Atch_13,_HAZMAT_Report.pdf
PDF 3 MB Posted
- Attached to
- Repair Hangar 16 Federal contract opportunity
- Solicitation number
- FA3016-17-R-0052
About this file
Attachment 13, HAZMAT Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA3016-17-R-0052_Amendment_0002,_Revise_Section_L_signed.pdf | ||
| Atch_1_SOW__11July2017.pdf | ||
| Atch_15,_Spec_03_3543_Diamond_Polishing_Concrete_Floors.doc | DOC document | |
| FA3016-17-R-0052_Amendment_0001.pdf | ||
| Atch_14_Existing_Drawings.zip | ZIP file | |
| FA3016-17-R-0052_Hangar_16_Renovations_QA.docx | DOCX document | |
| Atch_1,_Statement_of_Work.pdf | ||
| Atch_9_Progress_Schedule.xlsx | XLSX spreadsheet | |
| Appendix_A,_Specifications.zip | ZIP file | |
| RFP_FA3016-17-R-0052.pdf | ||
| Atch_12_-_DD_Form_1354.pdf | ||
| Atch_5_Contractor_Responsibility_Questionnaire.docx | DOCX document | |
| Atch_7,_AETC_Form_47.pdf | ||
| Atch_8,_HAZMAT_Letter.pdf | ||
| Atch_10_Local_Information.pdf | ||
| Atch_11,_Project_Location.pdf | ||
| Atch_2_Wage_Determination.pdf | ||
| Atch_3_Base_Access_Request.pdf | ||
| Atch_6,_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| Atch_4__Financial_Information_Questionnaire.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Randolph AFB Asbestos Inventory Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAUAVIONICS
Facility Address: 218712 SHP A/SE STOR FCLT Asbestos:
Facility Site: BASE Facility Status Manned
Facility Type Maintenance
Facility Owner: 12 MSG/CE iiiiiiiiiillllill~!llll .. !llll.---lllllf Number of Floors: 1
Photo File Name 16.jpg
Drawing File Name: B16.tif
Facility Summary Report:
10/08/2013 = Work Order 11327 -
Date Constructed: 1931
Square Footage: 87496
1 ). Relocate Wheel and Tire Shop- All wheel and tire shop walls are NAD, NO Asbestos Detected 2). Relocate Ceiling Fans- The Ceiling Board material is NAD, No Asbestos Detected 3.) Completely Refurbish Hangar Doors - All hangar Door Window glazing is NAD, No Asbestos Detected All floor tiles tan and white with black mastic in Tool Room and Shop Stock are NAD, No Asbestos Detected
Hangar 16 Premise Upgrade Project All areas for LAN Drops are NAD, No Asbestos Detected
4. Remove walls betweenShop Stok and Tool Crib, Install Door in Production Support area. All sheetrock walls in the office and tool room areas are NAD, No Asbestos Detected.
5.) Replace broken glass- Refurbish Doors- Window Glazing in the Hangar doors is NAD, No Asbestos Detected
6. ) Replace AC and insulation over offices in center of hangar. All TSI materials is of a fiberglass material.
7.) Refurbish restrooms and add showers. The restroom sheetrock, walls are NAD, No Asbestos Detected.
08/31/2011 - Workorder 10499- Conduct Lighting Survey, Replace Hangar Lights, All ceiling Panels are NAD, No Asbestos Detected
PCB
All light fixtures must be checked for PCB Ballasts. If ballasts are not marked "NO PCBs" then ballasts must be handled as PCB Waste, or recycled at an approve EPA PCB Recycling Facility . PCB's must be packaged lAW DOT regulations and Manifested.
Recycling Certificate Required if Recycled
Light Bulbs, HID Lamps are known to contain Mercury in small amounts. All lamps must be removed from fixture packaged lAW DOT regulations and manifested to an approved EPA recycling facility or handled as Universal Waste in the State of Texas.
8/02/2011 Workorder 10449 - Upgrade NPRNET- All sheetrock materials proposed for core drilling is (NAD) No Asbestos Detected
7 Mar 11 , Workorder 80006, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)
28 Jul 09 - Hangar Door Window Glazing is NAD for ACM
15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM
FA3016-17-R-0052, Attachment 13
Asbestos Containing Material (ACM) Results:
Year ID location(s)
HSA Type Floor Sample ID Original Sample ID HSA Description Sample # Asbestos
201 3 Room - Tool
Floor - Vinyl Composite Tile
2013 Room- Tool
Floor - Vinyl Composite Tile
2013 Room- Tool
Floor - Vinyl Composite Tile
2013 Room - Tool
Floor - Vinyl Composite Tile
2013 Room- Tool
Floor - Vinyl Composite Tile
2013 Room - Tool
Floor - Vinyl Composite Tile
201 3 Room- Tool
Floor - Vinyl Composite Tile
2013 Room- Tool
Floor - Vinyl Composite Tile
201 3 Room - Tool
Floor - Vinyl Composite Tile
2013 Room- Tool
Floor • Vinyl Composite Tile
01 16-FLVCT-001-B-001
12" x 12" Tan Floor Tile: Black Mastic
01 16-FLVCT-001-B-001
12" x 12" Tan Floor Tile; Black Mastic
01 16-FLVCT-001-B-002
12" x 12" Tan Floor Tile: Black Mastic
01 16-FLVCT-001-B-002
12" x 12" Tan Floor Tile: Black Mastic
01 16-FLVCT-001-B-003
12" X 12" White with Brown Streaks: Black Mastic
01 16-FLVCT-001-B-003
12" X12" White with Brown Streaks: Black Mastic
01 16-FLVCT-001-B-004
12" X12" White with Brown Streaks: Black Mastic
01 16-FLVCT-001-B-004
12" X 12" White with Brown Streaks: Black Mastic
01 16-FL VCT -00 1-B-005
12" X 12" White with Brown Streaks: Black Mastic
01 16-FLVCT -001-B-005
12" X 12" White with Brown Streaks: Black Mastic
2013 2 Room • Shop Stock 01 16-FLVCT-002-B-001
Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic
2013 2 Room - Shop Stock 01 16-FLVCT -002-B-001
Floor . Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic
2013 2 Room - Shop Stock 01 16-FLVCT-002-B-002
Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic
201 3 2 Room - Shop Stock 01 16-FLVCT -002-B-002
Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic
2013 2 Room· Shop Stock 01 16-FLVCT .{)02-B-003
Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic 3
2013 2 Room • Shop Stock 01 16-FLVCT -002-B-003
Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile; Black Mastic
2013 2 Room - Shop Stock 01 16-FLVCT-002-B-004
Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks: Black Mastic
2013 2 Room - Shop Stock 01 16-FLVCT .{)02-B-004
Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks: Black Mastic
2013 2 Room - Shop Stock 01 16-FLVCT-002-B-005
Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks; Black Mastic
201 3 2 Room - Shop Stock 01 16-FL VCT -002-B-005
Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks; Black Mastic
L 1, NAO, Non-Fibrous 100%
L2, NAD, mastic. Non-Fibrous 100%
L2, NAD, mastic, Non-Fibrous 100%
L 1. NAD, Non-Fibrous 100%
L1 . NAD, Non-Fibrous 100%
L2. NAD, mastic. Non-Fibrous 100%
L1 . NAD, Non-Fibrous 100%
L2. NAD. mastic. Non-Fibrous 100%
L2, NAD, mastic. Non-Fibrous 100%
L 1, NAO, Non-Fibrous 100%
L 1. NAD, Non-Fibrous 1 OO%
L2, NAD, mastic, Non-Fibrous 100%
L 1. NAO, Non-Fibrous 100%
L2. NAD. mastic. Non-Fibrous 100%
L 1. NAD, Non-Fibrous 100%
L2, NAD, mastic, Non-Fibrous 100%
L 1. NAD. Non-Fibrous 100%
L2. NAD. mastic. Non-Fibrous 100%
L2. NAD, mastic. Non-Fibrous 100%
L 1. NAD. Non-Fibrous 100%
Dimension:
Floor Area:
Sample Area:
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
2012 Break room 01 16-WLSH-00 1-B-001 SF
Wall - Sheetrock East: Beige;Chalky;Gran NAD, Cellulose 5%, Fiberglass 3%. Non- 0 SF Fibrous 92%
2012 2 Office - Wheel and Tir 01 16-WLSH-002-8-001 SF
Wall - Sheetrock North: Off White:Gran NAD, Cellulose 2%. Fiberglass 2%. Non- 0 SF Fibrous 96%
2012 2 Office - Wheel and Tir 01 16-WLSH-002-B-002 SF
Wall - Sheetrock East: Off White;Gran 2 NAD. Cellulose 2%. Fiberglass 2%. Non- 0 SF F1brous 96%
2012 3 Room - Battery Shop 01 16-WLJ-003-8-001 SF
Wall - Jo1nt TapefJoint Compoud East: Off White:Gran NAD. Non-Fibrous 100% 0 SF
2012 3 Room - Battery Shop 01 16-WLJ-003-8-002 SF
Wall -Joint Tape/Joint Compoud North; Off White::Gran;Beige Adhesive 2 NAD. Non-Fibrous 100% 0 SF
2012 3 Room - Battery Shop 01 16-WLSH-003-B-003 SF
Wall - Sheetrock East: Beige;Chalky;Gran 3 NAD. Cellulose 3%, Fiberglass 3%. Non- 0 SF Fibrous 94%
2012 3 Room - Battery Shop 01 16-WLSH-003-B-004 SF
Wall - Sheetrock Northrth; Beige ;Chalky:Gran 4 NAD. Cellulose 3%, Fiberglass 3%. Non- 0 SF Fibrous 94%
2012 4 Room - Pneudralics 01 16-WLSH-004-B-001 SF
Wall - Sheetrock West: Off White;Chalky:Gran NAD, Cellulose 10%, Non-fibrous 90% 0 SF
2012 4 Room - Pneudralics 01 16-WLSH-004-B-002 SF
Wall - Sheetrock North; Off White;Chalky;Gran 2 NAD. Cellulose 3%. Fiberglass 2%. Non- 0 SF Fibrous 95%
2012 4 Room - Pneudralics 01 16-WLSH-004-B-003 SF
Wall - Sheetrock East: Off White;Chalky;Gran 3 NAD. Cellulose 3%. Fiberglass 3%, Non- 0 SF Fibrous 94%
2012 4 Room - Pneudralics 01 16-WLSH-004-8-004 SF
Wall - Sheetrock South: Off White;Chalky;Gran 4 NAD. Cellulose 5%, Fiberglass 3%. Non- 0 SF Fibrous 92%
2012 5 Room- LOX 01 16-WLSH-005- 1 SF
Wall - Sheetrock North; Pink;Chalky;Gran NAD. Cellulose 2%, Fiberglass 2%. Non- 0 lF Fibrous 96%
2012 6 Electrical Room 01 16-WlSH-006-B-001 SF
Wall - Sheetrock West: Off White:Chalky;Gran NAD, Cellulose 4%. Fiberglass 2%. Non- 0 SF Fibrous 94%
2012 7 Mezzanine 02 16-WLSH-007-B-001 SF
Wall - Sheetrock West: Beige;Chalky;Gran NAD. Cellulose 3%. Fiberglass 3%. Non- 0 SF Fibrous 94%
2012 7 Mezzanine 02 16-WLSH-007-B-002 SF
Wall - Sheetrock West: Beige;Chalky;Gran 2 NAD. Cellulose 5%. Fiberglass 2%. Non- 0 SF Fibrous 93%
2011 Hangar Interior 01 16-Clli-001-B-001 SF
Ceiling - lay-in Tile white; powdery NAD. Cellulose 15%. Non-fibrous 85% 0 SF
2011 Hangar Interior 01 16-Clli-001-B-002 SF
Cei ling - lay-in Tile white; powdery 2 NAD. Cellulose 10%, Non-fibrous 90% 0 SF
2011 Hangar Interior 01 16-ClU-001-B-003 SF
Ceiling - Lay-in Tile while; powdery 3 NAD. Cellulose 10%, Non-fibrous 90% 0 SF
2011 2 Communications Roo 02 16-WLSH-002-B-001 SF
Wall • Sheetrock East; Beige;Chalky;gran NAD. Cellulose 12%, Non-fibrous 88% 0 SF
2011 2 Communications Roo 02 16-WLSH-002-B-002 SF
Wall- Sheetrock South;; Beige;Chalky;gran 2 NAD. Cellulose 12%. Non-fibrous 88% 0 SF
2011 2 Commumcations Roo 02 16-WLSH-002-8-003 SF
Wall - Sheetrock North: Beige;Chalky;gran 3 NAD. Cellulose 12%, Non-fibrous 88% 0 SF
2011 2 Communications Roo 02 16-WLSH-002-B-004
Wall - Sheetrock West; Beige;Chalky;gran 4
2010 Room - Battery Shop 01 16-FLVCT -001-B-001
Floor - Vinyl Composite Tile 12" X 12" gray:Brown Streaks;Biack Mastic
2010 Room - Battery Shop 01 16-FLVCT-001-B-001
Floor - Vinyl Composite Tile 12" X 12" gray;Brown Streaks;Black Mastic
2010 Room - Battery Shop 01 16-FL VCT -001-B-002
Floor - Vinyl Composite Tile 12" X 12" Black;White Streaks;Gray Mastic 2
2010 Room - Battery Shop 01 16-FLVCT -001-B-002
Floor - Vinyl Composite Tile 12" X 12" Black;White Streaks;Gray Mastic 2
2010 Room - Battery Shop 01 16-FLVCT-001-B-003
Floor- Vinyl Composite Tile 12" X 12" Tan;White Streaks:Biack Mastic 3
2010 Room - Battery Shop 01 16-FLVCT-001-B-003
Floor - Vinyl Composite Tile 12" X 12" Tan:White Streaks;Biack Mastic 3
2009 Room- Production Su 16-FLVCT-001-B-001
Floor- Vinyl Composite Tile 12" x 12" White with Brown streak: Black Mastic 1
2009 Room- Production Su 16-FLVCT-001-B-001
Floor - Vinyl Composite Tile 12" x 12" White with Brown streak: Black Mastic 1
2009 Room - Production Su 16-FLVCT-001-B-001
Floor- Vinyl Composite Tile 12" x 12" White with Brown streak; Black Mastic 1
2009 2 Hangar Interior 16-WGLZ-002-B-001
VVindow Glazing Gray: Gran.
2009 2 Hangar Interior 16-WGLZ-002-B-002 VVindow Glazing Gray; Gran. 2
2009 2 Hangar Interior 16-WGLZ-002-B-003 VVindow Glazing Gray: Gran. 3
2009 2 Hangar Interior 16-WGLZ-002-B-004 VVindow Glazing Gray; Gran. 4
NAD, Cellulose 12%. Non-fibrous 88%
L2. NAD. mastic, Cellulose 5%, Non fibrous 95%
L 1, NAD, tile. Non-Fibrous 100%
L 1. NAD. tile. Non-Fibrous 100%
L2. NAD.mastic. Cellulose 2%. Non fibrous 98%
L 1, NAD.tile. Non-Fibrous 100%
L2, NAD,mastic. Cellulose 5%. Non fibrous 95%
L 1, NAD. Non-Fibrous 100%
L3. NAD. Non-Fibrous 100%
L2. NAD. Cellulose 4%. Non-fibrous 96%
NAD. Non-Fibrous 100%
NAD. Non-Fibrous 100%. Unknown
NAD. Non-Fibrous 100%
NAD. Non-Fibrous 100%
SF
0 SF
SF
SF
SF
SF
SF
SF
342 SF
342 SF
342 SF
4600 LF
4600 LF
4600 LF
4600 LF
Randolph AFB LBP Inventory Facility Number: 16 Facility Name: SHP AJSE STOR FCL T
Facility Address: 218712 SHP AJSE STOR FCL T
Facility Type AGE Maintenance
Facility Status Manned
Lead Based Paint Detected : "'
Date Constructed: 1931
Square Footage : 87496
Facility Owner: 12 MSG/CE Number of Floors: 1
Facil ity Summary Report:
A=West, B=North, C=East, D=South
Photo File Name
16.jpg
Drawing File Name:
None.dwg
LBP Report File Name(s):
2013-09-11_16_80192_Paint Flo
CEAN • Ar a Poaltlvo for LBP Contact CEAN @ 652·4668
Coordination Requtred
10/08/2013- Work Order 11327 -1 .) Relocate Wheel and Tire Shop - All areas are Negative for LBP 2.) Refurbish Hangar Doors- All Hangar Doors, Window Mullions, Door Casings are Positive for LBP throughout, North and South Side of Hangar 3.) Remove Lead Based Paint from walls -All interior Hangar Concrete Walls are Positive for LBP.
4.) Remove Walls for renovation -All offices in the Production Support area are Negative for LBP 5.) Refurbish Hangar Floor- All areas are Negative for LBP except for the West Corridor of AGE (South West Side of Hangar where the yellow lines are painted over. The yellow lines are positive for LBP.
09/09/2013 - The floor is in fair condition with some peeling. The majority of the floor is in need of repainting. Since the customer states that there will be no abrasive methods taken to paint the floor, Recommend Approval even thougt the lines that are painted over on the west side of wheel and tire are positive for LBP. Recommend approval to paint the floor as long as customer does not siturb the existing coating on the floor by any abrasive means.
08/09/2012- Work Order 11054- Remove Motor Generator- The generator has small levels of Lead Based Paint. However, the paint is intact and there should be no concerns for exposure during the removal process.
If this unit contains oil, it must be sampled for PCBs at owner's cost
1/23/2012- W0#10757 Replace internet cable CAT 6, Interior concrete walls are positive for LBP, all other areas tested are negative for LBP. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping, blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.
11/22/2011 - Workorder, Hangar 16 for Com Premise Project - All Areas analyzed are Negative for Lead Based Paint
10/20/2011 , W0#80082 Paint hangar floor, areas tested are negative for LBP.
08/09/11 - WORKORDER 10498 - Paint hangar doors Inside and out - All hangar door interior and exterior are Positive for Lead Based Paint. Do not disturb any areas that are POS for LBP by any abrasive means such as sand ing, scraping blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination will be required for this project by a certified Lead Firm
7-26-11 , W0#1 0449 Upgrade NPRNET, areas tested are negative for LBP
7/07/11 , W0#1 0419 Paint interior walls, All interior walls are positive for LBP as well as the Hangar Doors inside. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.
Lead Based Paint Samoles for Facilitv 16
Sample
Date
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/2008
8/11/20Q8
8/11/2008
8/11/2008
8/1112008
8/11/2008
8/11/2008
8111/2008
Room
HAZMAT Storage
HAZMAT Storage
HAZMA T Storage
HAZMA T Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMAT Storage
HAZMA T Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
8/11/2008 HAZMAT Storage
8/1112008 HAZMAT Storage
8/11 /2008 HAZMAT Storage
8/11/2008 HAZMAT Storage
8/11/2008
8/11 /2008
HAZMAT Storage
HAZMA T Storage
8/11/2008 HAZMAT Storage
8/11/2008 HAZMA T Storage
8/11/2008 HAZMAT Storage
8111/2008 HAZMAT Storage
8/11/2008 HAZMAT Storage
8/11/2008 HAZMAT Storage
8/11/2008
8/1112008
8/1112008
8/1112008
8/11/2008
8/11/2008
8/11/2008
8111/2008
8/11/2008
8/11/2008
3/12/2009
7nt2009
7nt2009
7nt2009
7nt2009
7nt2009
7n/2009
7nt2009
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMA T Storage
HAZMAT Storage
HAZMAT Storage
HAZMA T Storage
HAZMA T Storage
Restroom Mens
South Hangar 6
North Hangar 2
South Hangar 6
North Hangar 2
South Hangar 7
North Hangar 2
North Hangar 3
Side Quadrant
A
A
A
A
B
A
A
A
A
A
B
D
D c A
A
B
A c A
B c c D
D
A
D
B
B c c
D
D
A
A
A
A
D
D
D
B
D
B
B
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Lower
Lower
Lower
Lower
Middle
Upper
Upper
Lower
Upper
Upper
Upper
Upper
Upper
Component Substrate Color Condition
Intact
Intact
Intact
Intact
Intact
Intact
Fence Gate
Fence Picket
Fence Gate
Fence Gate
Fence Gate
Fence Picket
Wall
Wall
Wall
Post
Post
Post
Wall
Wall
Wall
Wall
Wall
Wall
Post
Wall
Wall
Wall
Post
Wall
Wall
Wall
Wall
Wall
Wall
Post
Post
Post
Post
Post
Post
Post
Post
Post
Post
Wall
Door Casing
Door
Window Mullion
Door Casing
Door Casing
Window Mullion
Door Casing
Metal
Metal
Metal
Metal
Metal
Metal
Concrete
Concrete
Concrete
Metal
Metal
Metal
Concrete
Concrete
Concrete
Concrete
Metal
Concrete
Metal
Concrete
Concrete
Metal
Metal
Concrete
Concrete
Concrete
Concrete
Concrete
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Drywall
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Red
Red
Red
Red
Red
Red
Off White Peeling
Off White Intact
Off White Intact
Brown Intact
Brown Peeling
Brown Intact
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Brown Peeling
Off White Intact
Brown Intact
Off White Intact
Off White Intact
Brown
Brown
Peeling
Peeling
Off White Intact
Off White Intact
Off White Intact
Off White Intact
Off White Intact
Brown Peeling
Brown
Brown
Brown
Brown
Brown
Brown
Brown
Brown
Brown
Red
Yellow
Peeling
Peeling
Peeling
Peeling
Peeling
Peeling
Peeling
Peeling
Peeling
Peeling
Intact
Off W hite Peeling
Brown Peeling
Off While Peeling
Off W hite Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Pb PbErr Result
0 .15 0 .03 POS
0.14 0.04 POS
0.14 O.D3 POS
0.12 0.02 POS
0.11 0.02 POS
0.1 0.02 POS
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 NEG
0 0 NEG
0 0 NEG
0 0 NEG
0.01 0 NEG
0.01 0 NEG
0 0 NEG
0 0 NEG
0 NEG
0 NEG
0 Negali
2.1 0.25 POsitiv
0.42 0.08 POsitiv
0.11 0. 1 Positiv
3.41 0.59 Positiv
1.99 0.25 Positiv
0.09 0.05 Positiv
1.86 0.2 Positiv
11 1
Date
7f712009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f712009
7f712009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f712009
7f7/2009
7f7/2009
7f7/2009
?fl/2009
7f712009
7f7/2009
7f7/2009
7f7/2009
?fl/2009
7f712009
7f7/2009
7f7/2009
7f7/2009
7f712009
7f7/2009
7f712009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f712009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
Room
South Hangar 8
South Hangar 8
North Hangar 4
North Hangar 1
North Hangar 3
North Hangar 1
North Hangar 1
North Hangar 5
South Hangar 8
North Hangar 3
South Hangar 7
North Hangar 3
North Hangar 6
North Hangar 7
North Hangar 8
North Hangar 9
North Hangar 2
North Hangar 2
North Hangar 1
North Hangar 4
North Hangar 5
North Hangar 6
North Hangar 7
North Hangar 8
North Hangar 9
North Hangar 10
North Hangar 6
North Hangar 7
North Hangar 8
North Hangar 7
North Hangar 6
South Hangar 6
North Hangar 5
North Hangar 4
North Hangar 4
North Hangar 1
South Hangar 6
North Hangar 8
North Hangar 8
South Hangar 6
South Hangar 6
North Hangar 4
North Hangar 2
North Hangar 6
North Hangar 3
North Hangar 5
Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition
D Upper Window Mullion Metal Off White Peel ing
D Upper Door Casing Metal Off White Peel ing
B
D
B
B
B
B
D
B
D
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
D
B
B
B
B
D
B
B
D
D
B
B
B
B
B
Lower
Lower
Lower
Upper
Lower
Lower
Lower
Lower
Upper
Upper
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Lower
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Door
Door
Door
Window Mullion
Door Casing
Door
Door
Door Casing
Window Mullion
Window Mullion
Door
Door
Door
Door
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door
Window Mullion
Window Mullion
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Door Casing
Window Mull ion
Window Pane
Window Pane
Window Pane
Window Mull ion
Window Pane
Window Pane
W indow Pane
Window Pane
Window Pane
Window Pane
Window Mullion
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Metal
Glass
Glass
Metal
Metal
Glass
Glass
Metal
Glass
Glass
Metal
Metal
Brown Peeling
Brown Peeling
Brown Peeling
Off White Peeling
Brown Peel ing
Brown Peel ing
Black Peeling
Brown Peeling
Off White Peeling
Off White Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Yellow Peeling
Brown Peeling
Off White Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Brown Peel ing
Brown Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Yellow Peeling
Black Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Off White Peel ing
Pb PbErr Result
0.08 0 .05 POsitiv
2.31 0.28 POsitiv
0.5 0.1 POsitiv
0.75 0.12 POsitiv
0.48 0.13 POsitiv
0.09 0.05 POsitiv
0.3 0.07 POsitiv
0.13 0 .04 POsitiv
0.53 0.11 POsitiv
0.51 0.12 POsit iv
0.13 Positiv
0.15 0.19 Positiv
0.62 0.14 POsitiv
0.68 0.12 POsitiv
0.52 0.13 POsit iv
0.68 0.15 POsitiv
0.46 0.06 POsitiv
0 .36 0.07 POsitiv
2.42 0.32 POsitiv
0.33 0.07 POsitiv
0.66 0.14 POsit iv
0.4 0.08 POsitiv
0.11 0.04 POsitiv
0.35 0.08 POsitiv
0.12 0.05 POsitiv
0.59 0.13 POsitiv
0.33 0.1 POsitiv
0.62 0.12 POsitiv
3.52 0.51 POsitiv
1.74 0.22 POsitiv
2.22 0.33 POsitiv
1.54 0.17 Positiv
1.88 0.28 POsitiv
1.81 0.2 POsitiv
0.16 0.09 POsitiv
0.01 0.01 Negati
0 0 Negati
0 0 Negati
0.05 0.03 negativ
0 0 Negati
0 0 Negati
0.01 0 Negati
0 0 Negati
0.01 0 Negati
0 0 Negati
0.04 0.02 Negati
Date
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2009
7f7/2011
7f7/201 1
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/2011
7f7/201 1
7f7/2011
15 7/26/2011
14 7126/2011
13 7/26/2011
12 7126/2011
2 10120/2011
3 10/20/2011
4 10120/2011
5 10120/2011
Room
South Hangar 6
North Hangar 5
North Hangar 7
South Hangar 8
South Hangar 8
South Hangar 7 interior interior interior interior interior mterior interior interior mterior mterior interior mterior interior
Interior
2nd floor comm
2nd floor comm
2nd floor comm
2nd floor comm interior interior mterior interior
6 10120/2011 interior
7 10120/2011 interior
8 11/22/2011 Ancillary Tng
2 11122/2011 Production Support
3 1112212011 Production Support
5 11/22/2011 Tool Rm
6 1112212011 Shop Stock N
7 1112212011 Bench Stock
16 1112212011 Battery
15 11/2212011 Battery
12 11122/2011 Wheei Tire
11 11/2212011 Personal lockers S
10 1112212011 Ancillary Tng
9 11122/2011 Ancillary Tng
4 11122/2011 Production Support
1123/2012
1123/2012
1123/2012 hallway pneudraulic shop pneudraulic shop
Lead Based Paint Samples for Facility 16 Side
D
B
B
D
D
D
A
A
D
A c c c c A
D
D
A c c A
B
D c A
A
A
A
A
A
B
B c A
B
B c B
A c D c
A c c D
Quadrant
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Lower
Right
Lower
Middle
Right
Center
Center
Left lower
Middle
Middle
Upper
Right
Upper
Upper
Upper
Upper
Lower
Lower
Middle
Right
Center
Lower
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Upper
Lower
Lower
Component Substrate
Window Pane Glass
Window Pane
Window Pane
Window Pane
Window Pane
Window Pane
Glass
Metal
Glass
Glass
Glass
Wall Concrete
Wall Concrete
Door Hangar Metal
Wall Concrete
Wall Concrete
Va ll Support Column Concrete
Wall Concrete
Wall Concrete
Wall Concrete
Door Hangar Metal
Door Hangar Metal
Vall Support Column Concrete
Wall Concrete
Door Metal
Wall
~all
Wall
Wall
Floor
Floor
Floor
Floor
Drywall
Drywall
Drywall
Drywall
Concrete
Concrete
Concrete
Concrete
Color Condition
Blue Peeling
Off White Peeling
Off White Peeling
Off White Peeling
Yellow Peeling
Orange Peeling
Off White Peeling
Brown Peeling
Off White Peeling
Black Peeling
Brown Peeling
Red Peeling
Brown Peeling
Brown Peeling
Brown Peeling
Off White Peeling
Off White Peeling
Brown Peeling
Off White Peeling
Brown Peeling
Off White Intact
Off White Intact
Off White Intact
Off White Intact
Grey Intact
Grey
Grey
Grey
Intact
Intact
Intact
Floor
Floor
Concrete Grey Intact
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Concrete Grey Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Blue Intact
Drywall Blue Intact
Drywall - Vinyl Grey Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Drywall Off White Intact
Concrete
Drywall
Drywall
Off White Peeling
Off White Intact
Off White Intact
Pb PbErr Result
0 0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0.07 0.03 Positiv
0.03 0.03 Positiv
0.27 0.06 Positiv
3.77 0.43 Positiv
0.26 0.06 Positiv
0. 73 0.07 Positiv
1.14 0.22 Positiv
0.63 0.1 Positiv
0.79 0.14 Positiv
0.48 0.06 Positiv
0.45 0.05 Positiv
3.58 0.28 Positiv
0.27 0.05 Positiv
0 0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 0.01 Negati
0.01 0.01 Negati
0 0 Negall
0 Negati
0 Negati
0 Neg
0 Neg
0 Neg o Neg
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0.08 0.03 Pos
0 0 Neg
0 0 Neg
Sample Date Room electric shop 35 11231201 2
1123/2012
1123/2012
1123/2012
1123/2012
1/23/2012
8/8/2012
8/8/2012
8/8/2012
8/812012
919/2013
919/2013
9/9/2013
919/2013
919/2013
9/9/2013
919/2013
919/2013
919/2013
919/2013 pneudraulic shop break room server room lox shop pneudraulic shop
Generator
Generator
Generator
Generator
West Corridor
West Corridor
Electro
Electro
Electro
Electro
Electro
Electro
Electro
Electro
9/9/2013 West Corridor
9/9/2013 HangarEast Corridor
9/9/2013 West Corridor
9/9/2013 West Corridor
919/2013 Electro
91912013 Electro
919/2013 Electros
919/2013 HangarEast Corridor
9/9/2013 HangarEast Corridor
919/2013
919/2013
919/2013
919/2013
919/2013
919/2013
9/9/2013
Hangar
Hangar
Hangar
Hangar
Hangar
Hangar
Hangar
9/9/2013 East Corridor Lockers
Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition Pb PbErr Result
A Lower Wall Drywall Off White Intact 0.02 0 .02 Neg
A
B
A
B
B
A
A
A
A c c A
A
A
A
A
A
A
A c B c c A
A
A
B
B
A
A
A
A
A
A
A
B
Lower
Middle
Upper
Lower
Lower
Lower
Lower
Lower
Lower
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Middle
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Drywall
Drywall
Drywall
Drywall
Drywall
Metal
Metal
Metal
Metal
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Off White Intact
Off White Intact
Off White Intact
Off White Intact
Off White Intact
Green
Green
Green
Green
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Black
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Grey
Intact
Intact
Intact
Intact
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
Fair
0 Neg
0 Neg
0 Neg
0 Neg
0 Neg
0.21 0.04 Positve
0.23 0.03 Positve
0.14 0.03 Pos1tve
0.02 0.01 Negat1
1.32 0.16 Posit iv
0.93 0.14 Positiv
0.01 0.03 Negati
0 0 Negati
0.04 0.04 Negati
0.01 0.02 Negati
0.01 0.02 Negati
0.02 0.01 Negah
0.01 0.02 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negah
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0 Negati
0.04 0.06 Negah
0 0 Negah
0.01 0 .02 Negati
0 0 Negati
0.01 0.01 Negati
Area is NAD, (No Asbestos Detected) for Asbestos Containing Materials for this specific project EHS~
Laboratories~
Environmental Hazards Services, L.L.C.
7469 Whitepine Rd
Richmond, VA 23237
Asbestos Bulk Analysis Report
Telephone: 800.347.4010
Client: United States Air Force Base
"Signed"
Edward L. Vogel EPA Asbestos Inspector Cert tt 0410-1337A
29 Nov 10 902 CES/CEAN 1651 5th St., West Randolph AFB, TX 78150
Project/Test Address: H16_L8472; Randolph AFB, TX
Report Number:
Received Date:
Analyzed Date:
Reported Date:
10-11-03441
11/23/2010
11/29/2010 11/30/2010
Client Number:
45-6537 Laboratory Results Fax Number:
210-652-3685
Lab Sample Number
Client Sample Number
10-11-03441-001 16-WLSH-002-8
-001
10-11-03441-002 16-WLSH-002-8
-002
10-11-03441-003 16-WLSH-003-8
-001
Layer Type Lab Gross Description
Tan Powder; Fib.; White Gran.
Tan Powder; Fib. ; White Gran.
Tan Powder
Asbestos
NAD
NAD
NAD
Other Materials
15% Cellulose 9% Fibrous Glass 76% Non-Fibrous
1 0% Cellulose 10% Fibrous Glass 80% Non-Fibrous
2% Cellulose 10% Fibrous Glass 88% Non-Fibrous
Environmental Hazards Services, L.L.C Client Number : 45-6537 Report Number: 1 0-11-03441 ProjecUTest Address: H16_L8472; Randolph AFB, TX
Lab Sample Number
Client Sample Number
Layer Type Lab Gross Description Asbestos Other Materials
QC Sample: 12-M11992-2
QC Blank: SRM 1866 Fiberglass
Reporting Limit: 1% Asbestos
Method:
Analyst:
EPA Method 600/R-93/116
Vickie Holmes
Reviewed By Authorized Signatory:
Tasha Eaddy
The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Results represent the analysis of samples submitted by the client. Sample location. description. area. volume. etc .. was provided by the client. This report cannot be used by the client to claim product endorsement by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full. without the written consent of the Environmental Hazards Service. L.L.C. California Certification #2319 NY ELAP #11714. All information concerning sampling location. date. and time can be found on Chain-of-Custody. Environmental Hazards Services.
L.LC. does not perform any sample collection.
Environmental Hazards Services. L.L.C. recommends reanalysis by point count (for more accurate quantification) or Transmission Electron Microscopy (TEM). (for enhanced detection capabilities) for materials regulated by EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by polarized light microscopy (PLM). Both services are available for an additional fee.
·All California samples analyzed by Polarized Light Microscopy. EPA Method 600/M4-82-020. Dec. 1982.
LEGEND: NAD - no asbestos detected
ENS~
Laboratories ..
Envlronmtntal Hazards Servltts, LLC www.le•dllb.com (100)347-4010 (104)275-4,07 (fax)
745' Whlttplnt Rd Rkhmond, VA 23237
Asbestos Chain-qf-Custody
I
Address: 1651 5th Street West Ciry/StateJZap
10-11-03441
~~~tlllt~ll~~ml~ll~ll\lll~l~l ~~~~~~rtll!~~~~ Due Date:
11/30/2010 (Tuesday)
E v;-V Company Name· 902 CES/CEAN
Phone: (21 ~ 652-5323 Fax: (210, 652-3685 E-mail: edward.vogel@randolph.af.mil Ac:ct. Number: _4_5_-6_5_3_7 _____ _
ProjectNa~M / Testla.:Addreu: H16_l8472
Ctty/Statt (Rfl!ulrH}: Randolph AFB, TX c"""''"ti hv· Edward Vogel Purrlt•V' ()rti., N umlvr·
Turn Around Times : If no TAT is spec/fled, sample(s) w/11 be processed and charged as 3-day TAT.
' ___ Same Day (Must Call A bead) ___ Weekend (Must Call Abu d) 3- Day I - Day --- ___ 2 - Day
ASBESTOS
I
AIR
~ ! ·! ~ I Client bate ~
J " ~ No. • d COM:\ t ENTS Sample JD Collected ! J
J ~ Time Tim• '"' Vol ume
0 On o rr .I (Total
Lltcn) t 16-WLSH-002-8-001 11/22/2010 I Men Restroom East Corner
2 16-WLSH-002-B-Q02 11/2212010 .; Men Restroom, Behind Wash Sink
3 16-WLSH-003-B-001 11 /2212010 .; Women Restroom, South
!I
6 I I
1 I 8 ('
9 ' I
Released by: Edward Vogel Signature:: ~AI//JAI!JZ ~~-(JJI I Datc:/Time : 11/222010 1600
Received by: .IeMA- ~ l.a.,jS_ K..({ S ignatu re: 0-:J. \ C1. ~ f'h. y, I DatcfTime : I[ 1£ ~ I It\ " <:>o
L.U
N ::0
5: 0 l..a .. ea~J---o_jl_ __ _t ____ -=~----~-r--6---- J d:J ' -N
± 0
:J 5 =:::az z
' I c
QJ
E V'l V'l
QJ
V'l V'l V'l V'l
QJ
..0 V'l
N -':::> ,., --
Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAL/AVIONICS
Facility Address: 218712 SHP A/SE STOR FCL T Asbestos:
Facility Site: BASE Faci lity Status Manned
Facility Type Maintenance
Facility Owner: 12 MSG/CE liiliiiil_llli._ .. - .. -----1 Number of Floors: 1
Date Constructed: 1931
Square Footage: 87496
Photo File Name 16.jpg
Drawing File Name: B16.tif
Facility Summary Report:
29 Nov 10, Workorder L8472, All drywall is NAD, No Asbestos Detected
15 Sep1 0, Workorder, L6339, Paint Battery Shop walls and Floors, All fllor tiles and mastic in Battery Shop are NAD, (No Asbestos Detected)
28 Jul 09- Hangar Door Window Glazing is NAD for ACM
15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM
Asbestos Containing Material (ACM) Results :
Floor Year ID Location(s) HSA Type HSA Description
Sample# Asbestos Dimension:
2010 2 Wall • Sheetrock
2010 2 Wall - Sheetrock
2010 3
Wall • Sheetrock
Men's Restroom
Brown:Chalky: NAD, Cellulose 15%, Fibrous Glass 9% Non-Fibrous 76%
SF
Men·s Restroom 01
Brown;Chalky;White nexible
Women Restroom 01
Brown Chalky:Brown Fiber
2 NAO, Cellulose 2%. Fibrous Glass 10%.
Non-Fibrous 88%
NAO, Cellulose 2%, Fibrous Glass 10%, Non-Fibrous 88%
Facility Number: 16 Facility Name: SHP A/SE STOR FCL T
Facility Address: 218712 SHP A/SE STOR FCLT Lead Based Paint Detected: "'
Date Constructed: 1931
Square Footage: 87 496
Facility Summary Report:
Facility Type Unknown
Facility Status Manned
Facility Owner: 12 MSG/CE
Photo File Name
16.jpg
Drawing File Name:
Number of Floors: 1
None.dwg Area Positive For LBP Materials
Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling etc. OSHA 29 CFR 1926.62 rules will apply for this project.
23 Nov 10, Workorder L9222, Replace broken Windows- 2 windows are positive for LBP. 1st1 window in room 25 south side and window in room 27 RIH side of east Door. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. All remaining broken windows are Negative for lead based paint.
22 Nov 10, Workorder L8472, The following items are Positive for LBP.Men's restroom, porcelain sink, Women's restroom, all .(J. 'Pink-ceramic tiles. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination is required for ay disturbance of these tiles.
15 Sep 10, Workorder L6339, Paint battery shop walls and floors. - All walls are Negative for LBP
Lead Based Paint Samples for Facility 16 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result
13 11/22/2010 Men's North Lower Wall Tile Ceramic Beige Intact 0.01 0.01 Negativ
14 11/22/2010 Men's North Lower Wall Tile Ceramic Beige Intact 0 0.01 Negativ
15 11122/2010 Men's East Lower Wall Tile Ceramic Beige Intact 0.01 0.02 Negativ
16 11/22/2010 Men's South Lower WaliT1te Ceramic Beige Intact 0.01 0.01 Negativ
17 11/22/2010 Men's South Lower Wall Tile Ceramic Beige Intact 0.02 0.02 Negativ
18 11/22/2010 Men's West Lower Wall Tile Ceramic Beige Intact 0 O.Q1 Negativ
19 11/22/2010 Men's West Lower Wall Tile Ceramic Beige Intact 0 0.01 Negativ
20 11/22/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0 0.01 Negativ
21 11122/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0.4 0 lnconcl
22 11/22/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0.02 0.04 NEgati
23 11122/2010 Men's South Lower Wall Tile Ceramic Grey Intact 0 0.01 NEgati
24 11/22/2010 Men's West Lower Wall Tile Ceramic Grey Intact 0 0.01 NEgati
25 11/22/2010 Men's North Upper Wall Drywall Off White Intact 0 0 NEgati
26 11122/2010 Men's East Upper Wall Drywall Off White Intact 0 0 NEgati
27 11122/2010 Men's South Upper Wall Drywall Off White Intact 0 0 NEgati
28 11122/2010 Men's South Upper Wall Drywall Off White Intact 0 0 NEgati
29 11122/2010 Men's West Upper Wall Drywall Off White Intact 0 0 NEg ali
30 11122/2010 Men's West Upper Wall Drywall Off White Intact 0 0 NEgati
31 11122/2010 Men's Utility North Upper Sink Porcelain Off White Intact 5 0.67 Positiv
Sample Date
32 11/221201 0
33 11/2212010
34 11122/2010
35 11/2212010
36 11/2212010
37 11/22/2010
38 11/2212010
39 11/2212010
40 11122/2010
41 11/2212010
42 11122/2010
43 111221201 0
44 11/2212010
45 1112212010
46 11/2212010
47 1112212010
48 11/2212010
49 1112212010
50 11/2212010
51 11/2212010
52 11/2212010
53 11/2212010
54 1112212010
Room
Men's Utility
Men's Utility
Men's Utility
Men's Utility
Men's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Women's
Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition
Intact South Upper Wall Partition Vinyl Grey
South Left Door Jamb Metal Off White Intact
West
North
North
North
North
East
East
South
South
West
West
South
South
North
East
West
West
NA
NA
NA
NA
Middle
Lower lower
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Upper
Middle
Middle
Middle
Middle
Right
Righi
N/A
N/A
N/A
N/A
Door
Ext Pipes
Floor Tile
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
WaiiT1Ie
Wall Tile
Wall Tile
Wall Tile
Door Casing
Door
Floor Tile
Wall Partition
Fixtures
Co mode
Metal
Metal
Ceramic
Ory.vall
Dry.vall
Ory.vall
Ory.vall
Dry.vall
Ory.vall
Dry.vall
Dry.vall
Ceramic
Ceramic
Ceramic
Ceramic
Metal
Metal
Ceramic
Vinyl
Porcelain
Porcelain
Off White Intact
Off White Rusted
Brown Intact
Off White Intact
Off White lntacl
Off White Intact
Off While Intact
Off While lnlact
Off White Intact
Off While lnlact
Off While Intact
Pink Intact
Red Intact
Red Intact
Red lnlact
Off White Peeling
Off White Peeling
Off White lnlact
Tan lnlact
Off While lnlact
Off While lnlact
Pb PbErr Result
0.01 0.01 Negativ
0 0 Negaliv
0 0 Negativ
0 0 Negaliv
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negativ
0 0 Negaliv
0 0.01 Negativ
0.4 0.02 Positiv
0.4 0.01 Positiv
0.4 0.01 Positiv
0 0 Negativ
0 0 Negativ
0 0 Negativ
0.01 0.01 Negativ
0 Negativ
0 Negativ
Facility Number: 16 Facility Name: SHP AJSE STOR FCLT
Facility Address : 218712 SHP AISE STOR FCLT
Facility Summary Report:
A=West, B=North, C=East. D=South
Facility Type Unknown
Facility Status Manned
Facility Owner: 12 MSG/CE
Photo File Name
16.jpg
Drawing File Name:
None.dwg
Lead Based Paint Detected: '1/
Date Constructed: 1931
Square Footage: 87496
Number of Floors: 1
1/23/2012- W0#1 0757 Replace internet cable CAT 6, Interior concrete walls are positive for LBP. all other areas tested are negative for LBP. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping, blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.
11/22/2011 - Workorder, Hangar 16 for Com Premise Project - All Areas analyzed are Negative for Lead Based Paint
10/20/2011, W0#80082 Paint hangar floor, areas tested are negative for LBP.
08/09/11 - WORKORDER 10498- Paint hangar doors Inside and out- All hangar door interior and exterior are Positive for Lead Based Paint. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination will be required for this project by a certified Lead Firm
7-26-11 , W0#10449 Upgrade NPRNET, areas tested are negative for LBP
7107/11 , W0#1 0419 Paint interior walls, All interior walls are positive for LBP as well as the Hangar Doors inside. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.
Lead Based Paint Samples for Facility 16 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result
28 1/23/2012 hallway c Upper Wall Concrete Off White Peeling 0.08 0.03 Pos
29 1123/2012 server room A Upper Wall Drywall Off White Intact 0 0 Neg
30 1123/2012 break room B Middle Wall Drywall Off White Intact 0 0 Neg
31 1/23/2012 pneudraul ic shop A Lower Wall Drywall Off White Intact 0 0 Neg
32 1/23/2012 pneudraul ic shop B Lower Wall Drywall Off White Intact 0 0 Neg
33 1/23/2012 pneudraulic shop c Lower Wall Drywall Off White Intact 0 0 Neg
34 1/23/2012 pneudraulic shop D Lower Wall Drywall Off White Intact 0 0 Neg
35 1/23/2012 electric shop A Lower Wall Drywall Off White Intact 0.02 0.02 Neg
36 1/23/2012 lox shop B Lower Wall Drywall Off White Intact 0 0 Neg
Asbestos Containing Material (ACM) Results:
Year ID Location(s) HSA Type
Floor Sample ID Original Sample ID HSA Description Sample# Asbestos
2012 Breakroom 01 16-WLSH-00 1-8-001
Wall - Sheetrock East: Beige;Chatky;Gran
2012 2 Office - Wheel and nr 01 16-WLSH-002-B-001
Wall - Sheetrock North; Off White:Gran
2012 2 Office- Wheel and Tir 01 16-WLSH-002-B-002
Wall - Sheetrock East: Off White; Gran 2
2012 3 Room - Battery Shop 01 16-WLJ-003-B-001
Wall - Joint Tape/Joint Compoud East: Off White:Gran
2012 3 Room - Battery Shop 01 16-WLJ-003-B-002
Wall- Joint Tape/Joint Compoud North; Off White;;Gran;Beige Adhesive 2
2012 3 Room - Battery Shop 01 16-WLSH-003-B-003
Wall - Sheetrock East; Beige;Chalky;Gran 3
2012 3 Room - Battery Shop 01 16-WLSH-003-B-004
Wall - Sheetrock Northt1h; Beige ;Chalky;Gran 4
2012 4 Room- Pneudralics 01 16-WLSH-004-B-001
Wall - Sheetrock West; Off White;Chalky;Gran
2012 4 Room- Pneudralics 01 16-WLSH-004-B-002
Wall - Sheetrock North; Off White;Chalky;Gran 2
2012 4 Room· Pneudralics 01 16-WLSH-004-B-003
Wall - Sheetrock East; Off White;Chalky;Gran 3
2012 4 Room- Pneudralics 01 16-WLSH-004-B-004
Wall - Sheetrock South; Off White;Chalky;Gran 4
2012 5 Room· LOX 01 16-WLSH-005- 1 Wall - Sheetrock NOI1h; Pink;Chalky;Gran
2012 6 Electrical Room 01 16-WLSH-006-B-001 Wall - Sheetrock West: Off White;Chalky;Gran
2012 7 Mezzanine 02 16-WLSH-007-B-001 Wall - Sheetrock West: Beige:Chalky;Gran
2012 7 Mezzanine 02 16-WLSH-007 -B-002
Wall - Sheetrock West; Beige;Chalky;Gran 2
NAD. Cellulose 5%, Fiberglass 3%, Non Fibrous 92%
NAD, Cellulose 2%, Fiberglass 2%. Non Fibrous 96%
NAD. Cellulose 2%. Fiberglass 2%, Non Fibrous 96%
NAD, Non-Fibrous 100%
NAD, Non-Fibrous 100%
NAD, Cellulose 3%. Fiberglass 3%. Non Fibrous 94%
NAD. Cellulose 3%. Fiberglass 3%. Non Fibrous 94%
NAD. Cellulose 10%. Non-fibrous 90%
NAD, Cellulose 3%. Fiberglass 2%. Non Fibrous 95%
NAD, Cellulose 3%, Fiberglass 3%. Non Fibrous 94%
NAD, Cellulose 5%. Fiberglass 3%. Non Fibrous 92%
NAD. Cellulose 2%. Fiberglass 2%, Non Fibrous 96%
NAD. Cellulose 4%, Fiberglass 2%. Non Fibrous 94%
NAD. Cellulose 3%. Fiberglass 3%. Non Fibrous 94%
NAD, Cellulose 5%. Fiberglass 2%. Non Fibrous 93%
Dimension:
Floor Area:
Sample Area:
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 SF
SF
0 LF
SF
0 SF
SF
0 SF
0 SF
Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAUAVIONICS
Facility Address : 218712 SHP AISE STOR FCLT Asbestos:
Facility Site: BASE Facility Status Manned
Facility Type Maintenance
Facility Owner: 12 MSG/CE iiiillill _ _. _ _,_ .. _llliiOill;;;;;;;;;;;;;;;;;;;;;t" Number of Floors: 1
Photo File Name 16.jpg
Drawing File Name: B16.tif
Facility Summary Report:
Hangar 16 Premise Upgrade Project All areas for LAN Drops are NAD. No Asbestos Detected
Date Constructed: 1931
Square Footage: 87496
08/31 /2011 - Workorder 10499 - Conduct Lighting Survey, Replace Hangar Lights, All ceiling Panels are NAD, No Asbestos Detected
PCB
All light fixtures must be checked for PCB Ballasts. If ballasts are not marked "NO PCBs" then ballasts must be handled as PCB Waste, or recycled at an approve EPA PCB Recycling Facility . PCB's must be packaged lAW DOT regulations and Manifested.
Recycling Certificate Requir.ed if Recycled
Light Bulbs, HID Lamps are known to contain Mercury in small amounts. All lamps must be removed from fixture packaged lAW DOT regulations and manifested to an approved EPA recycling facility or handled as Universal Waste in the State of Texas.
8/02/2011 Workorder 10449 - Upgrade NPRNET- All sheetrock materials proposed for core drilling is (NAD) No Asbestos Detected
7 Mar 11 , Workorder 80006, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)
28 Jul 09 - Hangar Door Window Glazing is NAD for ACM
15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM
Lead Based Paint Samples for Facility 3 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result
19 1/23/2012 room 208 A Middle Wall Drywall Off lfllhite Intact 0 0 Neg
20 1/23/2012 room 208 B Lower Wall Drywall Off lfllhite Intact 0 0 Neg
21 1/23/2012 2nd floor stairwell D Upper Wall Drywall Off lfllhite Intact 0 0 Neg
22 1/23/2012 dock box 7 A Upper Wall Drywall Off lfllhite Intact 0 0 Neg
25 1/23/2012 dock box 7 B Middle Wall Drywall Off lfllhite Intact 0 0 Neg
26 1/23/2012 dock box 3 A Lower Wall Drywall Off lfllhite Intact 0 0 Neg
27 1/23/2012 dock box sheet metal c Lower Wall Drywall Off lfllh ite Intact 0 0 Neg
Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAL/AVIONICS
Facility Address : 21871 2 SHP A/SE STOR FCLT Asbestos:
Facility Site: BASE Facility Status Manned
Facility Type Maintenance
Facility Owner: 12 MSG/CE ilillil-.--. ... ---lllllil4 Number of Floors: 1
Date Constructed: 1931
Square Footage: 87496
Photo File Name 16.jpg
Drawing File Name: B16.tif
Facility Summary Report:
Area is NAD, (No Asbestos Detected) for Asbestos Containing Materials for this specific project
7 Mar 11, Workorder 806, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)
28 Jul 09 - Hangar Door Window Glazing is NAD for ACM
15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM
Asbestos Containing Material (ACM) Results :
Year ID Location(s)
HSA Type
2011 Hangar Interior
Floor HSA Description Sample# Asbestos
Ceiling Board White:Gran:GrayBiack NAD. Non·Fibrous 100%
Dimension:
Floor Area:
Sample Area:
0 LF
2013-11-04_16_11327_Renovate multiple areas
File details come from the government source that posted it. Updated .