Clarification on electrical and communication equipment.docx

DOCX document 20 KB Posted

Attached to
B2058 Furniture Federal contract opportunity
Solicitation number
FA301623U0325
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document provides clarification on the electrical and communication equipment requirements for a federal furniture contract solicitation from the Department of the Air Force Air Education and Training Command. The solicitation is for replacing 135 existing workstations with 177 new workstations at various expansion areas located on each floor of a building. Each new workstation will require between 6 to 7 duplex receptacles and the space has 110 electrical circuits available to support the load. Verbal confirmation has indicated the current power is sufficient but official survey results are still pending. The document seeks clarification on whether one circuit per workstation would be adequate and if the electric panels have the capacity for the additional circuits and load. All power and network connections for the workstations will be run from the raised floor space below the expansion areas. Vendors will not be responsible for any network installation work.

View the file

Other files for this federal contract opportunity

Other files attached to B2058 Furniture, newest first.
File Type Posted
Workstation.PNG PNG image
90 COS B2058 3rd Floor - With Square Footage.pdf PDF
90 COS B2058 1st Floor - With Square Footage.pptx PPTX presentation
B2058 Site visit Questions.pdf PDF
B2058 Combined Synopsis solicitation.pdf PDF
Attachment 1 SOW Furniture dated 21 Aug 23.pdf PDF
Attachment 3- Pricing Worksheet.pdf PDF
Attachment 2- Base Pass Blank Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification on electrical and communication equipment

1. Base CE has reviewed the project's electrical requirements

2. 135 existing workstations are to be removed and replaced with 177 work stations. The spec calls for 6 to 7 duplex-receptacles per station, there are 110 circuits available.

3. We are still awaiting official power survey results from Jun, We only have verbal response that current power is good

4. Is one circuit per station is adequate.

5. The electric panel serving the area have the capacity for the additional load and circuits?

6. The electric room for each of the expansion areas are located in the same room for each floor.

7. All power will be coming from the raised floor below.

8. Vendors are not responsible for any network connections.

File details come from the government source that posted it. Updated .