JCGU-09-1700 AF Form 66 Attachment 8.xls

XLS spreadsheet 58 KB Posted

Attached to
PAVEMENTS IDIQ Federal contract opportunity
Solicitation number
FA3030-09-R-0006-Solicitation
Issued by
Department of the Air Force Air Education and Training Command

About this file

AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to PAVEMENTS IDIQ, newest first.
File Type Posted
Questions and Answers.docx DOCX document
P-33.pdf PDF
02577 Pavement Markings.doc DOC document
02940 Irrigation Repair.doc DOC document
02550 Microsurfacing_Slurry Seal.doc DOC document
02511 Concrete Sidewalks.doc DOC document
02932 Establish Turf.doc DOC document
P-17.pdf PDF
02225 Earthwork.doc DOC document
P-28.pdf PDF
02240 Lime Stabilized Subgrade.doc DOC document
03300 Cast in Place Concrete.doc DOC document
P-19.pdf PDF
P-21.pdf PDF
03320 Portland Concrete Cement_ Full Depth Rpr.doc DOC document
P-27.pdf PDF
P-24.dwg DWG drawing
P-20.pdf PDF
P-6.pdf PDF
02598 Cold Milling.doc DOC document
P-3.pdf PDF
01010 General Requirements.doc DOC document
P-5.pdf PDF
02720 Storm Drainage.doc DOC document
P-10.pdf PDF
CS2.pdf PDF
P-8.pdf PDF
02125 Full Depth Recycling.doc DOC document
02555 Bitum 1_2 Surface Treatments.doc DOC document
P-25.pdf PDF
P-30.pdf PDF
01540 2009 Green Purchasing.doc DOC document
03330 Exposed Aggregate.doc DOC document
P-29.pdf PDF
P-13.pdf PDF
02558 Tack Coat.doc DOC document
P-31.pdf PDF
P-1.pdf PDF
02559 Prime Coat.doc DOC document
CS1.pdf PDF
P-15.pdf PDF
P-34.pdf PDF
02222 Excavation.doc DOC document
02110 Removals and Reinstall.doc DOC document
P-12.pdf PDF
P-18.pdf PDF
P-22.pdf PDF
P-16.pdf PDF
P-11.pdf PDF
INSURANCE CERTIFICATE Attachment 4.doc DOC document
Show all 50

PAVEMENTS IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER: JCGU 09-1700-XPROJECT TITLE: Base Pavements IDIQSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Section 01010, 2.1.1.5, Traffic Control/Maintenance Schedule4bGA
2Section 01010, 2.1.1.6, Utilty Outage Plan4eGA
3Section 01010, 2.2, Construction Schedule4bGA
4Section 01010, 4.2, Accident Prevention Plan4aFIO
5Section 01010, 4.4, Radiation Permit4a/bGA
6Section 01010, 4.5, Confined Space Plan4eFIO
7Section 01010, 7, Storage Area4bGA
8Section 01010, 12.1, As-Builts4d/eGA
9Section 01010, 12.1.2, DD Form 13544d/eGA
10Section 01010, 15, Warranties4dFIO
11Section 01020, 2.1, Work Clearance Request, AF Form 1034bGA
1201020, Para 3.3, Customer Service Inspection Checklist4dGA
13Section 01020, 4, Fire Hydrant Use Request4b/eFIO
14Section 01400, 2.4, SWPPP4bGA
15Section 01400, 3.3 & 6.1, Hazardous Wastes MSDS4bGA
16Section 01400, 2.3, 2.4, NOI/NOT4bFIO
17Section 01400, 2.6, Air Quality Report4b/eGA
18Section 01400, 3.4, Disposal of Waste4bGA
19Section 01400, 4, Pollution Control Training4bGA
20Section 01400, 5, Reports4bFIO
21Section 01400, 6, EMS Awareness Training4bGA
22Section 01400, 7, EPCRA Information4bFIO
23Section 01400, 7.1, 7.2 EPCRA, HazMat4bFIO
24Section 01400, 9.1, 9.2, 10.1, Notification to State4bFIO
25Section 01400, 12, AF-EMIS Authorization Request Works and Construction Waste Management Form4bFIO
26Section 01540, 1.3.1, Affirmative Procurement Reporting Form4aGA
27Section 01540, 1.3.2, Manufacturer Data, Certificates, & Samples4aFIO
28Section 02050, 1.3.1, Demolition Work Plan4bGA
29Section 02050, 1.3.2, Procedures for Removal of Asbestos4bGA
30Section 02110, 2.1, 2.2, 2.3 Crack Sealant Material Data4bGA
31Section 02125, 1.4, Mix Design4bFIO
32Section 02222, 1.3, Test Reports & Certificates4eGA
33Section 02222, 1.3, Location of Stockpile Area4bFIO
34Section 02240, 1.6, Test Reports4eGA
35Section 02241, 1.4, 1.7, Test Reports, Results and Records4eGA
36Section 02310, Para 1.2, Sampling and Testing4eGA
37Section 02511, Para 1.3, Test Reports4dGA
38Section 02511, Para 1.3, Records4dGA
39Section 02511, Para 1.3, Material Data/Certificates of Compliance4bFIO
40Section 02511, Para 1.3, Concrete Mix Design4bFIO
41Section 02550, 1.2, Test Reports and Records4eGA
42Section 02551, 1.3 & 1.8, Records, Sampling/Testing4eGA
43Section 02555, 1.2, Records4eGA
44Section 02555, 3.2, Manufacturer's Test Reports4dGA
45Section 02558, 1.2, Test Results and Records4eGA
46Section 02559, 1.2, Test Reports and Records4eGA
47Section 02577, 1.2.1, Paint4bGA
48Section 02577, 1.2.2, Pavement Markers4bGA
49Section 02720, 1.2, Product Material4bGA
50Section 02940, 1.2, Site Plan and Product Data4bGA
51Section 03200, 1.2.1, Detail Drawings4bGA
52Section 03300, 1.2, Concrete Mix, Test Results, Certificate of Compliance4b,dGA
53Section 03320, 1.2, Test Reports & Records4eGA
54Section 03330, Para 1.2, Sampling and Testing4dGA
55Section 03450, Para 1.4, Calculations/Mix Design/ Detailed Drawings4bGA
56Section 03450, Para 1.4, Test Reports4dGA
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract
(b) No Later Than 7 Calendar Days after Task Order NTP
(c) Prior to Final Inspection of Task Order
(d) Final Inspection of Task Order
(e) As Required per Specifications or Task Order

&CPAGE &P OF &N

&CFORM66.xls

Sheet2

&A Page &P

File details come from the government source that posted it. Updated .