Questions and Answers
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. FA4417-14-R-0001
PROJECT: SABER IDIQ & Seed Project Renovate Common Area Bldg. 90352
QUESTIONS - ANSWERS
14 May 2014 Question 1: PAST PERFORMANCE - does the government want the past performance information to be provided at the Master Contract level or at the individual task order level?
Answer: To meet the past performance requirements listed in Section L, provide information at the Master contract level.
Question 2: Page 70 of subject RFP cites that relevancy will be determined using the “Past Performance Information Forms (PIFs).” Is it the government’s intent to provide the PIF template?
Answer: An amendment will be processed to change the PIF reference above to reflect Past Performance Questionnaire.
Question 3: Factor II, Volume II – PAST PERFORMANCE is limited to 20 pages. Section 3.1.2 states that the maximum number of Past Performance references provided is 10 – this works out to be 2 pages per reference. Section 3.1.3 requests that for the Past Performance references provided in 3.1.2, that a summary for each reference be provided, and each reference should not exceed 1 page per reference. Please clarify as it seems contradictory.
Answer: An amendment will be processed to change the reference limitation page from 1 page to 2 pages in paragraph 3.1.3.
Question 4: Are there a minimum number of Past Performance references that need to be provided? Your response will help us decide if we should submit two references – 5 pages each, or ten references - 2 pages each.
Answer: No minimum number of Past Performance references required.
Question 5: Section 2.1.2.2 Qualifications (page 57) states that the key personnel (Project Manager, Project Superintendent, and Project Foreman) are all to have two (2) years of experience in Industrial Construction. Do you mean similar type FEDERAL construction experience? If not, please define Industrial Construction.
Answer: Industrial Construction in this context includes any similar commercial and/or federal construction experience.
Question 6: Note on page 58 reads, “One of the two personnel identified above (Project Superintendent and Project Foreman) shall be on site at all times…” With a potential of 20 task orders concurrently on going, please confirm that this means that one of these two personnel have to be on-station at all times that work is ongoing but not necessarily at the building or location where the work is occurring.
Answer: One of the two personnel identified in paragraph 2.1.2.2, Project Superintendent and Project Foreman, shall be on-station at all times.
Question 7: Page 58 reads. “Project Foreman: For each TO…” Do you mean to say, “Project Foreman: The contractor shall assign a Project Foreman with a minimum of …”
Answer: Paragraph 2.1.2.2 will be changed to read “The contractor shall assign a Project Foreman with a minimum of …”
Question 8: Are there restrictions on the number of active construction projects at one time that the project foreman can be assigned to, similarly to the restrictions placed on the Project Superintendent?
Answer: Project Foreman will only be assigned to individual task orders.
Question 9: Please define the design and / or drawing requirements for the demonstration project.
Answer: The SEED project identified in paragraph 2.1.1 does not require the contractor to provide a design and/or drawing.
Question 10: If we do not have in-house A/E capabilities, do we need to name the firm, and submit a teaming agreement with the firm, that we intend to utilize to support the design effort required by this contract?
Answer: Per the requirements section 2.1.2, an A/E firm must be identified that will meet all the requirements identified in Section M.
Question 11: Subfactor 2 – Management Plan and Qualifications cites that the plan should be IAW Section 3.1 of the SABER SOW. Should the plan also be IAW with Section 29.2 of the SABER SOW? And if so, please confirm that 29.2.1 through 29.2.5 are to be addressed in the Quality Control Plan that is to be submitting by the winning company post-award, and not in the Management Plan. The clarification is being asked due to the last sentence in 29.2 using the word “proposal” and not “submittal”.
Answer: No, the Management Plan should be IAW Section 3.1 of the SABER SOW only. The last sentence of paragraph 29.2 has been changed from “proposal” to “submittal”.
Question 12: Line item 4.6.6 of the Seed Project SOW says install new AHU. See provided drawings for sizing details. Are we replacing the AHU in kind or do you want us to verify that the ductwork and the AHU are the proper size and react accordingly.
Answer: The current AHU and ductwork is properly sized. Replace in kind.
Question 13: Paragraph 4.2.12 of the Seed Project SOW says install new range hood and associated suppression system. Can we reuse existing hood and suppression system?
Answer: Install new range hood and suppression system