute.

System Watts: Varies depending on pole location

Street Lighting Fixtures:

Model: Industrial Lighting Products (ILP) F23-200-120/277-FLEM6-PC (200W) or suitable substitute

General Description: Ideal for parking lot and street applications. Housing is made of heavy gauge die cast aluminum with textured bronze powercoat finish. Standard Mounting is 6” side arm (pole). Instant on, flicker free, cold start and hot restart, 23” Large Window Flood Induction fixture.

Safety: UL listed for wet locations, ETL/UL Standard 1598.

Finish: Finish color shall be Sherwin-Williams Nightscape/SW 2007 Dark Bronze or suitable substitute.

System Watts: Varies depending on pole location

T8 Fluorescent Fixtures:

Model: Illumina BS100T8

Housing: 100% UV stabilized polycarbonate material, integrated liquid silicone perimeter gasket with memory retention, recessed stainless steel mounting brackets.

Reflector: Dual parabolic (2-lamp versions) and single parabolic (1-lamp versions) high emission reflector. Vacuum metallized finish. Direct mount reflector configuration supports all electrical components.

Lamp/Socket: Two (2) or four (4) T8 ratchet type sockets.

Mounting: Surface mount configuration as standard. Optional (AC) aviation cable, adjustable and (PK) pendant mounting are available.

Power line/ feed: 3-wire, solid type 18awg, pre-stripped 12” leads for quick in-field connection.

Diffuser: High performance diffuser. Complete light emission (CLE) technology. 100% polycarbonate construction, impact resistant, UV stabilized to reduce yellowing index.

High Bay Occupancy Sensors:

Model: Hubbell HBA WASP2

• Digital Passive Infrared (PIR) sensor

• Supports mounting heights up to 45 ft.

• Multiple (single and dual) output versions

• End mount and surface mount versions

• Unique Smart Cycling™ for improved lamp life

• Interchangeable area and aisle lens options

• Daylight sensor for daylight harvesting applications

• Low voltage and line voltage (120/277/347VAC, 208/480VAC, 480VAC) models available

FA4418-13-R-0014 Attachment 1 (Revised)

• Low-temperature (-40°C)/water-tight versions available, UL and cUL listed, Five-year warranty

Products:

All project components shall be installed in accordance with the manufacturer’s technical instructions.

All electrical installations shall comply with National Electrical Code (current edition) and contract specifications.

Applicable Instructions:

Work areas around project site will be occupied by the using activity during the course of work. Caution must be taken to insure all safety work practices are adhered to while construction work requirements are performed within the facility.

Caution must be taken in all work areas of the facility to avoid physical or cosmetic damage to existing government property. Any damage to government property resulting from construction procedures shall be the responsibility of the contractor.

Power shut-off request must be coordinated in order to minimize the impact to onsite facility activities and advanced request shall be scheduled with the base civil engineering Saber Office.

All permits, as required, shall be obtained prior to lighting fixture implementation.

Special Instructions:

Project site shall be kept clean and orderly daily.

Work methods and practices shall be accomplished in a safe manner abiding by work safety and base safety standards. Work site is subject to OSHA inspections.

Work site areas shall be returned to existing conditions at completion of work requirements.

Environmental: The Contractor shall comply with all applicable requirements stated in the Toxic Substances

Control Act of 1976. All materials used in the performance of this contract shall be applied in strict accordance with manufacturer’s printed label instructions and all applicable standards. The use of Class I ozone-depleting substances, asbestos containing materials, and lead paints are strictly prohibited.

Waste Disposal/Recycling: The contractor shall recycle all recyclable materials as a result of demolition. All waste materials generated by all work under this contract shall be handled, transported, stored and disposed of off base at no additional cost to the government, by the contractor and or sub-contractors, at any time in accordance with all applicable federal, state or local laws, ordinances, regulations.