Atch_6,_Cost_Estimate_Breakdown.xls
XLS spreadsheet 133 KB Posted
- Attached to
- Repair Hangar 16 Federal contract opportunity
- Solicitation number
- FA3016-17-R-0052
About this file
Attachment 6, Cost Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3016-17-R-0052_Amendment_0002,_Revise_Section_L_signed.pdf | ||
| Atch_1_SOW__11July2017.pdf | ||
| Atch_15,_Spec_03_3543_Diamond_Polishing_Concrete_Floors.doc | DOC document | |
| Atch_14_Existing_Drawings.zip | ZIP file | |
| FA3016-17-R-0052_Amendment_0001.pdf | ||
| FA3016-17-R-0052_Hangar_16_Renovations_QA.docx | DOCX document | |
| Atch_1,_Statement_of_Work.pdf | ||
| Atch_9_Progress_Schedule.xlsx | XLSX spreadsheet | |
| RFP_FA3016-17-R-0052.pdf | ||
| Atch_12_-_DD_Form_1354.pdf | ||
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document | |
| Atch_7,_AETC_Form_47.pdf | ||
| Atch_8,_HAZMAT_Letter.pdf | ||
| Appendix_A,_Specifications.zip | ZIP file | |
| Atch_10_Local_Information.pdf | ||
| Atch_13,_HAZMAT_Report.pdf | ||
| Atch_11,_Project_Location.pdf | ||
| Atch_2_Wage_Determination.pdf | ||
| Atch_3_Base_Access_Request.pdf | ||
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | FA3016-17-R-0052, Attachment 6 | ||||||||||
| CONTRACTOR | ADDRESS | ||||||||||
| Line Items Subtotal | $0.00 | ||||||||||
| Labor Burden | $0.00 | ||||||||||
| Subtotal | $0.00 | ||||||||||
| ITEMS LISTED MAY NOT BE ALL INCLUSIVE AND ARE FOR REFERENCE ONLY | RSMeans San Antonio, TX CCI | $0.00 | |||||||||
| Overhead | $0.00 | ||||||||||
| Profit | $0.00 | ||||||||||
| Bonding | $0.00 | ||||||||||
| Contingency | $0.00 | ||||||||||
| CONTRACT FOR (Work to be performed) | Proposed Total Project Price | $0.00 | |||||||||
| Repair-General Repairs, Aircraft Maintenance H16 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| TYMX150023 | |||||||||||
| LINE NO. | ITEM DESCRIPTION | UNIT OF MEASURE | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE |
TOTAL
| QUANTITY | UNIT | TOTAL | Crew | Man-hours | Average Rate | TOTAL | UNIT | TOTAL | UNIT | TOTAL | ||||
| 1 | 01-11-31-30-0200 Engineering fees, electrical, minimum | Contrct | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 2 | 01-11-31-30-1000 Engineering fees, mechanical, plumbing and HVAC, minimum | Contrct | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3 | 01-21-53-50-0500-M Factors, cost adjustments, add to construction costs for particular job requirements, cut and patch to match existing construction, add, minimum | Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 4 | 01-21-53-50-0500-M Factors, cost adjustments, add to construction costs for particular job requirements, cut and patch to match existing construction, add, minimum | Costs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 5 | 01-31-13-20-0160 Field personnel, general purpose laborer, average | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 6 | 01-31-13-20-0200 Field personnel, project manager, average | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 7 | 01-31-13-20-0240 Field personnel, superintendent, minimum | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 8 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 9 | 01-45-23-50-1500 Testing and inspecting services, concrete testing, cement, physical tests, ASTM C 150 | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 10 | 01-51-13-80-0360 Temporary utilities, lighting, lamps, wiring, outlets, 40,000 S.F. building, 16 strings | CSF Flr | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 11 | 01-54-16-50-0100 Weekly forklift crew, all-terrain forklift, 45' lift, 35' reach, 9000 lb. capacity | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 12 | 01-54-26-50-2200 Swing staging, move swing staging, setup and remove | Move | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 13 | 01-54-33-40-0170-4 Rent per month for general equipment rental, without operators, aerial lift, telescoping boom to 40' high, 500 lb. capacity, diesel | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 14 | 01-54-33-40-0170-4 Rent per month for general equipment rental, without operators, aerial lift, telescoping boom to 40' high, 500 lb. capacity, diesel | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 15 | 01-54-33-40-6410-4 Rent per month for general equipment rental, without operators, toilet, portable chemical | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 16 | 01-54-33-40-6430-4 Rent per month for general equipment rental, without operators, toilet, fresh water flush, garden hose | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 17 | 01-56-16-10-1080 Dust barriers, temporary, dust partition, 6 mil polyethylene, 2" x 4" frame | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 18 | 01-74-13-20-0020 Cleaning up, after job completion, allow, minimum | Job | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 19 | 01-74-13-20-0052 Cleaning up, cleanup of floor area, continuous, per day, during construction | M.S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 20 | 01-74-13-20-0100 Cleaning up, cleanup of floor area, final by General Contractor at end of job | M.S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 21 | 01-91-13-50-0100 Building commissioning, including design intent, performance verification and training, basic building commissioning, minimum | % | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 22 | 01-93-13-03-1050 Concrete facilities maintenance, sealing concrete floor, spray, oil or urethane base, 2 coats | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 23 | 01-93-13-15-0870 Mechanical facilities maintenance, ductwork, clean, rectangular, 16" | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 24 | 01-93-13-15-0870 Mechanical facilities maintenance, ductwork, clean, rectangular, 16" | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 25 | 02-03-35-16-30-2400-C Finishing floors, heavy duty, floor hardener, heavy service | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 26 | 02-03-35-43-10-0120-C Removal of pre-existing coatings, paint, epoxy, 1 coat | M.S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 27 | 02-03-35-43-10-0620-C Polished concrete floors, polishing and edging, 1500 grit diamond | M.S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 28 | 02-41-19-19-0800 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 30 C.Y. capacity, 7 tons | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 29 | 02-41-19-19-0800 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 30 C.Y. capacity, 7 tons | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 30 | 02-41-19-19-0840 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 40 C.Y. capacity, 10 tons | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 31 | 02-41-19-19-0840 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Dumpster, weekly rental, includes one dump per week, 40 C.Y. capacity, 10 tons | Week | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 32 | 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 33 | 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 34 | 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 35 | 02-41-19-19-0910 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, delivery, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 36 | 02-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 37 | 02-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 38 | 02-41-19-19-0920 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, haul, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 39 | 02-41-19-19-0940 Selective demolition, rubbish handling, the following are to be added to the demolition prices, dumpster, alternate pricing for dumpsters, rent per month, average for all sizes | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 40 | 02-41-19-19-2000 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Load, haul, dump and return, 0' to 50' haul, hand carried | C.Y. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 41 | 02-41-19-19-3040 Selective demolition, rubbish handling, the following are to be added to the demolition prices. Loading and trucking, including 2 mile haul, hand loading truck, 50' haul | C.Y. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 42 | 02-41-19-20-0100 Selective demolition, dump charges, typical urban city, tipping fees only, building construction materials | Ton | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 43 | 02-42-C Relocate Tire Equipment | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 44 | 02-43-13-13-0020 Building relocation, one day move, up to 24' wide, reset on existing foundation | Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 45 | 02-81-20-10-1270 Hazardous waste cleanup, pickup and disposal, transportation to disposal site, truckload = 80 drums or 25 C.Y. or 18 tons, maximum | Mile | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 46 | 02-82-13-41-0200 Asbestos abatement equipment, equipment and supplies, buy, air filtration device, 2000 CFM | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 47 | 02-82-13-41-2570 Asbestos abatement equipment, equipment and supplies, buy, glove bag, 7 mil, 50" x 64" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 48 | 02-82-13-41-3050 Asbestos abatement equipment, equipment and supplies, buy, HEPA vacuum for work area, maximum | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 49 | 02-82-13-41-6300 Asbestos abatement equipment, equipment and supplies, buy, disposable fiber drums, 3 C.F. | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 50 | 02-82-13-41-6500 Asbestos abatement equipment, equipment and supplies, buy, negative air machine, 1,800 CFM | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 51 | 02-82-13-42-0100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 52 | 02-82-13-42-0400 Preparation of asbestos containment area, personnel decontamination chamber, 2" x 4" @ 16", 3/4" plywood each side | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 53 | 02-82-13-43-0600 Bulk asbestos removal, includes disposable tools and 2 suits and 1 respirator filter per day per worker, pipe insulation, air cell type, up to 4" diameter pipe | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 54 | 02-82-13-45-1000 OSHA testing, cleaned area samples | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 55 | 02-82-13-46-2500 Decontamination of asbestos containment area, fine clean exposed substrate, wet wipe substrate | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 56 | 02-82-13-46-9000 Decontamination of asbestos containment area, final cleaning of protected surfaces | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 57 | 02-83-19-23-0320 Encapsulation of lead-based paint, miscellaneous, brick, block or concrete, spray | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 58 | 02-83-19-23-0330 Encapsulation of lead-based paint, miscellaneous, steel, flat surfaces and tanks, to 12" | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 59 | 02-83-19-23-0340 Encapsulation of lead-based paint, miscellaneous, steel, beams, brushwork | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 60 | 02-83-19-26-4400 Removal of lead-based paint, by chemicals, per application, pipes, to 4" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 61 | 03-03-35-29-35-0200-C Control joints, remove existing sealant, blow construction debris out of control joint | LF | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 62 | 03-03-35-29-35-0200-C Control joints, remove existing sealant, blow construction debris out of control joint | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 63 | 03-03-35-29-35-0320-C Control joints, joint sealant, backer rod, polyethylene, 3" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 64 | 03-03-35-29-35-0380-C Control joints, joint sealant, polyurethane, 3" x 1/2" (154 L.F. per gallon) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 65 | 03-81-13-50-0400 Concrete floor and/or slab cutting, includes blade cost, layout and set-up time, saw cut concrete slabs, mesh reinforcing, up to 3" deep | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 66 | 03-81-13-50-0400-0420 Concrete floor and/or slab cutting, each additional inch of depth (Modified using 03-81-13-50-0420) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 67 | 04-02-82-13-45-0110-C OSHA testing, certified technician, maximum | Day | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 68 | 04-02-82-13-45-1100-C OSHA testing, cleaned area samples, PCM air sample analysis, NIOSH 7400, minimum | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 69 | 04-02-83-19-26-6620-1-C TCLP LBP & Disposal | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 70 | 04-05-05-10-0340 Selective demolition, concrete block walls, unreinforced, 10" thick | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 71 | 04-27-10-30-0250 Brick walls, includes mortar, 3% brick waste and 25% mortar waste, excludes scaffolding, horizontal reinforcing, vertical reinforcing and grout, common brick, 12" thick wall, 20.25 br | M | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 72 | 04-32-17-23-13-0200-C Painted pavement markings, waterborne, white or yellow, 6" wide | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 73 | 04-43-10-60-3050 Marble, shower or toilet partitions, 7/8" thick partitions, 3/4" or 1-1/4" thick stiles, polished 2 sides, average | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 74 | 07-42-13-20-0100 Aluminum siding panels, corrugated, on steel framing, .019 thick, painted | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 75 | 08-05-05-10-0500 Selective demolition doors, doors, interior, 1-3/8" thick, single, 3' x 7' high | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 76 | 08-05-05-10-2200 Selective demolition doors, frames, including trim, wood | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 77 | 08-12-13-13-0025 Standard hollow metal frames, steel, knock down, 16 gauge, up to 5-3/4" jamb depth, 6'-8" high, 3'-0" wide, single | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 78 | 08-12-13-13-0025-4900 Standard hollow metal frames, for welded frames, add (Modified using 08-12-13-13-4900) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 79 | 08-12-13-13-1000 Standard hollow metal frames, steel, knock down, 16 gauge, up to 4-7/8" deep, 7'-0" high, 3'-0" wide, single | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 80 | 08-71-20-30-0020 Door closers, adjustable backcheck, multiple mounting, standard, regular arm | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 81 | 08-71-20-50-1600 Door stops, door bumper, floor type, aluminum | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 82 | 08-71-20-55-0500 Push-pull plates, push plate, .050 thick, bronze, 4" x 16" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 83 | 08-71-20-90-1430 Hinges, full mortise, high frequency, brass base, 4-1/2" x 4-1/2", US10 | Pr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 84 | 08-71-20-95-0550 Kick plates, bronze, .050", 10" x 34" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 85 | 08-83-13-10-0200 Mirrors, no frames, wall type, 1/4" plate glass, polished edge, over 5 S.F. | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 86 | 08-83-13-10-2000 Mirrors, float glass, 1/4" thick, stock sizes, one way transparent | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 87 | 09-05-05-10-0240 Selective demolition, ceilings, ceiling, drywall, on suspension system, including system | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 88 | 09-05-05-10-1120 Selective demolition, ceilings, plaster, gypsum, on metal lath | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 89 | 09-05-05-10-1200 Selective demolition, ceilings, suspended ceiling, mineral fiber, 2' x 2' or 2' x 4' | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 90 | 09-05-05-20-0900 Selective demolition, flooring, vinyl composition tile, 12" x 12" | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 91 | 09-05-05-30-1000 Selective demolition, walls and partitions, drywall, nailed or screwed, one layer | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 92 | 09-05-05-30-3820 Selective demolition, walls and partitions, toilet partitions, metal or plastic | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 93 | 09-05-05-30-9000 Selective demolition, walls and partitions, minimum labor/equipment charge | Job | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 94 | 09-21-16-33-7600 Partition wall, stud wall, 8' to 12' high, 5/8", interior, gypsum board, fire and water resistant, two layers, 2 hour, tape and finish both sides, installed on and including, metal st | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 95 | 09-26-13-20-5600 Blueboard, for use with thin coat plaster application, 5/8" thick, on beams, columns, or soffits, with thin coat plaster finish | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 96 | 09-28-13-10-0200 Cementitious backerboard, cementitious backerboard, on wall, 3' x 6' x 5/8" sheets | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 97 | 09-29-10-30-2050-5270 Gypsum board, for textured spray, add (Modified using 09-29-10-30-5270) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 98 | 09-29-10-30-2090 Gypsum board, on walls and ceilings, nailed or screwed to studs, 5/8" thick, on walls, standard, with compound skim coat, level 5 finish | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 99 | 09-29-10-30-2090-5350 Gypsum board, for finishing inner corners, add (Modified using 09-29-10-30-5350) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 100 | 09-29-10-30-2090-5355 Gypsum board, for finishing outer corners, add (Modified using 09-29-10-30-5355) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 101 | 09-29-10-30-2250 Gypsum board, on walls and ceilings, nailed or screwed to studs, 5/8" thick, on walls, water resistant, taped and finished, level 4 finish | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 102 | 09-30-13-10-2700 Ceramic tile, bullnose trim, 2" x 6" bullnose trim, mud set | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 103 | 09-30-13-10-5400 Ceramic tile, walls, interior, thin set, 4-1/4" x 4-1/4" tile | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 104 | 09-30-13-10-5400-7000 Ceramic tile, for epoxy grout, 1/16" joints, 4-1/4" tile, add (Modified using 09-30-13-10-7000) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 105 | 09-30-16-10-0900-2200 Quarry tile, for epoxy grout & mortar, 6" x 6" x 1/2", add (Modified using 09-30-16-10-2200) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 106 | 09-51-23-10-1150 Suspended acoustic ceiling tiles, excluding suspension system, mineral fiber tile, lay-in, 2' x 2' or 2' x 4', 5/8" thick, tegular, fine textured | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 107 | 09-51-23-10-1165 Suspended acoustic ceiling tiles, excluding suspension system, mineral fiber tile, lay-in, 2' x 2' or 2' x 4', 3/4" thick, fine textured | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 108 | 09-51-23-10-1165 Suspended acoustic ceiling tiles, excluding suspension system, mineral fiber tile, lay-in, 2' x 2' or 2' x 4', 3/4" thick, fine textured | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 109 | 09-68-05-11-0117 Flooring transition strip, clamp down brass divider, 12' strip, vinyl to hard surface | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 110 | 09-91-13-60-1400 Siding exterior, alkyd, oil base, stucco, rough, paint two coats, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 111 | 09-91-13-60-1400-8100 Siding exterior, for work over 12' high, from pipe scaffolding, add (Modified using 09-91-13-60-8100) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 112 | 09-91-23-33-1400 Doors and windows, interior, alkyd, oil base, flush door and frame, 3' x 7', brushwork, stain, brushwork, wipe off | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 113 | 09-91-23-33-1800 Doors and windows, interior, alkyd, oil base, flush door and frame, 3' x 7', brushwork, varnish, three coats, brushwork, sand after 1st coat | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 114 | 09-91-23-72-0240 Walls and ceilings, interior, concrete, drywall or plaster, latex, primer or sealer coat, smooth finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 115 | 09-91-23-72-0240 Walls and ceilings, interior, concrete, drywall or plaster, latex, primer or sealer coat, smooth finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 116 | 09-91-23-72-0240-1800 Walls and ceilings, interior, for ceiling installations, add (Modified using 09-91-23-72-1800) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 117 | 09-91-23-72-0340 Walls and ceilings, interior, concrete, drywall or plaster, latex, primer or sealer coat, sand finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 118 | 09-91-23-72-0840 Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, smooth finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 119 | 09-91-23-72-0840 Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, smooth finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 120 | 09-91-23-72-0840 Walls and ceilings, interior, concrete, drywall or plaster, latex, paint two coats, smooth finish, roller | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 121 | 09-91-23-72-0840-8400 Walls and ceilings, interior, for light textured surfaces, add (Modified using 09-91-23-72-8400) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 122 | 09-91-23-72-0840-8400 Walls and ceilings, interior, for light textured surfaces, add (Modified using 09-91-23-72-8400) | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 123 | 09-96-56-20-0100 Wall coatings, acrylic glazed coatings, matte | S.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 124 | 10-21-13-40-0800 Stone toilet compartments, cubicles, floor and ceiling anchored, marble | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 125 | 10-21-13-40-0800-1400 Stone toilet compartments, for handicap units, including 52" grab bars, add (Modified using 10-21-13-40-1400) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 126 | 10-21-13-40-2400 Stone toilet compartments, cubicles, floor mounted, headrail braced, marble | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 127 | 10-21-13-40-2400-2900 Stone toilet compartments, for handicap units, including 52" grab bars, add (Modified using 10-21-13-40-2900) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 128 | 10-21-13-40-5700 Stone toilet compartments, urinal screen, 18" wide, pilaster, flush, marble | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 129 | 10-21-13-40-9000 Stone toilet compartments, minimum labor/equipment charge | Job | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 130 | 10-28-13-13-4300 Commercial toilet accessories, robe hook, single, regular | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 131 | 10-28-13-13-5000 Commercial toilet accessories, soap dispenser, recessed stainless steel, liquid | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 132 | 10-28-13-13-6050 Commercial toilet accessories, toilet seat cover dispenser, stainless steel, surface mounted | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 133 | 10-28-13-13-6200 Commercial toilet accessories, toilet tissue dispenser, surface mounted, stainless steel, double roll | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 134 | 10-28-13-13-6800 Commercial toilet accessories, towel dispenser, stainless steel, flush mounted, recessed | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 135 | 10-28-13-13-8100 Commercial toilet accessories, waste receptacles, stainless steel, with top, 36 gallon | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 136 | 11-30-15-23-6950 Water heaters, electric, glass lined, 30 gallon, maximum | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 137 | 11-C New Door way from Production Office to Tool Room | Ea | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 138 | 11-C 20'x20' Mudular Office building | Ea | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 139 | 12-32-23-30-8000 Manufactured wood casework vanities, vanity bases, two doors, 30" high, 21" deep, 24" wide | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 140 | 22-05-05-10-0760 Plumbing demolition, cleanouts and drains, up thru 4" pipe diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 141 | 22-05-05-10-1220 Plumbing demolition, fixtures, including 10' piping, lavatory, counter top | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 142 | 22-05-05-10-1300 Plumbing demolition, fixtures, including 10' piping, sink, single compartment | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 143 | 22-05-05-10-1400 Plumbing demolition, fixtures, including 10' piping, water closet, floor mounted | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 144 | 22-05-05-10-1520 Plumbing demolition, fixtures, including 10' piping, urinal, wall mounted | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 145 | 22-05-05-10-1900 Plumbing demolition, piping fittings, single connection, up thru 1-1/2" diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 146 | 22-05-05-10-1900 Plumbing demolition, piping fittings, single connection, up thru 1-1/2" diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 147 | 22-05-05-10-1980 Plumbing demolition, pipe hanger or support removal | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 148 | 22-05-05-10-1980-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 149 | 22-05-05-10-2160 Plumbing demolition, plastic pipe with fittings, up thru 1-1/2" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 150 | 22-05-05-10-2174 Plumbing demolition, prison fixtures, urinal or water closet | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 151 | 22-05-05-10-3120 Plumbing demolition, tanks, water heaters and liquid containers, 50 thru 120 gallons | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 152 | 22-05-76-20-5120 Cleanout tees, plastic, tees and adapters, PVC, DWV, cleanout plug, 4" pipe size | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 153 | 22-07-19-10-0285 Piping insulation, insulated protectors, ADA, for exposed piping under sinks or lavatories, vinyl coated foam, velcro tabs, tailpiece offset, wheelchair, 1-1/4" pipe size | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 154 | 22-07-19-30-2072 Piping insulation protective jacketing, PVC, PVC, white, fitting covers, size is based on OD of insulation, 90° elbow fitting, 3" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 155 | 22-07-19-30-4144 Piping insulation protective jacketing, PVC, PVC, white, mechanical grooved fitting cover, including insert, size is based on OD of insulation, 45° elbow fitting, 3" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 156 | 22-11-13-23-1120 Pipe and/or tube, copper, solder joints, type K tubing, couplings and clevis hanger assemblies, 10' O.C., 3/8" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 157 | 22-11-13-23-1120-1440 Pipe and/or tube, copper, for silver solder, add (Modified using 22-11-13-23-1440) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 158 | 22-11-13-23-5384 Pipe and/or tube, copper, solder joints, ACR tubing, type L, hard, cleaned and, capped, excluding couplings and hangers, 3/8" OD | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 159 | 22-11-13-23-5386 Pipe and/or tube, copper, solder joints, ACR tubing, type L, hard, cleaned and, capped, excluding couplings and hangers, 5/8" OD | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 160 | 22-11-13-25-0090 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, 90° elbow, 3/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 161 | 22-11-13-25-0110 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, 90° elbow, 5/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 162 | 22-11-13-25-0160 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, 90° elbow, 2" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 163 | 22-11-13-25-0290 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, 45° elbow, 5/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 164 | 22-11-13-25-0470 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, tee, 3/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 165 | 22-11-13-25-0490 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, tee, 5/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 166 | 22-11-13-25-0613 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, tee, reducing on the outlet, 3/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 167 | 22-11-13-25-0615 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, tee, reducing on the outlet, 5/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 168 | 22-11-13-25-0620 Pipe and/or tube fittings, copper, wrought, solder joints, copper x copper, tee, reducing on the outlet, 2" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 169 | 22-11-13-74-4480 Pipe, plastic, including couplings and clevis hanger assemblies, 10' O.C., 3 per 10', DWV type, PVC, schedule 40, 4" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 170 | 22-11-13-76-2840 Pipe fittings, plastic, PVC, white, schedule 40, socket joints, 90° elbow, 4" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 171 | 22-11-13-76-3260 Pipe fittings, plastic, PVC, white, schedule 40, socket joints, tee, 4" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 172 | 22-11-19-14-0120 Flexible metal hose, connectors, standard lengths, bronze braided, bronze ends, 3/8" diameter x 12" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 173 | 22-13-16-60-1140 Traps, cast iron, service weight, running P trap, excluding vent, 3" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 174 | 22-13-16-60-1150 Traps, cast iron, service weight, running P trap, excluding vent, 4" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 175 | 22-13-16-60-6720 Traps, ABS DWV P trap, solvent weld joint, 1-1/2" pipe size | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 176 | 22-13-19-13-2040 Sanitary drains, floor, medium duty, cast iron, deep flange, 7" diameter top, 2" and 3" pipe size | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 177 | 22-41-13-44-0150 Toilet seats, molded composition, white, industrial, excludes cover, open front, regular bowl | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 178 | 22-41-13-44-0150 Toilet seats, molded composition, white, industrial, excludes cover, open front, regular bowl | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 179 | 22-41-16-13-0600 Lavatories, including trim, white, vanity top, porcelain enamel on cast iron, 20" x 18" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 180 | 22-41-16-13-0600-3580 Lavatories, rough-in, supply, waste and vent for all above lavatories (Modified using 22-41-16-13-3580) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 181 | 22-41-39-10-2290 Faucets and fittings, lavatory faucet, single lever handle and pop-up drain, polished chrome | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 182 | 22-41-39-10-2290 Faucets and fittings, lavatory faucet, single lever handle and pop-up drain, polished chrome | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 183 | 22-41-39-10-6100 Faucets and fittings, stop and waste valves, bronze, angle, soldered, 1/2" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 184 | 22-41-39-10-7800 Faucets and fittings, water closet, wax gasket | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 185 | 22-41-39-10-8200 Faucets and fittings, water supply stops, polished chrome plate, angle, 3/8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 186 | 22-42-13-16-3100 Urinals, wall hung, vitreous china, with self-closing valve, siphon jet type | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 187 | 22-42-13-16-3100 Urinals, wall hung, vitreous china, with self-closing valve, siphon jet type | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 188 | 22-42-13-16-3140-3300 Urinals, rough-in, supply, waste and vent (Modified using 22-42-13-16-3300) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 189 | 22-42-13-16-3140-3300 Urinals, rough-in, supply, waste and vent (Modified using 22-42-13-16-3300) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 190 | 22-42-16-40-7000 Service sinks, service, wall, porcelain enamel on cast iron, roll rim, 22" x 18" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 191 | 22-45-16-10-1400 Eyewash safety equipment, excluding rough-in, eye wash fountain, plastic bowl, pedestal mounted | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 192 | 23-05-05-10-0400 HVAC demolition, central station air handler unit, up thru 15 ton | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 193 | 23-05-05-10-0400-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 194 | 23-05-05-10-0600 HVAC demolition, condenser, up thru 50 ton | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 195 | 23-05-05-10-1570 HVAC demolition, ductwork, metal, steel, stainless steel, fabricated | Lb. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 196 | 23-05-05-10-5110-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 197 | 23-05-05-10-5110-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 198 | 23-05-23-80-2700 Valves, steel, cast, gate valve, flanged, 300 lb., 2" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 199 | 23-05-93-10-1100 Balancing, air, subcontractor's quote including material and labor, heating and ventilating equipment, heating and ventilating unit | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 200 | 23-05-93-10-2000 Balancing, air, subcontractor's quote including material and labor, air conditioning equipment, central station | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 201 | 23-05-93-10-2500-2600 Balancing, air, for each zone over one, add (Modified using 23-05-93-10-2600) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 202 | 23-05-93-50-0140 Piping, testing, nondestructive testing, nondestructive hydraulic pressure test, isolate and one hour hold, 1" to 4" pipe, 0 to 250 L.F. | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 203 | 23-31-13-13-0120 Rectangular metal ducts, fabricated rectangular, including approximately 25% fittings, joints, supports, allowance for flexible connections and field sketches, excluding "as-built dwg | Lb. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 204 | 23-31-13-13-0500-1220 Rectangular metal ducts, for 30% fittings, includes time for detailing and installation, add (Modified using 23-31-13-13-1220) | Lb. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 205 | 23-31-13-13-0520 Rectangular metal ducts, fabricated rectangular, including approximately 25% fittings, joints, supports, allowance for flexible connections and field sketches, excluding "as-built dwg | Lb. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 206 | 23-31-13-16-5460 Round and flat-oval spiral ducts, spiral preformed, steel, galvanized, straight lengths, maximum 10" static pressure water gauge, 14" diameter, 24 gauge | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 207 | 23-31-13-16-5840 Round and flat-oval spiral ducts, spiral preformed, steel, galvanized, connector, 8" diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 208 | 23-31-13-19-2000 Metal duct fittings, fabrics for flexible connections, with metal edge | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 209 | 23-33-46-10-2600 Flexible air ducts, flexible, coated fiberglass fabric on corrosion resistant metal helix, pressure to 12" water gauge, UL-181, insulated, heavy duty, coated fiberglass fabric, 8" dia | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 210 | 23-34-13-10-1560 Axial flow HVAC fans, air conditioning and process air handling, vaneaxial, low pressure, 16,000 CFM, 5 HP | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 211 | 23-34-13-10-1560-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 212 | 23-37-13-10-2540 Diffusers, aluminum, opposed blade damper, ceiling, combination supply and return, 24" x 24" supply, 18" x 18" return | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 213 | 23-37-13-60-1040 Registers, air supply, ceiling or wall, opposed blade damper, anodized aluminum, one or two way deflection, adjustable curved face bars, 8" x 8" | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 214 | 23-37-13-60-4340 Registers, air supply, spiral pipe supply register, steel, with air scoop, 6" x 12", for 14" thru 21" diameter duct | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 215 | 23-37-23-10-1300 HVAC gravity air ventilators, including base, rotary ventilators, wind driven, galvanized, 4" neck diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 216 | 23-37-23-10-1300 HVAC gravity air ventilators, including base, rotary ventilators, wind driven, galvanized, 4" neck diameter | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 217 | 23-54-24-10-3180 Furnace components and combinations, air handler, modular, with cased evaporator cooling coil, 5 ton cooling | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 218 | 23-54-24-10-3180-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 219 | 23-54-24-10-3580 Furnace components and combinations, air handler, modular, with no cooling coil, 5 ton coil size | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 220 | 23-54-24-10-3580-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 221 | 23-54-24-10-4170 Furnace components and combinations, air handler, modular, including heater, 25 kW, 85.4 MBH | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 222 | 23-54-24-10-4170-1080 Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high (Modified using 22-01-02-20-1080) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 223 | 23-74-33-10-1210-4140 Labor adjustment factors, add to labor for working in existing occupied buildings, office building (Modified using 22-01-02-20-4140) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 224 | 23-C Additional Eshaust/Ventilation Hauralic Room | Ea | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 225 | 26-05-05-10-0100 Electrical demolition, conduit to 15' high, including fittings and hangers, rigid galvanized steel, 1/2" to 1" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 226 | 26-05-05-10-0100 Electrical demolition, conduit to 15' high, including fittings and hangers, rigid galvanized steel, 1/2" to 1" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 227 | 26-05-05-10-0100-9930 Electrical demolition, add to labor for higher elevated installation, 25' to 30' high, add (Modified using 26-05-05-10-9930) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 228 | 26-05-05-10-0220 Electrical demolition, conduit to 15' high, including fittings and hangers, electric metallic tubing (EMT), 1-1/4" to 1-1/2" | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 229 | 26-05-05-10-0310 Electrical demolition, armored cable, (BX) average 50' runs, #12, 3 wire | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 230 | 26-05-05-10-0310-9910 Electrical demolition, add to labor for higher elevated installation, 15' to 20' high, add (Modified using 26-05-05-10-9910) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 231 | 26-05-05-10-0310-9930 Electrical demolition, add to labor for higher elevated installation, 25' to 30' high, add (Modified using 26-05-05-10-9930) | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 232 | 26-05-19-90-0030 Wire, 600 volt, copper type THW, solid, #12 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 233 | 26-05-19-90-0940 Wire, 600 volt, copper type THWN-THHN, solid, #12 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 234 | 26-05-19-90-0940 Wire, 600 volt, copper type THWN-THHN, solid, #12 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 235 | 26-05-19-90-0940 Wire, 600 volt, copper type THWN-THHN, solid, #12 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 236 | 26-05-19-90-0940 Wire, 600 volt, copper type THWN-THHN, solid, #12 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 237 | 26-05-19-90-1350 Wire, 600 volt, copper type THWN-THHN, stranded, #6 | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 238 | 26-05-23-20-2460 Special wires and fittings, tray cable, type TC, copper, #16-2 conductor | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 239 | 26-05-33-14-0220 Conduit to 15' high, includes 11 couplings per 100', electric metallic tubing, 3/4" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 240 | 26-05-33-14-0220 Conduit to 15' high, includes 11 couplings per 100', electric metallic tubing, 3/4" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 241 | 26-05-33-14-0280 Conduit to 15' high, includes 11 couplings per 100', electric metallic tubing, 1-1/2" diameter | L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 242 | 26-05-90-10-2250 Residential wiring, switch devices, including box and cover plate, 20' average runs, single pole, 20 amp, #12/2, type NM (Romex) cable | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 243 | 26-27-26-20-2460 Wiring devices elements, receptacle, duplex, 120 volt, grounded, 15 amp | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 244 | 26-27-26-20-2470 Wiring devices elements, receptacle, duplex, 120 volt, grounded, 20 amp | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 245 | 26-27-26-20-3110 Wiring devices elements, wall plates, brown plastic, 1 gang | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 246 | 26-28-16-20-9050 Safety switches, disconnect switch, 600 volt, 3 pole, fusible, 60 amp, to 30 HP motor | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 247 | 26-51-13-50-0300 Interior lighting fixtures, including lamps, mounting hardware and connections, fluorescent, cool white lamps, troffer, recess mounted in grid, rapid start, acrylic lens, 2' wide x 2' | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 248 | 26-51-13-50-0300 Interior lighting fixtures, including lamps, mounting hardware and connections, fluorescent, cool white lamps, troffer, recess mounted in grid, rapid start, acrylic lens, 2' wide x 2' | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 249 | 26-51-13-55-4000 Interior LED fixtures, including lamps, mounting hardware, and connections, high bay, surface mounted, round, 150 watts | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 250 | 26-55-61-10-4000 Lights, lights, strobe light, 1 to 15 flashes per second, quartz | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 251 | 26-C Relocated Ceiling Fan | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 252 | 26-C Relocated Hoist | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 253 | 26-C Relocated Water Heater | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 254 | 27-15-13-13-7000 Communication cables, high performance unshielded twisted pair (UTP), cable, category 5, #24, 4 pair solid, PVC jacket | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 255 | 27-15-13-13-7326 Communication cables, high performance unshielded twisted pair (UTP), jack, shielded RJ-45, category 6 | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 256 | 27-15-43-13-1020 Communication outlets, excluding voice or data devices, voice or data wall plate plastic, 1 gang, 2-port | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 257 | 28-05-13-23-1650 Fire alarm communications conductors and cables, fire alarm FEP teflon 150 volt to 200°C, #22, 4 pair | C.L.F. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 258 | 28-31-23-50-5610 Alarm panels and devices, excluding wires and conduit, fire, strobe and horn (ADA type) | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 259 | 28-31-46-50-5240 Smoke detectors, excluding wires and conduit, smoke detector, ceiling type, addressable type | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 260 | 28-31-46-50-5400 Smoke detectors, excluding wires and conduit, smoke detector, duct type | Ea. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |