Attachment_2-_FTEV-12-1034_Combined_Drawings.pdf
PDF 6 MB Posted
- Attached to
- Maintenance Drainage Runway 18/36
- Solicitation number
- FA4417-16-R-0026
About this file
Attachment 2- Drawings
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 90838
E U
P
T965-1
PUMPING STATION
(2) 7 1/2 HP, 240 V., 1Ø PUMPS
SEE "LARGE SCALE PLAN,"
THIS SHEET.
EXISTING PAD MOUNTED TRANSFORMER - EXTEND
NEW PRIMARY DUCT INTO EXISTING TRANSFORMER
PAD & CONNECT PRIMARY CONDUCTOR TO LOOP
FEED PRIMARY TERMINAL. REMOVE EXISTING SURGE
ARRESTER FROM LOOP FEED TERMINAL.
NEW UNDERGROUND PRIMARY IN TWO-WAY 4" CONCRETE
ENCASED DUCTBANK (TYP.) - SEE DETAIL, SHEET E-2.
(3) 2" HDPE CONDUITS - (2) UNDERGROUND
SECONDARY BRANCH CIRCUITS AND (1) CONTROL
WIRING CIRCUIT - INSTALL BY DIRECTIONAL BORE
METHOD BELOW EXISTING TAXIWAY (TYP.)
ELECTRICAL SITE PLAN
SCALE: 1" = 100'-0"
T A
X I W
A Y
G
O L F
S E
R V
I C
E
R
O A
D
EXISTING UNDERGROUND PRIMARY TO REMAIN.
NEW UNDERGROUND PRIMARY IN TWO-WAY 4"
HDPE DUCTBANK. INSTALL BY DIRECTIONAL
BORE METHOD. (TYP.)
U
P
U P
D
B
U
P
D
B
U P
D
B
NEW HANDHOLE (TYP.) - SEE DETAIL, SHEET E-2.
U
S
D
B
LARGE SCALE PLAN
SCALE: 1/8" = 1'-0"
UNDERGROUND SECONDARY & CONTROL WIRING
CONDUITS - INSTALL BY DIRECTIONAL BORE METHOD.
CONCRETE FOUNDATION -
SEE DETAILS, SHEET E-3.
UNDERGROUND PRIMARY IN TWO-WAY
CONCRETE ENCASED DUCTBANK.
UNDERGROUND PRIMARY - INSTALL
BY DIRECTIONAL BORE METHOD.
EDGE OF HOT CARGO PAD
ASPHALT SHOULDER
HANDHOLE
UNDERGROUND SECONDARY
PUMPING STATION CONTROL PANEL
PAD MOUNTED TRANSFORMER
F R
O M
E D
G E
O F
T A
X
IW
A Y
G O
L F
M
IN
DETAIL - PUMPING STATION CONTROL PANEL
(INTERIOR VIEW)
WORK NOTES:
ALUMINUM ENCLOSURE - NEMA 3R (MINIMUM) RATING FOR OUTDOOR INSTALLATIONS. PUMPING STATION CONTROL
PANEL SHALL BE THE PRODUCT OF A MANUFACTURER THAT NORMALLY BUILDS LIFT STATION CONTROL PANELS.
2 200 A., 2 P. MAIN CIRCUIT BREAKER.
3 80 A., 2 P. BRANCH CIRCUIT BREAKER FOR PUMP # 1.
4 80 A., 2 P. BRANCH CIRCUIT BREAKER FOR PUMP # 2.
5 20 A., 1 P. BRANCH CIRCUIT BREAKER FOR CONTROL VOLTAGE.
6 20 A., 1 P. BRANCH CIRCUIT BREAKER FOR GFCI DUPLEX RECEPTACLE.
7 MOTOR STARTER - PUMP # 1.
8 MOTOR STARTER - PUMP # 2.
9 GFCI DUPLEX RECEPTACLE - MOUNTED IN FACE OF CONTROL PANEL DOOR.
10 RELAY FOR CONTROL OF PUMP # 1.
11 RELAY FOR CONTROL OF PUMP # 2.
NO SCALE
M A
I N
T E
N A
N C
E
D
R A
I N
A G
E
R U
N W
OF 23
FTEV 12-1034
JRH
EWW/JRH
1 MAY 2015
E L
E C
T R
I C
L
S
I T
E
P
L A
N
E-1
DETAIL - TWO-WAY 4" CONCRETE ENCASED DUCT BANK
3"
3500 P.S.I. CONCRETE
NO SCALE
3" 3"
3"
4" PVC CONDUIT (TYP.)
3"
SINGLE LINE DIAGRAM
NO SCALE
US
M
1 # 2 (15 KV) TYPE "EPR" W/ 1/3 CONCENTRIC NEUTRAL IN
TWO-WAY 4" CONC. ENCASED DUCT BANK.
KWH METER - SEE SPECS.
PAD MOUNT TRANSFORMER - 37.5 KVA, 1Ø,
7.2 KV PRIMARY TO 240/120 V. SECONDARY.
SEE DETAILS, SHEET E-3.
UP
US
US
10 KV LIGHTNING ARRESTER -
BOND TO GROUND CONDUCTOR
IN PRIMARY COMPARTMENT.
PUMPING STATION CONTROL PANEL
200 A., 2 P. MAIN BREAKER
80 A., 2 P. BRANCH BREAKER FOR PUMP 1
80 A., 2 P. BRANCH BREAKER FOR PUMP 2
20 A., 1 P. BRANCH BREAKER FOR GFCI DUPLEX RECEPTACLE
MOUNTED IN DOOR OF CONTROL PANEL
20 A., 1 P. BRANCH BREAKER FOR CONTROL VOLTAGE
STARTERS FOR PUMP MOTORS
CONTROL WIRING IN 2" HDPE BORE DUCT TO
PUMPING STATION FLOAT SWITCHES.
2 # 4 & 1 # 8 GND. IN 2" HDPE BORE DUCT TO PUMP 2
2 # 4 & 1 # 8 GND. IN 2" HDPE BORE DUCT TO PUMP 1
3 # 3/0 IN 2" PVC, SCH. 40 CONDUIT
# 4 BARE COPPER IN 1/2" PVC, SCH. 40 CONDUIT
TO 3/4" X 20'-0" COPPERCLAD GROUND ROD.
# 4 BARE COPPER IN 1/2" PVC, SCH. 40 CONDUIT
TO REBAR IN CONCRETE FOUNDATION.
PRECAST HANDHOLE NOTES:
R
B
O
C
K
O
U
T
D
E
S
D
U
C
T
R
M
I
N
A
T
O
R
K
N
O
C
K
O
U
T
S
DETAIL - PRECAST CONCRETE HANDHOLE
N.T.S.
M
N
N
P
U
L
L
I
G
O
P
C
K
Y
P
Q
U
A
R
E
DETAIL - HANDHOLE COVER
N.T.S.
HANDHOLE COVER NOTES:
LIFT HANDLE
HINGES
1. HANDHOLE SHALL BE DESIGNED FOR FAA RUNWAY LOADING.
2. HANDHOLE AND COMPONENTS SHALL MEET ALL ASTM REQUIREMENTS.
3. HANDHOLE SHALL BE PLACED ON 6" BASE OF GRAVEL FOR EVEN LOAD
DISTRIBUTION AND EASE OF INSTALLATION.
4. INSTALL PRE-EXTRUDED CONCRETE JOINT SEALANT IN ALL CONCRETE
JOINT SPACES.
5. PROVIDE SUMP IN CENTER OF HANDHOLE FLOOR.
6. INSTALL 3/4" X 10'-0" COPPERCLAD GROUND ROD IN HANDHOLE. LEAVE
TOP 6" OF ROD EXPOSED. SEAL AROUND ROD W/ NON-SHRINK GROUT.
7. HANDHOLE COVER SHALL BE 1" MAXIMUM ABOVE SURROUNDING
GRADE. GRADE THE AREA AROUND HANDHOLE TO PROVIDE POSITIVE
DRAINAGE.
8. BOND THE COVER & FRAME TO GROUND ROD W/ # 2 BARE COPPER
CONDUCTOR, OR EQUIVALENT COPPER STRAP.
9. INSTALL TWO CABLE RACKS ON EACH HANDHOLE WALL. INSTALL ONE
PULLING IRON AND POCKET ON EACH HANDHOLE WALL OPPOSITE
FROM DUCT ENTRANCES.
10. DUCTS SHALL ENTER MANHOLE WALLS NEAR CORNERS.
1. HANDHOLE COVER SHALL BE AIRCRAFT RATED FOR A LOAD OF
200,000 POUNDS.
2. COVER SHALL HAVE A LIFT ASSIST SPRING AND SAFETY BAR TO HOLD
THE COVER OPEN.
3. COVER SHALL BE MANUFACTURED FROM DUCTILE IRON IN
ACCORDANCE WITH ASTM A536.
4. FRAME SHALL BE MANUFACTURED FROM GRAY IRON IN ACCORDANCE
WITH ASTM A48, CL35B.
36" SQUARE
38 3/8" SQUARE
42" SQUARE
4"
1 1/2"
PUMP
PVC JUNCTION BOX (DO NOT USE ANY METALLIC COMPONENTS
THAT WILL CORRODE). NO CONNECTION WILL BE MADE OUTSIDE OF
CONTROL PANEL. THE WIRES SHALL RUN CONTINUOUSLY FROM
CONTROL PANEL TO CONNECTION ON PUMP WITHOUT ANY
SPLICES OR CONNECTIONS.
PROVIDE A SEAL-TIGHT FITTING OR RUBBER GROMMET AT ALL
CONDUIT PENETRATIONS. CONDUIT THAT PENETRATES THE SUMP
WALL SHALL BE PVC OR OTHER NON-CORROSIVE MATERIAL.
CONTROL NOTES:
THE PUMPING STATION WILL BE SET UP FOR THE FOLLOWING
OPERATION. THE UNIT SHALL HAVE FLOATING BULB SWITCHES FOR
PUMP CONTROLS. AS THE WATER RISES & SWITCH # 2 IS
ACTIVATED, PUMP #1 SHALL COME ON. AS THE WATER CONTINUES
TO RISE & SWITCH # 3 IS ACTIVATED, PUMP #2 SHALL COME ON.
THE TWO PUMP SHALL CONTINUE TO RUN UNTIL SWITCH #1 IS
BROKEN AND BOTH PUMPS SHALL CYCLE OFF. THE CONTROLS
WILL HAVE A SHORT CYCLE TIMER THAT PREVENTS SHORT
CYCLING OF THE PUMPS. THE PUMPS SHALL HAVE ADJUSTABLE ON
AND OFF TIMERS.
SWITCH #3 - TURN PUMP #2 ON
SWITCH #2 - TURN PUMP #1 ON
SWITCH #1 - TURN PUMPS OFF
PUMPING STATION PUMP CONTROL DIAGRAM
N.T.S.
M A
I N
T E
N A
N C
E
D
R A
I N
A G
E
R U
N W
1 MAY 2015
E L
E C
T R
I C
D
T
A I L
S
A
A
G R
A M
S
E-2
3/4" X 20'-0" COPPERCLAD
GROUND ROD (TYP. - 4.)
EXOTHERMIC WELD
#3/0 IN SECONDARY SECTION
#3/0 IN PRIMARY SECTION
#3/0 BARE COPPER GROUND GRID
8" (TYP.)
6" (TYP.)
4'-4"±
8'-6"±
#4 BARS AT 12" O.C. EACH WAY (TYP.)
GROUND GRID NOTE:
6"
EQUALEQUAL
10" 1'-0"
GRADE
2'-4"±
1'-2"±
3'-6" (MIN.)
3" MIN. (TYP.)
2"
1 5/8" X 1 5/8", 12 GAUGE,
HOT-DIPPED GALVANIZED
STEEL CHANNEL (TYP.)
PUMPING STATION CONTROL PANEL
CONDUIT & WIRING AS SHOWN ON
"SINGLE LINE DIAGRAM," SHEET E-2.
PAD MOUNTED TRANSFORMER - SECURE TO CONCRETE PAD
W/ ANCHOR BOLTS PER MANUFACTURER'S SPECIFICATIONS.
PROVIDE ENGRAVED RED BAKELITE SIGN W/ LETTERS
"DANGER HIGH VOLTAGE." SIGN SHALL BE 12"W X 9"H. SECURE
TO DOOR OF TRANSFORMER HOUSING W/ BRASS SCREWS.
ALL TRANSFORMER GROUND GRID CONNECTIONS
SHALL BE BRAZED OR EXOTHERMIC WELDED.
PAD MOUNTED TRANSFORMER
PAD MOUNTED TRANSFORMER
NOTE:
ADJUST PHYSICAL DIMENSIONS OF CONCRETE PAD & SUPPORT STRUCTURE
AS REQUIRED BY THE DIMENSIONS OF THE TRANSFORMER AND PUMPING
STATION CONTROL PANEL FURNISHED BY THE CONTRACTOR.
#3/0 BARE COPPER GROUND GRID
PLAN VIEW
ELEVATION SIDE VIEW
INSTALLATION DETAIL - PAD MOUNTED TRANSFORMER & PUMPING STATION CONTROL PANEL
N.T.S.
1 5/8" X 1 5/8", 12 GAUGE, HOT-DIPPED
GALVANIZED STEEL CHANNEL (TYP.)
PUMPING STATION CONTROL PANEL
3500 PSI CONCRETE
PAD MOUNTED TRANSFORMER
ASPHALT SHOULDER
GRADE
1'-0"
#3/0 BARE COPPER GROUND GRID
CONDUIT & WIRING AS SHOWN ON
"SINGLE LINE DIAGRAM," SHEET E-2.
TWO-WAY 4" CONCRETE ENCASED DUCTBANK -
"SINGLE LINE DIAGRAM," SHEET E-2.
3500 PSI CONCRETE 3500 PSI CONCRETE
PUMPING STATION CONTROL PANEL
1 5/8" X 1 5/8", 12 GAUGE,
HOT-DIPPED GALVANIZED
STEEL CHANNEL (TYP.)
GRADE
M A
I N
T E
N A
N C
E
D
R A
I N
A G
E
R U
N W
1 MAY 2015
E-3
I N
S T
A L
L A
T I O
N
D
E T
A
U
N T
A
N S
F O
R M
E R
P
U M
P I N
G
S
T A
T I O
N
C
O N
T R
N
E
File details come from the government source that posted it. Updated .