Wage Determination H H PDF.pdf

PDF 144 KB Posted

Attached to
Replace Parking Lot Lighting
Solicitation number
FA3047-12-T-0018
Issued by

About this file

Wage Determination (Heavy and Highway)

View the file

Other files

File Type Posted
Revised SOW B-908.pdf PDF
Sidewalk-Curb Drawing B908.pdf PDF
Amendment 0001.pdf PDF
RFQ.pdf PDF
AF 66 Schedule of Material Submittals.pdf PDF
SOW B-908 PDF.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA3047-12-T-0018

ATTACHMENT #2 (Wage Determination) Heavy amd Highway, Total of 4 pages

General Decision Number: TX120016 01/06/2012 TX16

Superseded General Decision Number: TX20100017

State: Texas

Construction Types: Heavy and Highway

Counties: Atascosa, Bandera, Bastrop, Bell, Bexar, Brazos, Burleson, Caldwell, Comal, Coryell, Guadalupe, Hays, Kendall, Lampasas, McLennan, Medina, Robertson, Travis, Williamson and

Wilson Counties in Texas.

HEAVY (excluding tunnels and dams, not to be used for work on

Sewage or Water Treatment Plants or Lift / Pump Stations in

Bell, Coryell, McClennon and Williamson Counties) and HIGHWAY

Construction Projects

Modification Number Publication Date

0 01/06/2012

* SUTX2011-006 08/03/2011

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (Paving and

Structures)......................$ 12.56

ELECTRICIAN......................$ 26.35

FORM BUILDER/FORM SETTER

Paving & Curb...............$ 12.94

Structures..................$ 12.87

LABORER

Asphalt Raker...............$ 12.12

Flagger.....................$ 9.45

Laborer, Common.............$ 10.50

Laborer, Utility............$ 12.27

Pipelayer...................$ 12.79

Work Zone Barricade

Servicer....................$ 11.85

PAINTER (Structures).............$ 18.34

POWER EQUIPMENT OPERATOR:

Agricultural Tractor........$ 12.69

Asphalt Distributor.........$ 15.55

Asphalt Paving Machine......$ 14.36

Boom Truck..................$ 18.36

Broom or Sweeper............$ 11.04

Concrete Pavement

Finishing Machine...........$ 15.48

Crane, Hydraulic 80 tons or less.....................$ 18.36

Crane, Lattice Boom 80 tons or less................$ 15.87

Crane, Lattice Boom over

80 tons.....................$ 19.38

Crawler Tractor.............$ 15.67

Directional Drilling

Locator.....................$ 11.67

Directional Drilling

Operator....................$ 17.24

Excavator 50,000 lbs or

Less........................$ 12.88

Excavator over 50,000 lbs...$ 17.71

Foundation Drill, Truck

Mounted.....................$ 16.93

Front End Loader, 3 CY or

Less........................$ 13.04

Front End Loader, Over 3 CY.$ 13.21

Loader/Backhoe..............$ 14.12

Mechanic....................$ 17.10

Milling Machine.............$ 14.18

Motor Grader, Fine Grade....$ 18.51

Motor Grader, Rough.........$ 14.63

Pavement Marking Machine....$ 19.17

Reclaimer/Pulverizer........$ 12.88

Roller, Asphalt.............$ 12.78

Roller, Other...............$ 10.50

Scraper.....................$ 12.27

Spreader Box................$ 14.04

Trenching Machine, Heavy....$ 18.48

Servicer.........................$ 14.51

Steel Worker

Reinforcing.................$ 14.00

Structural..................$ 19.29

TRAFFIC SIGNAL INSTALLER

Traffic Signal/Light Pole

Worker......................$ 16.00

TRUCK DRIVER

Lowboy-Float................$ 15.66

Off Road Hauler.............$ 11.88

Single Axle.................$ 11.79

Single or Tandem Axle Dump

Truck.......................$ 11.68

Tandem Axle Tractor w/Semi

Trailer.....................$ 12.81

WELDER...........................$ 15.97

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be

July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .