03330 Exposed Aggregate.doc

DOC document 31 KB Posted

Attached to
PAVEMENTS IDIQ Federal contract opportunity
Solicitation number
FA3030-09-R-0006-Solicitation
Issued by
Department of the Air Force Air Education and Training Command

About this file

Specifications - 03330 Exposed Aggregate

View the file

Other files for this federal contract opportunity

Other files attached to PAVEMENTS IDIQ, newest first.
File Type Posted
Questions and Answers.docx DOCX document
02241 Stable Aggergate Base Cource.doc DOC document
FA3030-09-R-0006-0001.doc DOC document
P-33.pdf PDF
02577 Pavement Markings.doc DOC document
02940 Irrigation Repair.doc DOC document
02550 Microsurfacing_Slurry Seal.doc DOC document
02511 Concrete Sidewalks.doc DOC document
02932 Establish Turf.doc DOC document
P-17.pdf PDF
02225 Earthwork.doc DOC document
P-28.pdf PDF
02240 Lime Stabilized Subgrade.doc DOC document
P-13.pdf PDF
02558 Tack Coat.doc DOC document
P-31.pdf PDF
P-1.pdf PDF
02559 Prime Coat.doc DOC document
CS1.pdf PDF
P-15.pdf PDF
P-34.pdf PDF
02222 Excavation.doc DOC document
02110 Removals and Reinstall.doc DOC document
P-12.pdf PDF
P-22.pdf PDF
P-18.pdf PDF
P-16.pdf PDF
P-11.pdf PDF
INSURANCE CERTIFICATE Attachment 4.doc DOC document
P-7.pdf PDF
02050 Demolition.doc DOC document
PP Questionnaire Attachment 6.doc DOC document
P-14.pdf PDF
__TOC 2009.doc DOC document
Task Order Example - Attachment 5.doc DOC document
P-26.pdf PDF
03200 Reinforcement.doc DOC document
P-32.pdf PDF
P-4.pdf PDF
P-2.pdf PDF
03450 Precast Conc.doc DOC document
P-23.pdf PDF
02310 Compaction.doc DOC document
Attachment 3 - SF LLL.pdf PDF
01020 Utilities.doc DOC document
01400 New 2009 Environmental Protection.doc DOC document
P-9.pdf PDF
03300 Cast in Place Concrete.doc DOC document
P-19.pdf PDF
P-21.pdf PDF
Show all 50

PAVEMENTS IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pavements IDIQ

JCGU 09-1700

DIVISION 03 - CONCRETE

SECTION 03330 - INSTALLATION OF EXPOSED AGGREGATE

PART 1 - GENERAL:

1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. All publications shall be the latest version/edition/revision of the documents listed below, in effect on the date of this solicitation, except where a date is given.

ACI 318/318R

Building Code Requirements for Structural Concrete and Commentary

1.2 SUBMITTALS:

SAMPLING AND TESTING:

Sampling and testing will follow Specification SECTIONS 02511 and 03300.

PART 2 – PRODUCTS:

2.1 EXPOSED AGGREGATE MATERIALS:

Exposed aggregates shall be washed and graded Colorado River natural gravel. Gravel graduation shall be from 1/4” to 3/4". The aggregate shall be structurally sound, dry, and of a uniform size as possible. The aggregate shall be clean, washed aggregate free from fines that would interfere with a finished surface of uniform appearance (maximum allowable is 1 percent). Aggregate shall be rounded and free from injurious amounts of organic impurities or clay. Maximum allowable amounts of deleterious substances is 3 percent.

2.2 ACCESSORY MATERIALS:

2.2.1 Cleaning agent: As recommended by concrete manufacturer.

2.2.2 Bonding agent: As recommended by concrete manufacturer.

PART 3 – EXECUTION:

3.1 AGGREGATE EXPOSURE:

3.1.1 After concrete has been struck off and floated, evenly broadcast one-size coarse aggregate on the surface. Tamp aggregate particles into concrete until well embedded to insure being held securely during later treatment. A concrete mix design that includes the raised aggregate “Colorado River natural gravel” can be used if approved by the Contracting Officer.

3.1.2 When concrete has hardened enough to hold embedded particles firmly in place, gently broom, brush and flush excess mortar away until desired finish is obtained (appearance shall match sample panels and existing troopwalk/Goodfellow AFB standard).

3.1.3 Do not expose more than 30 percent of aggregate surface.

3.2 CURING:

The curing method and procedure should follow Specification SECTION 02511. The minimum curing period for exposed aggregate concrete shall be 7 days.

3.3 CLEANING:

When the desired finish is achieved, thoroughly wash and rinse exposed aggregate surfaces with cleaning agent recommended by manufacturer.

END OF SECTION

Section 03330 – Page 1 of 2

File details come from the government source that posted it. Updated .