Questions and Answers 3-17 (Answered) CAC Locks.pdf
PDF 465 KB Posted
- Attached to
- CAC Door Lock Access Control System & Install Bldg 127 JBSA Lackland Federal contract opportunity
- Solicitation number
- FA301621Q0034
About this file
This document contains questions and answers regarding solicitation number FA301621Q0034 for a CAC Door Lock Access Control System and Installation at Building 127 at Joint Base San Antonio Lackland. The solicitation requests quotes for installing a CAC-enabled door lock access control system utilizing Schlage AD-400 series locking hardware. Questions address technical specifications such as ceiling types, equipment room locations, network connectivity requirements, credentials format, and training. Responses provide details including confirming space for network switches and access control panels, specifying use of fiber between switches, and requiring one workstation for access control system management to be located in room C109.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation -Amendment 3 FA301621Q0034 Final.pdf | ||
| Attachment 1 Addendum 3-SOW CAC Locks.pdf | ||
| Solicitation -Amendment 2 FA301621Q0034 Final.pdf | ||
| Attachment 1 Addendum 2-SOW CAC Locks.pdf | ||
| Questions and Answers 87-97 (Answered) CAC Locks.pdf | ||
| CAC replacement images.pdf | ||
| B127 Door Lock layout.pdf | ||
| Questions and Answers 18-86 (Answered) CAC Locks.pdf | ||
| Attachment 1 Addendum 1-SOW CAC Locks.pdf | ||
| Questions and Answers 18-86 (Unanswered) CAC Locks.pdf | ||
| Questions and Answers 3-17 (Unanswered) CAC Locks.pdf | ||
| Solicitation -Amendment 1 FA301621Q0034 Final.pdf | ||
| Questions and Answers-CAC Locks Question 1-2.pdf | ||
| Questions and Answers-CAC Locks Question 1 .pdf | ||
| Solicitation - FA301621Q0034 Final.pdf | ||
| Attachment 1-SOW CAC Locks.pdf | ||
| Questions and Answers-CAC Locks.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
502 CONS/JBKAE FA301621Q0034
JBSA Lackland, TX CAC Enabled Door Locks
QUESTIONS & ANSWERS 3-17
Cut-off date for contractor questions is 2:00 PM CST, 18 February 2021.
Question 3: What type of ceiling materials is used on the 1st, 2nd, and 3rd floor? (Sheetrock, dropped ceiling tile, concrete, etc.)
Government Response: Dropped ceiling tiles and concrete – depending on location.
Question 4: In which room will the head-end equipment be installed for the Access Control system
(Mechanical Room? Communications Room?, etc.) and on which floor? (i.e. 2nd floor mechanical room)
Government Response: C109 (current location of preexisting equipment)
Question 5: Is there an existing pipe chase between each of the floors?
Government Response: Yes – through communications rooms on each floor
Question 6: Will JBSA Lackland provide network connectivity to a secure network to allow for
FICAM/PIV verification at the Federal Bridge? (only if PIV class verification is required)
Government Response: No, the Wi-Fi for the locking system will not touch the base network.
Question 7: IS CSEIP certification required in order to certify the contractor supplied network?
Government Response: Yes.
Question 8: Does the site have a preferred method with respect to locking hardware on the door, is there a specific model number that the site would like to use on each opening.
Government Response: Schlage AD-400 series.
Question 9: Is there space to mount new network switches to create the independent security network?
Government Response: Yes. Space exists in room C109 and Comms room on each floor.
Question 10: Does the site have a network switch part number they would prefer to use? i.e. Cisco /
Juniper? Model of network switch?
Government Response: Cisco. Unknown.
Question 11: Does the site have a preference to network media (fiber or ethernet) between the switches?
Government Response: Please see page 6, para 10 of the statement of work.
Question 12: Is the ceilings made up of hard drywall ceilings or drop tile ceilings? Accessibility for cabling to each door opening?
502 CONS/JBKAE FA301621Q0034
JBSA Lackland, TX CAC Enabled Door Locks
Government Response: Hard drywall
Question 13: Is there a preferred model number of card reader that the site would like to use?
Government Response: No
Question 14: What tis the format of the existing credential to be used for card access? Does the RFQ require additional credentials, if so how many?
Government Response: please see page 4, para 3.5.
Question 15: Will the site require new workstations / workstations for management of the software
(Access Control System) centrally? If so how many workstations?
Government Response: One workstation to be located in C109.
Question 16: Does the site operator level training for the site staff?
Government Response: Training will be required on the new hardware and software systems.
Question 17: Is there wall space centrally on each floor to house the new Access Control panels and power supplies?
Government Response: Yes.