BUILDING 90838

E U

P

T965-1

PUMPING STATION

(2) 7 1/2 HP, 240 V., 1Ø PUMPS

SEE "LARGE SCALE PLAN,"

THIS SHEET.

EXISTING PAD MOUNTED TRANSFORMER - EXTEND

NEW PRIMARY DUCT INTO EXISTING TRANSFORMER

PAD & CONNECT PRIMARY CONDUCTOR TO LOOP

FEED PRIMARY TERMINAL. REMOVE EXISTING SURGE

ARRESTER FROM LOOP FEED TERMINAL.

NEW UNDERGROUND PRIMARY IN TWO-WAY 4" CONCRETE

ENCASED DUCTBANK (TYP.) - SEE DETAIL, SHEET E-2.

(3) 2" HDPE CONDUITS - (2) UNDERGROUND

SECONDARY BRANCH CIRCUITS AND (1) CONTROL

WIRING CIRCUIT - INSTALL BY DIRECTIONAL BORE

METHOD BELOW EXISTING TAXIWAY (TYP.)

ELECTRICAL SITE PLAN

SCALE: 1" = 100'-0"

T A

X I W

A Y

G

O L F

S E

R V

I C

E

R

O A

D

EXISTING UNDERGROUND PRIMARY TO REMAIN.

NEW UNDERGROUND PRIMARY IN TWO-WAY 4"

HDPE DUCTBANK. INSTALL BY DIRECTIONAL

BORE METHOD. (TYP.)

U

P

U P

D

B

U

P

D

B

U P

D

B

NEW HANDHOLE (TYP.) - SEE DETAIL, SHEET E-2.

U

S

D

B

LARGE SCALE PLAN

SCALE: 1/8" = 1'-0"

UNDERGROUND SECONDARY & CONTROL WIRING

CONDUITS - INSTALL BY DIRECTIONAL BORE METHOD.

CONCRETE FOUNDATION -

SEE DETAILS, SHEET E-3.

UNDERGROUND PRIMARY IN TWO-WAY

CONCRETE ENCASED DUCTBANK.

UNDERGROUND PRIMARY - INSTALL

BY DIRECTIONAL BORE METHOD.

EDGE OF HOT CARGO PAD

ASPHALT SHOULDER

HANDHOLE

UNDERGROUND SECONDARY

PUMPING STATION CONTROL PANEL

PAD MOUNTED TRANSFORMER

F R

O M

E D

G E

O F

T A

X

IW

A Y

G O

L F

M

IN

DETAIL - PUMPING STATION CONTROL PANEL

(INTERIOR VIEW)

WORK NOTES:

ALUMINUM ENCLOSURE - NEMA 3R (MINIMUM) RATING FOR OUTDOOR INSTALLATIONS. PUMPING STATION CONTROL

PANEL SHALL BE THE PRODUCT OF A MANUFACTURER THAT NORMALLY BUILDS LIFT STATION CONTROL PANELS.

2 200 A., 2 P. MAIN CIRCUIT BREAKER.

3 80 A., 2 P. BRANCH CIRCUIT BREAKER FOR PUMP # 1.

4 80 A., 2 P. BRANCH CIRCUIT BREAKER FOR PUMP # 2.

5 20 A., 1 P. BRANCH CIRCUIT BREAKER FOR CONTROL VOLTAGE.

6 20 A., 1 P. BRANCH CIRCUIT BREAKER FOR GFCI DUPLEX RECEPTACLE.

7 MOTOR STARTER - PUMP # 1.

8 MOTOR STARTER - PUMP # 2.

9 GFCI DUPLEX RECEPTACLE - MOUNTED IN FACE OF CONTROL PANEL DOOR.

10 RELAY FOR CONTROL OF PUMP # 1.

11 RELAY FOR CONTROL OF PUMP # 2.

NO SCALE

M A

I N

T E

N A

N C

E

D

R A

I N

A G

E

R U

N W

OF 23

FTEV 12-1034

JRH

EWW/JRH

1 MAY 2015

E L

E C

T R

I C

L

S

I T

E

P

L A

N

E-1

DETAIL - TWO-WAY 4" CONCRETE ENCASED DUCT BANK

3"

3500 P.S.I. CONCRETE

NO SCALE

3" 3"

3"

4" PVC CONDUIT (TYP.)

3"

SINGLE LINE DIAGRAM

NO SCALE

US

M

1 # 2 (15 KV) TYPE "EPR" W/ 1/3 CONCENTRIC NEUTRAL IN

TWO-WAY 4" CONC. ENCASED DUCT BANK.

KWH METER - SEE SPECS.

PAD MOUNT TRANSFORMER - 37.5 KVA, 1Ø,

7.2 KV PRIMARY TO 240/120 V. SECONDARY.

SEE DETAILS, SHEET E-3.

UP

US

US

10 KV LIGHTNING ARRESTER -

BOND TO GROUND CONDUCTOR

IN PRIMARY COMPARTMENT.

PUMPING STATION CONTROL PANEL

200 A., 2 P. MAIN BREAKER

80 A., 2 P. BRANCH BREAKER FOR PUMP 1

80 A., 2 P. BRANCH BREAKER FOR PUMP 2

20 A., 1 P. BRANCH BREAKER FOR GFCI DUPLEX RECEPTACLE

MOUNTED IN DOOR OF CONTROL PANEL

20 A., 1 P. BRANCH BREAKER FOR CONTROL VOLTAGE

STARTERS FOR PUMP MOTORS

CONTROL WIRING IN 2" HDPE BORE DUCT TO

PUMPING STATION FLOAT SWITCHES.

2 # 4 & 1 # 8 GND. IN 2" HDPE BORE DUCT TO PUMP 2

2 # 4 & 1 # 8 GND. IN 2" HDPE BORE DUCT TO PUMP 1

3 # 3/0 IN 2" PVC, SCH. 40 CONDUIT

# 4 BARE COPPER IN 1/2" PVC, SCH. 40 CONDUIT

TO 3/4" X 20'-0" COPPERCLAD GROUND ROD.

# 4 BARE COPPER IN 1/2" PVC, SCH. 40 CONDUIT

TO REBAR IN CONCRETE FOUNDATION.

PRECAST HANDHOLE NOTES:

R

B

O

C

K

O

U

T

D

E

S

D

U

C

T

R

M

I

N

A

T

O

R

K

N

O

C

K

O

U

T

S

DETAIL - PRECAST CONCRETE HANDHOLE

N.T.S.

M

N

N

P

U

L

L

I

G

O

P

C

K

Y

P

Q

U

A

R

E

DETAIL - HANDHOLE COVER

N.T.S.

HANDHOLE COVER NOTES:

LIFT HANDLE

HINGES

1. HANDHOLE SHALL BE DESIGNED FOR FAA RUNWAY LOADING.

2. HANDHOLE AND COMPONENTS SHALL MEET ALL ASTM REQUIREMENTS.

3. HANDHOLE SHALL BE PLACED ON 6" BASE OF GRAVEL FOR EVEN LOAD

DISTRIBUTION AND EASE OF INSTALLATION.

4. INSTALL PRE-EXTRUDED CONCRETE JOINT SEALANT IN ALL CONCRETE

JOINT SPACES.

5. PROVIDE SUMP IN CENTER OF HANDHOLE FLOOR.

6. INSTALL 3/4" X 10'-0" COPPERCLAD GROUND ROD IN HANDHOLE. LEAVE

TOP 6" OF ROD EXPOSED. SEAL AROUND ROD W/ NON-SHRINK GROUT.

7. HANDHOLE COVER SHALL BE 1" MAXIMUM ABOVE SURROUNDING

GRADE. GRADE THE AREA AROUND HANDHOLE TO PROVIDE POSITIVE

DRAINAGE.

8. BOND THE COVER & FRAME TO GROUND ROD W/ # 2 BARE COPPER

CONDUCTOR, OR EQUIVALENT COPPER STRAP.

9. INSTALL TWO CABLE RACKS ON EACH HANDHOLE WALL. INSTALL ONE

PULLING IRON AND POCKET ON EACH HANDHOLE WALL OPPOSITE

FROM DUCT ENTRANCES.

10. DUCTS SHALL ENTER MANHOLE WALLS NEAR CORNERS.

1. HANDHOLE COVER SHALL BE AIRCRAFT RATED FOR A LOAD OF

200,000 POUNDS.

2. COVER SHALL HAVE A LIFT ASSIST SPRING AND SAFETY BAR TO HOLD

THE COVER OPEN.

3. COVER SHALL BE MANUFACTURED FROM DUCTILE IRON IN

ACCORDANCE WITH ASTM A536.

4. FRAME SHALL BE MANUFACTURED FROM GRAY IRON IN ACCORDANCE

WITH ASTM A48, CL35B.

36" SQUARE

38 3/8" SQUARE

42" SQUARE

4"

1 1/2"

PUMP

PVC JUNCTION BOX (DO NOT USE ANY METALLIC COMPONENTS

THAT WILL CORRODE). NO CONNECTION WILL BE MADE OUTSIDE OF

CONTROL PANEL. THE WIRES SHALL RUN CONTINUOUSLY FROM

CONTROL PANEL TO CONNECTION ON PUMP WITHOUT ANY

SPLICES OR CONNECTIONS.

PROVIDE A SEAL-TIGHT FITTING OR RUBBER GROMMET AT ALL

CONDUIT PENETRATIONS. CONDUIT THAT PENETRATES THE SUMP

WALL SHALL BE PVC OR OTHER NON-CORROSIVE MATERIAL.

CONTROL NOTES:

THE PUMPING STATION WILL BE SET UP FOR THE FOLLOWING

OPERATION. THE UNIT SHALL HAVE FLOATING BULB SWITCHES FOR

PUMP CONTROLS. AS THE WATER RISES & SWITCH # 2 IS

ACTIVATED, PUMP #1 SHALL COME ON. AS THE WATER CONTINUES

TO RISE & SWITCH # 3 IS ACTIVATED, PUMP #2 SHALL COME ON.

THE TWO PUMP SHALL CONTINUE TO RUN UNTIL SWITCH #1 IS

BROKEN AND BOTH PUMPS SHALL CYCLE OFF. THE CONTROLS

WILL HAVE A SHORT CYCLE TIMER THAT PREVENTS SHORT

CYCLING OF THE PUMPS. THE PUMPS SHALL HAVE ADJUSTABLE ON

AND OFF TIMERS.

SWITCH #3 - TURN PUMP #2 ON

SWITCH #2 - TURN PUMP #1 ON

SWITCH #1 - TURN PUMPS OFF

PUMPING STATION PUMP CONTROL DIAGRAM

N.T.S.

M A

I N

T E

N A

N C

E

D

R A

I N

A G

E

R U

N W

1 MAY 2015

E L

E C

T R

I C

D

T

A I L

S

A

A

G R

A M

S

E-2

3/4" X 20'-0" COPPERCLAD

GROUND ROD (TYP. - 4.)

EXOTHERMIC WELD

#3/0 IN SECONDARY SECTION

#3/0 IN PRIMARY SECTION

#3/0 BARE COPPER GROUND GRID

8" (TYP.)

6" (TYP.)

4'-4"±

8'-6"±

#4 BARS AT 12" O.C. EACH WAY (TYP.)

GROUND GRID NOTE:

6"

EQUALEQUAL

10" 1'-0"

GRADE

2'-4"±

1'-2"±

3'-6" (MIN.)

3" MIN. (TYP.)

2"

1 5/8" X 1 5/8", 12 GAUGE,

HOT-DIPPED GALVANIZED

STEEL CHANNEL (TYP.)

PUMPING STATION CONTROL PANEL

CONDUIT & WIRING AS SHOWN ON

"SINGLE LINE DIAGRAM," SHEET E-2.

PAD MOUNTED TRANSFORMER - SECURE TO CONCRETE PAD

W/ ANCHOR BOLTS PER MANUFACTURER'S SPECIFICATIONS.

PROVIDE ENGRAVED RED BAKELITE SIGN W/ LETTERS

"DANGER HIGH VOLTAGE." SIGN SHALL BE 12"W X 9"H. SECURE

TO DOOR OF TRANSFORMER HOUSING W/ BRASS SCREWS.

ALL TRANSFORMER GROUND GRID CONNECTIONS

SHALL BE BRAZED OR EXOTHERMIC WELDED.

PAD MOUNTED TRANSFORMER

PAD MOUNTED TRANSFORMER

NOTE:

ADJUST PHYSICAL DIMENSIONS OF CONCRETE PAD & SUPPORT STRUCTURE

AS REQUIRED BY THE DIMENSIONS OF THE TRANSFORMER AND PUMPING

STATION CONTROL PANEL FURNISHED BY THE CONTRACTOR.

#3/0 BARE COPPER GROUND GRID

PLAN VIEW

ELEVATION SIDE VIEW

INSTALLATION DETAIL - PAD MOUNTED TRANSFORMER & PUMPING STATION CONTROL PANEL

N.T.S.

1 5/8" X 1 5/8", 12 GAUGE, HOT-DIPPED

GALVANIZED STEEL CHANNEL (TYP.)

PUMPING STATION CONTROL PANEL

3500 PSI CONCRETE

PAD MOUNTED TRANSFORMER

ASPHALT SHOULDER

GRADE

1'-0"

#3/0 BARE COPPER GROUND GRID

CONDUIT & WIRING AS SHOWN ON

"SINGLE LINE DIAGRAM," SHEET E-2.

TWO-WAY 4" CONCRETE ENCASED DUCTBANK -

"SINGLE LINE DIAGRAM," SHEET E-2.

3500 PSI CONCRETE 3500 PSI CONCRETE

PUMPING STATION CONTROL PANEL

1 5/8" X 1 5/8", 12 GAUGE,

HOT-DIPPED GALVANIZED

STEEL CHANNEL (TYP.)

GRADE

M A

I N

T E

N A

N C

E

D

R A

I N

A G

E

R U

N W

1 MAY 2015

E-3

I N

S T

A L

L A

T I O

N

D

E T

A

U

N T

A

N S

F O

R M

E R

P

U M

P I N

G

S

T A

T I O

N

C

O N

T R

N

E

File details come from the government source that posted it. Updated .