Attachment 13, HAZMAT Report

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar 16, newest first.
File Type Posted
FA3016-17-R-0052_Amendment_0002,_Revise_Section_L_signed.pdf PDF
Atch_1_SOW__11July2017.pdf PDF
Atch_15,_Spec_03_3543_Diamond_Polishing_Concrete_Floors.doc DOC document
FA3016-17-R-0052_Amendment_0001.pdf PDF
Atch_14_Existing_Drawings.zip ZIP file
FA3016-17-R-0052_Hangar_16_Renovations_QA.docx DOCX document
Atch_1,_Statement_of_Work.pdf PDF
Atch_9_Progress_Schedule.xlsx XLSX spreadsheet
Appendix_A,_Specifications.zip ZIP file
RFP_FA3016-17-R-0052.pdf PDF
Atch_12_-_DD_Form_1354.pdf PDF
Atch_5_Contractor_Responsibility_Questionnaire.docx DOCX document
Atch_7,_AETC_Form_47.pdf PDF
Atch_8,_HAZMAT_Letter.pdf PDF
Atch_10_Local_Information.pdf PDF
Atch_11,_Project_Location.pdf PDF
Atch_2_Wage_Determination.pdf PDF
Atch_3_Base_Access_Request.pdf PDF
Atch_6,_Cost_Estimate_Breakdown.xls XLS spreadsheet
Atch_4__Financial_Information_Questionnaire.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Randolph AFB Asbestos Inventory Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAUAVIONICS

Facility Address: 218712 SHP A/SE STOR FCLT Asbestos:

Facility Site: BASE Facility Status Manned

Facility Type Maintenance

Facility Owner: 12 MSG/CE iiiiiiiiiillllill~!llll .. !llll.---lllllf Number of Floors: 1

Photo File Name 16.jpg

Drawing File Name: B16.tif

Facility Summary Report:

10/08/2013 = Work Order 11327 -

Date Constructed: 1931

Square Footage: 87496

1 ). Relocate Wheel and Tire Shop- All wheel and tire shop walls are NAD, NO Asbestos Detected 2). Relocate Ceiling Fans- The Ceiling Board material is NAD, No Asbestos Detected 3.) Completely Refurbish Hangar Doors - All hangar Door Window glazing is NAD, No Asbestos Detected All floor tiles tan and white with black mastic in Tool Room and Shop Stock are NAD, No Asbestos Detected

Hangar 16 Premise Upgrade Project All areas for LAN Drops are NAD, No Asbestos Detected

4. Remove walls betweenShop Stok and Tool Crib, Install Door in Production Support area. All sheetrock walls in the office and tool room areas are NAD, No Asbestos Detected.

5.) Replace broken glass- Refurbish Doors- Window Glazing in the Hangar doors is NAD, No Asbestos Detected

6. ) Replace AC and insulation over offices in center of hangar. All TSI materials is of a fiberglass material.

7.) Refurbish restrooms and add showers. The restroom sheetrock, walls are NAD, No Asbestos Detected.

08/31/2011 - Workorder 10499- Conduct Lighting Survey, Replace Hangar Lights, All ceiling Panels are NAD, No Asbestos Detected

PCB

All light fixtures must be checked for PCB Ballasts. If ballasts are not marked "NO PCBs" then ballasts must be handled as PCB Waste, or recycled at an approve EPA PCB Recycling Facility . PCB's must be packaged lAW DOT regulations and Manifested.

Recycling Certificate Required if Recycled

Light Bulbs, HID Lamps are known to contain Mercury in small amounts. All lamps must be removed from fixture packaged lAW DOT regulations and manifested to an approved EPA recycling facility or handled as Universal Waste in the State of Texas.

8/02/2011 Workorder 10449 - Upgrade NPRNET- All sheetrock materials proposed for core drilling is (NAD) No Asbestos Detected

7 Mar 11 , Workorder 80006, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)

28 Jul 09 - Hangar Door Window Glazing is NAD for ACM

15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM

FA3016-17-R-0052, Attachment 13

Asbestos Containing Material (ACM) Results:

Year ID location(s)

HSA Type Floor Sample ID Original Sample ID HSA Description Sample # Asbestos

201 3 Room - Tool

Floor - Vinyl Composite Tile

2013 Room- Tool

Floor - Vinyl Composite Tile

2013 Room- Tool

Floor - Vinyl Composite Tile

2013 Room - Tool

Floor - Vinyl Composite Tile

2013 Room- Tool

Floor - Vinyl Composite Tile

2013 Room - Tool

Floor - Vinyl Composite Tile

201 3 Room- Tool

Floor - Vinyl Composite Tile

2013 Room- Tool

Floor - Vinyl Composite Tile

201 3 Room - Tool

Floor - Vinyl Composite Tile

2013 Room- Tool

Floor • Vinyl Composite Tile

01 16-FLVCT-001-B-001

12" x 12" Tan Floor Tile: Black Mastic

01 16-FLVCT-001-B-001

12" x 12" Tan Floor Tile; Black Mastic

01 16-FLVCT-001-B-002

12" x 12" Tan Floor Tile: Black Mastic

01 16-FLVCT-001-B-002

12" x 12" Tan Floor Tile: Black Mastic

01 16-FLVCT-001-B-003

12" X 12" White with Brown Streaks: Black Mastic

01 16-FLVCT-001-B-003

12" X12" White with Brown Streaks: Black Mastic

01 16-FLVCT-001-B-004

12" X12" White with Brown Streaks: Black Mastic

01 16-FLVCT-001-B-004

12" X 12" White with Brown Streaks: Black Mastic

01 16-FL VCT -00 1-B-005

12" X 12" White with Brown Streaks: Black Mastic

01 16-FLVCT -001-B-005

12" X 12" White with Brown Streaks: Black Mastic

2013 2 Room • Shop Stock 01 16-FLVCT-002-B-001

Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic

2013 2 Room - Shop Stock 01 16-FLVCT -002-B-001

Floor . Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic

2013 2 Room - Shop Stock 01 16-FLVCT-002-B-002

Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic

201 3 2 Room - Shop Stock 01 16-FLVCT -002-B-002

Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic

2013 2 Room· Shop Stock 01 16-FLVCT .{)02-B-003

Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile: Black Mastic 3

2013 2 Room • Shop Stock 01 16-FLVCT -002-B-003

Floor - Vinyl Composite Tile 12" x 12" Tan Floor Tile; Black Mastic

2013 2 Room - Shop Stock 01 16-FLVCT-002-B-004

Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks: Black Mastic

2013 2 Room - Shop Stock 01 16-FLVCT .{)02-B-004

Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks: Black Mastic

2013 2 Room - Shop Stock 01 16-FLVCT-002-B-005

Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks; Black Mastic

201 3 2 Room - Shop Stock 01 16-FL VCT -002-B-005

Floor - Vinyl Composite Tile 12" X 12" White with Brown Streaks; Black Mastic

L 1, NAO, Non-Fibrous 100%

L2, NAD, mastic. Non-Fibrous 100%

L2, NAD, mastic, Non-Fibrous 100%

L 1. NAD, Non-Fibrous 100%

L1 . NAD, Non-Fibrous 100%

L2. NAD, mastic. Non-Fibrous 100%

L1 . NAD, Non-Fibrous 100%

L2. NAD. mastic. Non-Fibrous 100%

L2, NAD, mastic. Non-Fibrous 100%

L 1, NAO, Non-Fibrous 100%

L 1. NAD, Non-Fibrous 1 OO%

L2, NAD, mastic, Non-Fibrous 100%

L 1. NAO, Non-Fibrous 100%

L2. NAD. mastic. Non-Fibrous 100%

L 1. NAD, Non-Fibrous 100%

L2, NAD, mastic, Non-Fibrous 100%

L 1. NAD. Non-Fibrous 100%

L2. NAD. mastic. Non-Fibrous 100%

L2. NAD, mastic. Non-Fibrous 100%

L 1. NAD. Non-Fibrous 100%

Dimension:

Floor Area:

Sample Area:

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

2012 Break room 01 16-WLSH-00 1-B-001 SF

Wall - Sheetrock East: Beige;Chalky;Gran NAD, Cellulose 5%, Fiberglass 3%. Non- 0 SF Fibrous 92%

2012 2 Office - Wheel and Tir 01 16-WLSH-002-8-001 SF

Wall - Sheetrock North: Off White:Gran NAD, Cellulose 2%. Fiberglass 2%. Non- 0 SF Fibrous 96%

2012 2 Office - Wheel and Tir 01 16-WLSH-002-B-002 SF

Wall - Sheetrock East: Off White;Gran 2 NAD. Cellulose 2%. Fiberglass 2%. Non- 0 SF F1brous 96%

2012 3 Room - Battery Shop 01 16-WLJ-003-8-001 SF

Wall - Jo1nt TapefJoint Compoud East: Off White:Gran NAD. Non-Fibrous 100% 0 SF

2012 3 Room - Battery Shop 01 16-WLJ-003-8-002 SF

Wall -Joint Tape/Joint Compoud North; Off White::Gran;Beige Adhesive 2 NAD. Non-Fibrous 100% 0 SF

2012 3 Room - Battery Shop 01 16-WLSH-003-B-003 SF

Wall - Sheetrock East: Beige;Chalky;Gran 3 NAD. Cellulose 3%, Fiberglass 3%. Non- 0 SF Fibrous 94%

2012 3 Room - Battery Shop 01 16-WLSH-003-B-004 SF

Wall - Sheetrock Northrth; Beige ;Chalky:Gran 4 NAD. Cellulose 3%, Fiberglass 3%. Non- 0 SF Fibrous 94%

2012 4 Room - Pneudralics 01 16-WLSH-004-B-001 SF

Wall - Sheetrock West: Off White;Chalky:Gran NAD, Cellulose 10%, Non-fibrous 90% 0 SF

2012 4 Room - Pneudralics 01 16-WLSH-004-B-002 SF

Wall - Sheetrock North; Off White;Chalky;Gran 2 NAD. Cellulose 3%. Fiberglass 2%. Non- 0 SF Fibrous 95%

2012 4 Room - Pneudralics 01 16-WLSH-004-B-003 SF

Wall - Sheetrock East: Off White;Chalky;Gran 3 NAD. Cellulose 3%. Fiberglass 3%, Non- 0 SF Fibrous 94%

2012 4 Room - Pneudralics 01 16-WLSH-004-8-004 SF

Wall - Sheetrock South: Off White;Chalky;Gran 4 NAD. Cellulose 5%, Fiberglass 3%. Non- 0 SF Fibrous 92%

2012 5 Room- LOX 01 16-WLSH-005- 1 SF

Wall - Sheetrock North; Pink;Chalky;Gran NAD. Cellulose 2%, Fiberglass 2%. Non- 0 lF Fibrous 96%

2012 6 Electrical Room 01 16-WlSH-006-B-001 SF

Wall - Sheetrock West: Off White:Chalky;Gran NAD, Cellulose 4%. Fiberglass 2%. Non- 0 SF Fibrous 94%

2012 7 Mezzanine 02 16-WLSH-007-B-001 SF

Wall - Sheetrock West: Beige;Chalky;Gran NAD. Cellulose 3%. Fiberglass 3%. Non- 0 SF Fibrous 94%

2012 7 Mezzanine 02 16-WLSH-007-B-002 SF

Wall - Sheetrock West: Beige;Chalky;Gran 2 NAD. Cellulose 5%. Fiberglass 2%. Non- 0 SF Fibrous 93%

2011 Hangar Interior 01 16-Clli-001-B-001 SF

Ceiling - lay-in Tile white; powdery NAD. Cellulose 15%. Non-fibrous 85% 0 SF

2011 Hangar Interior 01 16-Clli-001-B-002 SF

Cei ling - lay-in Tile white; powdery 2 NAD. Cellulose 10%, Non-fibrous 90% 0 SF

2011 Hangar Interior 01 16-ClU-001-B-003 SF

Ceiling - Lay-in Tile while; powdery 3 NAD. Cellulose 10%, Non-fibrous 90% 0 SF

2011 2 Communications Roo 02 16-WLSH-002-B-001 SF

Wall • Sheetrock East; Beige;Chalky;gran NAD. Cellulose 12%, Non-fibrous 88% 0 SF

2011 2 Communications Roo 02 16-WLSH-002-B-002 SF

Wall- Sheetrock South;; Beige;Chalky;gran 2 NAD. Cellulose 12%. Non-fibrous 88% 0 SF

2011 2 Commumcations Roo 02 16-WLSH-002-8-003 SF

Wall - Sheetrock North: Beige;Chalky;gran 3 NAD. Cellulose 12%, Non-fibrous 88% 0 SF

2011 2 Communications Roo 02 16-WLSH-002-B-004

Wall - Sheetrock West; Beige;Chalky;gran 4

2010 Room - Battery Shop 01 16-FLVCT -001-B-001

Floor - Vinyl Composite Tile 12" X 12" gray:Brown Streaks;Biack Mastic

2010 Room - Battery Shop 01 16-FLVCT-001-B-001

Floor - Vinyl Composite Tile 12" X 12" gray;Brown Streaks;Black Mastic

2010 Room - Battery Shop 01 16-FL VCT -001-B-002

Floor - Vinyl Composite Tile 12" X 12" Black;White Streaks;Gray Mastic 2

2010 Room - Battery Shop 01 16-FLVCT -001-B-002

Floor - Vinyl Composite Tile 12" X 12" Black;White Streaks;Gray Mastic 2

2010 Room - Battery Shop 01 16-FLVCT-001-B-003

Floor- Vinyl Composite Tile 12" X 12" Tan;White Streaks:Biack Mastic 3

2010 Room - Battery Shop 01 16-FLVCT-001-B-003

Floor - Vinyl Composite Tile 12" X 12" Tan:White Streaks;Biack Mastic 3

2009 Room- Production Su 16-FLVCT-001-B-001

Floor- Vinyl Composite Tile 12" x 12" White with Brown streak: Black Mastic 1

2009 Room- Production Su 16-FLVCT-001-B-001

Floor - Vinyl Composite Tile 12" x 12" White with Brown streak: Black Mastic 1

2009 Room - Production Su 16-FLVCT-001-B-001

Floor- Vinyl Composite Tile 12" x 12" White with Brown streak; Black Mastic 1

2009 2 Hangar Interior 16-WGLZ-002-B-001

VVindow Glazing Gray: Gran.

2009 2 Hangar Interior 16-WGLZ-002-B-002 VVindow Glazing Gray; Gran. 2

2009 2 Hangar Interior 16-WGLZ-002-B-003 VVindow Glazing Gray: Gran. 3

2009 2 Hangar Interior 16-WGLZ-002-B-004 VVindow Glazing Gray; Gran. 4

NAD, Cellulose 12%. Non-fibrous 88%

L2. NAD. mastic, Cellulose 5%, Non fibrous 95%

L 1, NAD, tile. Non-Fibrous 100%

L 1. NAD. tile. Non-Fibrous 100%

L2. NAD.mastic. Cellulose 2%. Non fibrous 98%

L 1, NAD.tile. Non-Fibrous 100%

L2, NAD,mastic. Cellulose 5%. Non fibrous 95%

L 1, NAD. Non-Fibrous 100%

L3. NAD. Non-Fibrous 100%

L2. NAD. Cellulose 4%. Non-fibrous 96%

NAD. Non-Fibrous 100%

NAD. Non-Fibrous 100%. Unknown

NAD. Non-Fibrous 100%

NAD. Non-Fibrous 100%

SF

0 SF

SF

SF

SF

SF

SF

SF

342 SF

342 SF

342 SF

4600 LF

4600 LF

4600 LF

4600 LF

Randolph AFB LBP Inventory Facility Number: 16 Facility Name: SHP AJSE STOR FCL T

Facility Address: 218712 SHP AJSE STOR FCL T

Facility Type AGE Maintenance

Facility Status Manned

Lead Based Paint Detected : "'

Date Constructed: 1931

Square Footage : 87496

Facility Owner: 12 MSG/CE Number of Floors: 1

Facil ity Summary Report:

A=West, B=North, C=East, D=South

Photo File Name

16.jpg

Drawing File Name:

None.dwg

LBP Report File Name(s):

2013-09-11_16_80192_Paint Flo

CEAN • Ar a Poaltlvo for LBP Contact CEAN @ 652·4668

Coordination Requtred

10/08/2013- Work Order 11327 -1 .) Relocate Wheel and Tire Shop - All areas are Negative for LBP 2.) Refurbish Hangar Doors- All Hangar Doors, Window Mullions, Door Casings are Positive for LBP throughout, North and South Side of Hangar 3.) Remove Lead Based Paint from walls -All interior Hangar Concrete Walls are Positive for LBP.

4.) Remove Walls for renovation -All offices in the Production Support area are Negative for LBP 5.) Refurbish Hangar Floor- All areas are Negative for LBP except for the West Corridor of AGE (South West Side of Hangar where the yellow lines are painted over. The yellow lines are positive for LBP.

09/09/2013 - The floor is in fair condition with some peeling. The majority of the floor is in need of repainting. Since the customer states that there will be no abrasive methods taken to paint the floor, Recommend Approval even thougt the lines that are painted over on the west side of wheel and tire are positive for LBP. Recommend approval to paint the floor as long as customer does not siturb the existing coating on the floor by any abrasive means.

08/09/2012- Work Order 11054- Remove Motor Generator- The generator has small levels of Lead Based Paint. However, the paint is intact and there should be no concerns for exposure during the removal process.

If this unit contains oil, it must be sampled for PCBs at owner's cost

1/23/2012- W0#10757 Replace internet cable CAT 6, Interior concrete walls are positive for LBP, all other areas tested are negative for LBP. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping, blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.

11/22/2011 - Workorder, Hangar 16 for Com Premise Project - All Areas analyzed are Negative for Lead Based Paint

10/20/2011 , W0#80082 Paint hangar floor, areas tested are negative for LBP.

08/09/11 - WORKORDER 10498 - Paint hangar doors Inside and out - All hangar door interior and exterior are Positive for Lead Based Paint. Do not disturb any areas that are POS for LBP by any abrasive means such as sand ing, scraping blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination will be required for this project by a certified Lead Firm

7-26-11 , W0#1 0449 Upgrade NPRNET, areas tested are negative for LBP

7/07/11 , W0#1 0419 Paint interior walls, All interior walls are positive for LBP as well as the Hangar Doors inside. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.

Lead Based Paint Samoles for Facilitv 16

Sample

Date

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/2008

8/11/20Q8

8/11/2008

8/11/2008

8/1112008

8/11/2008

8/11/2008

8111/2008

Room

HAZMAT Storage

HAZMAT Storage

HAZMA T Storage

HAZMA T Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMAT Storage

HAZMA T Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

8/11/2008 HAZMAT Storage

8/1112008 HAZMAT Storage

8/11 /2008 HAZMAT Storage

8/11/2008 HAZMAT Storage

8/11/2008

8/11 /2008

HAZMAT Storage

HAZMA T Storage

8/11/2008 HAZMAT Storage

8/11/2008 HAZMA T Storage

8/11/2008 HAZMAT Storage

8111/2008 HAZMAT Storage

8/11/2008 HAZMAT Storage

8/11/2008 HAZMAT Storage

8/11/2008

8/1112008

8/1112008

8/1112008

8/11/2008

8/11/2008

8/11/2008

8111/2008

8/11/2008

8/11/2008

3/12/2009

7nt2009

7nt2009

7nt2009

7nt2009

7nt2009

7n/2009

7nt2009

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMA T Storage

HAZMAT Storage

HAZMAT Storage

HAZMA T Storage

HAZMA T Storage

Restroom Mens

South Hangar 6

North Hangar 2

South Hangar 6

North Hangar 2

South Hangar 7

North Hangar 2

North Hangar 3

Side Quadrant

A

A

A

A

B

A

A

A

A

A

B

D

D c A

A

B

A c A

B c c D

D

A

D

B

B c c

D

D

A

A

A

A

D

D

D

B

D

B

B

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Lower

Lower

Lower

Lower

Middle

Upper

Upper

Lower

Upper

Upper

Upper

Upper

Upper

Component Substrate Color Condition

Intact

Intact

Intact

Intact

Intact

Intact

Fence Gate

Fence Picket

Fence Gate

Fence Gate

Fence Gate

Fence Picket

Wall

Wall

Wall

Post

Post

Post

Wall

Wall

Wall

Wall

Wall

Wall

Post

Wall

Wall

Wall

Post

Wall

Wall

Wall

Wall

Wall

Wall

Post

Post

Post

Post

Post

Post

Post

Post

Post

Post

Wall

Door Casing

Door

Window Mullion

Door Casing

Door Casing

Window Mullion

Door Casing

Metal

Metal

Metal

Metal

Metal

Metal

Concrete

Concrete

Concrete

Metal

Metal

Metal

Concrete

Concrete

Concrete

Concrete

Metal

Concrete

Metal

Concrete

Concrete

Metal

Metal

Concrete

Concrete

Concrete

Concrete

Concrete

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Drywall

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Red

Red

Red

Red

Red

Red

Off White Peeling

Off White Intact

Off White Intact

Brown Intact

Brown Peeling

Brown Intact

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Brown Peeling

Off White Intact

Brown Intact

Off White Intact

Off White Intact

Brown

Brown

Peeling

Peeling

Off White Intact

Off White Intact

Off White Intact

Off White Intact

Off White Intact

Brown Peeling

Brown

Brown

Brown

Brown

Brown

Brown

Brown

Brown

Brown

Red

Yellow

Peeling

Peeling

Peeling

Peeling

Peeling

Peeling

Peeling

Peeling

Peeling

Peeling

Intact

Off W hite Peeling

Brown Peeling

Off While Peeling

Off W hite Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Pb PbErr Result

0 .15 0 .03 POS

0.14 0.04 POS

0.14 O.D3 POS

0.12 0.02 POS

0.11 0.02 POS

0.1 0.02 POS

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 NEG

0 0 NEG

0 0 NEG

0 0 NEG

0.01 0 NEG

0.01 0 NEG

0 0 NEG

0 0 NEG

0 NEG

0 NEG

0 Negali

2.1 0.25 POsitiv

0.42 0.08 POsitiv

0.11 0. 1 Positiv

3.41 0.59 Positiv

1.99 0.25 Positiv

0.09 0.05 Positiv

1.86 0.2 Positiv

11 1

Date

7f712009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f712009

7f712009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f712009

7f7/2009

7f7/2009

7f7/2009

?fl/2009

7f712009

7f7/2009

7f7/2009

7f7/2009

?fl/2009

7f712009

7f7/2009

7f7/2009

7f7/2009

7f712009

7f7/2009

7f712009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f712009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

Room

South Hangar 8

South Hangar 8

North Hangar 4

North Hangar 1

North Hangar 3

North Hangar 1

North Hangar 1

North Hangar 5

South Hangar 8

North Hangar 3

South Hangar 7

North Hangar 3

North Hangar 6

North Hangar 7

North Hangar 8

North Hangar 9

North Hangar 2

North Hangar 2

North Hangar 1

North Hangar 4

North Hangar 5

North Hangar 6

North Hangar 7

North Hangar 8

North Hangar 9

North Hangar 10

North Hangar 6

North Hangar 7

North Hangar 8

North Hangar 7

North Hangar 6

South Hangar 6

North Hangar 5

North Hangar 4

North Hangar 4

North Hangar 1

South Hangar 6

North Hangar 8

North Hangar 8

South Hangar 6

South Hangar 6

North Hangar 4

North Hangar 2

North Hangar 6

North Hangar 3

North Hangar 5

Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition

D Upper Window Mullion Metal Off White Peel ing

D Upper Door Casing Metal Off White Peel ing

B

D

B

B

B

B

D

B

D

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

D

B

B

B

B

D

B

B

D

D

B

B

B

B

B

Lower

Lower

Lower

Upper

Lower

Lower

Lower

Lower

Upper

Upper

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Lower

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Door

Door

Door

Window Mullion

Door Casing

Door

Door

Door Casing

Window Mullion

Window Mullion

Door

Door

Door

Door

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door

Window Mullion

Window Mullion

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Door Casing

Window Mull ion

Window Pane

Window Pane

Window Pane

Window Mull ion

Window Pane

Window Pane

W indow Pane

Window Pane

Window Pane

Window Pane

Window Mullion

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Metal

Glass

Glass

Metal

Metal

Glass

Glass

Metal

Glass

Glass

Metal

Metal

Brown Peeling

Brown Peeling

Brown Peeling

Off White Peeling

Brown Peel ing

Brown Peel ing

Black Peeling

Brown Peeling

Off White Peeling

Off White Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Yellow Peeling

Brown Peeling

Off White Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Brown Peel ing

Brown Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Yellow Peeling

Black Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Off White Peel ing

Pb PbErr Result

0.08 0 .05 POsitiv

2.31 0.28 POsitiv

0.5 0.1 POsitiv

0.75 0.12 POsitiv

0.48 0.13 POsitiv

0.09 0.05 POsitiv

0.3 0.07 POsitiv

0.13 0 .04 POsitiv

0.53 0.11 POsitiv

0.51 0.12 POsit iv

0.13 Positiv

0.15 0.19 Positiv

0.62 0.14 POsitiv

0.68 0.12 POsitiv

0.52 0.13 POsit iv

0.68 0.15 POsitiv

0.46 0.06 POsitiv

0 .36 0.07 POsitiv

2.42 0.32 POsitiv

0.33 0.07 POsitiv

0.66 0.14 POsit iv

0.4 0.08 POsitiv

0.11 0.04 POsitiv

0.35 0.08 POsitiv

0.12 0.05 POsitiv

0.59 0.13 POsitiv

0.33 0.1 POsitiv

0.62 0.12 POsitiv

3.52 0.51 POsitiv

1.74 0.22 POsitiv

2.22 0.33 POsitiv

1.54 0.17 Positiv

1.88 0.28 POsitiv

1.81 0.2 POsitiv

0.16 0.09 POsitiv

0.01 0.01 Negati

0 0 Negati

0 0 Negati

0.05 0.03 negativ

0 0 Negati

0 0 Negati

0.01 0 Negati

0 0 Negati

0.01 0 Negati

0 0 Negati

0.04 0.02 Negati

Date

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2009

7f7/2011

7f7/201 1

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/2011

7f7/201 1

7f7/2011

15 7/26/2011

14 7126/2011

13 7/26/2011

12 7126/2011

2 10120/2011

3 10/20/2011

4 10120/2011

5 10120/2011

Room

South Hangar 6

North Hangar 5

North Hangar 7

South Hangar 8

South Hangar 8

South Hangar 7 interior interior interior interior interior mterior interior interior mterior mterior interior mterior interior

Interior

2nd floor comm

2nd floor comm

2nd floor comm

2nd floor comm interior interior mterior interior

6 10120/2011 interior

7 10120/2011 interior

8 11/22/2011 Ancillary Tng

2 11122/2011 Production Support

3 1112212011 Production Support

5 11/22/2011 Tool Rm

6 1112212011 Shop Stock N

7 1112212011 Bench Stock

16 1112212011 Battery

15 11/2212011 Battery

12 11122/2011 Wheei Tire

11 11/2212011 Personal lockers S

10 1112212011 Ancillary Tng

9 11122/2011 Ancillary Tng

4 11122/2011 Production Support

1123/2012

1123/2012

1123/2012 hallway pneudraulic shop pneudraulic shop

Lead Based Paint Samples for Facility 16 Side

D

B

B

D

D

D

A

A

D

A c c c c A

D

D

A c c A

B

D c A

A

A

A

A

A

B

B c A

B

B c B

A c D c

A c c D

Quadrant

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Lower

Right

Lower

Middle

Right

Center

Center

Left lower

Middle

Middle

Upper

Right

Upper

Upper

Upper

Upper

Lower

Lower

Middle

Right

Center

Lower

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Upper

Lower

Lower

Component Substrate

Window Pane Glass

Window Pane

Window Pane

Window Pane

Window Pane

Window Pane

Glass

Metal

Glass

Glass

Glass

Wall Concrete

Wall Concrete

Door Hangar Metal

Wall Concrete

Wall Concrete

Va ll Support Column Concrete

Wall Concrete

Wall Concrete

Wall Concrete

Door Hangar Metal

Door Hangar Metal

Vall Support Column Concrete

Wall Concrete

Door Metal

Wall

~all

Wall

Wall

Floor

Floor

Floor

Floor

Drywall

Drywall

Drywall

Drywall

Concrete

Concrete

Concrete

Concrete

Color Condition

Blue Peeling

Off White Peeling

Off White Peeling

Off White Peeling

Yellow Peeling

Orange Peeling

Off White Peeling

Brown Peeling

Off White Peeling

Black Peeling

Brown Peeling

Red Peeling

Brown Peeling

Brown Peeling

Brown Peeling

Off White Peeling

Off White Peeling

Brown Peeling

Off White Peeling

Brown Peeling

Off White Intact

Off White Intact

Off White Intact

Off White Intact

Grey Intact

Grey

Grey

Grey

Intact

Intact

Intact

Floor

Floor

Concrete Grey Intact

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Concrete Grey Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Blue Intact

Drywall Blue Intact

Drywall - Vinyl Grey Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Drywall Off White Intact

Concrete

Drywall

Drywall

Off White Peeling

Off White Intact

Off White Intact

Pb PbErr Result

0 0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0.07 0.03 Positiv

0.03 0.03 Positiv

0.27 0.06 Positiv

3.77 0.43 Positiv

0.26 0.06 Positiv

0. 73 0.07 Positiv

1.14 0.22 Positiv

0.63 0.1 Positiv

0.79 0.14 Positiv

0.48 0.06 Positiv

0.45 0.05 Positiv

3.58 0.28 Positiv

0.27 0.05 Positiv

0 0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 0.01 Negati

0.01 0.01 Negati

0 0 Negall

0 Negati

0 Negati

0 Neg

0 Neg

0 Neg o Neg

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0.08 0.03 Pos

0 0 Neg

0 0 Neg

Sample Date Room electric shop 35 11231201 2

1123/2012

1123/2012

1123/2012

1123/2012

1/23/2012

8/8/2012

8/8/2012

8/8/2012

8/812012

919/2013

919/2013

9/9/2013

919/2013

919/2013

9/9/2013

919/2013

919/2013

919/2013

919/2013 pneudraulic shop break room server room lox shop pneudraulic shop

Generator

Generator

Generator

Generator

West Corridor

West Corridor

Electro

Electro

Electro

Electro

Electro

Electro

Electro

Electro

9/9/2013 West Corridor

9/9/2013 HangarEast Corridor

9/9/2013 West Corridor

9/9/2013 West Corridor

919/2013 Electro

91912013 Electro

919/2013 Electros

919/2013 HangarEast Corridor

9/9/2013 HangarEast Corridor

919/2013

919/2013

919/2013

919/2013

919/2013

919/2013

9/9/2013

Hangar

Hangar

Hangar

Hangar

Hangar

Hangar

Hangar

9/9/2013 East Corridor Lockers

Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition Pb PbErr Result

A Lower Wall Drywall Off White Intact 0.02 0 .02 Neg

A

B

A

B

B

A

A

A

A c c A

A

A

A

A

A

A

A c B c c A

A

A

B

B

A

A

A

A

A

A

A

B

Lower

Middle

Upper

Lower

Lower

Lower

Lower

Lower

Lower

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Middle

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Floor

Drywall

Drywall

Drywall

Drywall

Drywall

Metal

Metal

Metal

Metal

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Off White Intact

Off White Intact

Off White Intact

Off White Intact

Off White Intact

Green

Green

Green

Green

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Black

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Grey

Intact

Intact

Intact

Intact

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

Fair

0 Neg

0 Neg

0 Neg

0 Neg

0 Neg

0.21 0.04 Positve

0.23 0.03 Positve

0.14 0.03 Pos1tve

0.02 0.01 Negat1

1.32 0.16 Posit iv

0.93 0.14 Positiv

0.01 0.03 Negati

0 0 Negati

0.04 0.04 Negati

0.01 0.02 Negati

0.01 0.02 Negati

0.02 0.01 Negah

0.01 0.02 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negah

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0 Negati

0.04 0.06 Negah

0 0 Negah

0.01 0 .02 Negati

0 0 Negati

0.01 0.01 Negati

Area is NAD, (No Asbestos Detected) for Asbestos Containing Materials for this specific project EHS~

Laboratories~

Environmental Hazards Services, L.L.C.

7469 Whitepine Rd

Richmond, VA 23237

Asbestos Bulk Analysis Report

Telephone: 800.347.4010

Client: United States Air Force Base

"Signed"

Edward L. Vogel EPA Asbestos Inspector Cert tt 0410-1337A

29 Nov 10 902 CES/CEAN 1651 5th St., West Randolph AFB, TX 78150

Project/Test Address: H16_L8472; Randolph AFB, TX

Report Number:

Received Date:

Analyzed Date:

Reported Date:

10-11-03441

11/23/2010

11/29/2010 11/30/2010

Client Number:

45-6537 Laboratory Results Fax Number:

210-652-3685

Lab Sample Number

Client Sample Number

10-11-03441-001 16-WLSH-002-8

-001

10-11-03441-002 16-WLSH-002-8

-002

10-11-03441-003 16-WLSH-003-8

-001

Layer Type Lab Gross Description

Tan Powder; Fib.; White Gran.

Tan Powder; Fib. ; White Gran.

Tan Powder

Asbestos

NAD

NAD

NAD

Other Materials

15% Cellulose 9% Fibrous Glass 76% Non-Fibrous

1 0% Cellulose 10% Fibrous Glass 80% Non-Fibrous

2% Cellulose 10% Fibrous Glass 88% Non-Fibrous

Environmental Hazards Services, L.L.C Client Number : 45-6537 Report Number: 1 0-11-03441 ProjecUTest Address: H16_L8472; Randolph AFB, TX

Lab Sample Number

Client Sample Number

Layer Type Lab Gross Description Asbestos Other Materials

QC Sample: 12-M11992-2

QC Blank: SRM 1866 Fiberglass

Reporting Limit: 1% Asbestos

Method:

Analyst:

EPA Method 600/R-93/116

Vickie Holmes

Reviewed By Authorized Signatory:

Tasha Eaddy

The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Results represent the analysis of samples submitted by the client. Sample location. description. area. volume. etc .. was provided by the client. This report cannot be used by the client to claim product endorsement by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full. without the written consent of the Environmental Hazards Service. L.L.C. California Certification #2319 NY ELAP #11714. All information concerning sampling location. date. and time can be found on Chain-of-Custody. Environmental Hazards Services.

L.LC. does not perform any sample collection.

Environmental Hazards Services. L.L.C. recommends reanalysis by point count (for more accurate quantification) or Transmission Electron Microscopy (TEM). (for enhanced detection capabilities) for materials regulated by EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by polarized light microscopy (PLM). Both services are available for an additional fee.

·All California samples analyzed by Polarized Light Microscopy. EPA Method 600/M4-82-020. Dec. 1982.

LEGEND: NAD - no asbestos detected

ENS~

Laboratories ..

Envlronmtntal Hazards Servltts, LLC www.le•dllb.com (100)347-4010 (104)275-4,07 (fax)

745' Whlttplnt Rd Rkhmond, VA 23237

Asbestos Chain-qf-Custody

I

Address: 1651 5th Street West Ciry/StateJZap

10-11-03441

~~~tlllt~ll~~ml~ll~ll\lll~l~l ~~~~~~rtll!~~~~ Due Date:

11/30/2010 (Tuesday)

E v;-V Company Name· 902 CES/CEAN

Phone: (21 ~ 652-5323 Fax: (210, 652-3685 E-mail: edward.vogel@randolph.af.mil Ac:ct. Number: _4_5_-6_5_3_7 _____ _

ProjectNa~M / Testla.:Addreu: H16_l8472

Ctty/Statt (Rfl!ulrH}: Randolph AFB, TX c"""''"ti hv· Edward Vogel Purrlt•V' ()rti., N umlvr·

Turn Around Times : If no TAT is spec/fled, sample(s) w/11 be processed and charged as 3-day TAT.

' ___ Same Day (Must Call A bead) ___ Weekend (Must Call Abu d) 3- Day I - Day --- ___ 2 - Day

ASBESTOS

I

AIR

~ ! ·! ~ I Client bate ~

J " ~ No. • d COM:\ t ENTS Sample JD Collected ! J

J ~ Time Tim• '"' Vol ume

0 On o rr .I (Total

Lltcn) t 16-WLSH-002-8-001 11/22/2010 I Men Restroom East Corner

2 16-WLSH-002-B-Q02 11/2212010 .; Men Restroom, Behind Wash Sink

3 16-WLSH-003-B-001 11 /2212010 .; Women Restroom, South

!I

6 I I

1 I 8 ('

9 ' I

Released by: Edward Vogel Signature:: ~AI//JAI!JZ ~~-(JJI I Datc:/Time : 11/222010 1600

Received by: .IeMA- ~ l.a.,jS_ K..({ S ignatu re: 0-:J. \ C1. ~ f'h. y, I DatcfTime : I[ 1£ ~ I It\ " <:>o

L.U

N ::0

5: 0 l..a .. ea~J---o_jl_ __ _t ____ -=~----~-r--6---- J d:J ' -N

± 0

:J 5 =:::az z

' I c

QJ

E V'l V'l

QJ

V'l V'l V'l V'l

QJ

..0 V'l

N -':::> ,., --

Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAL/AVIONICS

Facility Address: 218712 SHP A/SE STOR FCL T Asbestos:

Facility Site: BASE Faci lity Status Manned

Facility Type Maintenance

Facility Owner: 12 MSG/CE liiliiiil_llli._ .. - .. -----1 Number of Floors: 1

Date Constructed: 1931

Square Footage: 87496

Photo File Name 16.jpg

Drawing File Name: B16.tif

Facility Summary Report:

29 Nov 10, Workorder L8472, All drywall is NAD, No Asbestos Detected

15 Sep1 0, Workorder, L6339, Paint Battery Shop walls and Floors, All fllor tiles and mastic in Battery Shop are NAD, (No Asbestos Detected)

28 Jul 09- Hangar Door Window Glazing is NAD for ACM

15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM

Asbestos Containing Material (ACM) Results :

Floor Year ID Location(s) HSA Type HSA Description

Sample# Asbestos Dimension:

2010 2 Wall • Sheetrock

2010 2 Wall - Sheetrock

2010 3

Wall • Sheetrock

Men's Restroom

Brown:Chalky: NAD, Cellulose 15%, Fibrous Glass 9% Non-Fibrous 76%

SF

Men·s Restroom 01

Brown;Chalky;White nexible

Women Restroom 01

Brown Chalky:Brown Fiber

2 NAO, Cellulose 2%. Fibrous Glass 10%.

Non-Fibrous 88%

NAO, Cellulose 2%, Fibrous Glass 10%, Non-Fibrous 88%

Facility Number: 16 Facility Name: SHP A/SE STOR FCL T

Facility Address: 218712 SHP A/SE STOR FCLT Lead Based Paint Detected: "'

Date Constructed: 1931

Square Footage: 87 496

Facility Summary Report:

Facility Type Unknown

Facility Status Manned

Facility Owner: 12 MSG/CE

Photo File Name

16.jpg

Drawing File Name:

Number of Floors: 1

None.dwg Area Positive For LBP Materials

Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling etc. OSHA 29 CFR 1926.62 rules will apply for this project.

23 Nov 10, Workorder L9222, Replace broken Windows- 2 windows are positive for LBP. 1st1 window in room 25 south side and window in room 27 RIH side of east Door. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. All remaining broken windows are Negative for lead based paint.

22 Nov 10, Workorder L8472, The following items are Positive for LBP.Men's restroom, porcelain sink, Women's restroom, all .(J. 'Pink-ceramic tiles. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations. etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination is required for ay disturbance of these tiles.

15 Sep 10, Workorder L6339, Paint battery shop walls and floors. - All walls are Negative for LBP

Lead Based Paint Samples for Facility 16 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

13 11/22/2010 Men's North Lower Wall Tile Ceramic Beige Intact 0.01 0.01 Negativ

14 11/22/2010 Men's North Lower Wall Tile Ceramic Beige Intact 0 0.01 Negativ

15 11122/2010 Men's East Lower Wall Tile Ceramic Beige Intact 0.01 0.02 Negativ

16 11/22/2010 Men's South Lower WaliT1te Ceramic Beige Intact 0.01 0.01 Negativ

17 11/22/2010 Men's South Lower Wall Tile Ceramic Beige Intact 0.02 0.02 Negativ

18 11/22/2010 Men's West Lower Wall Tile Ceramic Beige Intact 0 O.Q1 Negativ

19 11/22/2010 Men's West Lower Wall Tile Ceramic Beige Intact 0 0.01 Negativ

20 11/22/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0 0.01 Negativ

21 11122/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0.4 0 lnconcl

22 11/22/2010 Men's East Lower Wall Tile Ceramic Grey Intact 0.02 0.04 NEgati

23 11122/2010 Men's South Lower Wall Tile Ceramic Grey Intact 0 0.01 NEgati

24 11/22/2010 Men's West Lower Wall Tile Ceramic Grey Intact 0 0.01 NEgati

25 11/22/2010 Men's North Upper Wall Drywall Off White Intact 0 0 NEgati

26 11122/2010 Men's East Upper Wall Drywall Off White Intact 0 0 NEgati

27 11122/2010 Men's South Upper Wall Drywall Off White Intact 0 0 NEgati

28 11122/2010 Men's South Upper Wall Drywall Off White Intact 0 0 NEgati

29 11122/2010 Men's West Upper Wall Drywall Off White Intact 0 0 NEg ali

30 11122/2010 Men's West Upper Wall Drywall Off White Intact 0 0 NEgati

31 11122/2010 Men's Utility North Upper Sink Porcelain Off White Intact 5 0.67 Positiv

Sample Date

32 11/221201 0

33 11/2212010

34 11122/2010

35 11/2212010

36 11/2212010

37 11/22/2010

38 11/2212010

39 11/2212010

40 11122/2010

41 11/2212010

42 11122/2010

43 111221201 0

44 11/2212010

45 1112212010

46 11/2212010

47 1112212010

48 11/2212010

49 1112212010

50 11/2212010

51 11/2212010

52 11/2212010

53 11/2212010

54 1112212010

Room

Men's Utility

Men's Utility

Men's Utility

Men's Utility

Men's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Women's

Lead Based Paint Samples for Facility 16 Side Quadrant Component Substrate Color Condition

Intact South Upper Wall Partition Vinyl Grey

South Left Door Jamb Metal Off White Intact

West

North

North

North

North

East

East

South

South

West

West

South

South

North

East

West

West

NA

NA

NA

NA

Middle

Lower lower

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Upper

Middle

Middle

Middle

Middle

Right

Righi

N/A

N/A

N/A

N/A

Door

Ext Pipes

Floor Tile

Wall

Wall

Wall

Wall

Wall

Wall

Wall

Wall

WaiiT1Ie

Wall Tile

Wall Tile

Wall Tile

Door Casing

Door

Floor Tile

Wall Partition

Fixtures

Co mode

Metal

Metal

Ceramic

Ory.vall

Dry.vall

Ory.vall

Ory.vall

Dry.vall

Ory.vall

Dry.vall

Dry.vall

Ceramic

Ceramic

Ceramic

Ceramic

Metal

Metal

Ceramic

Vinyl

Porcelain

Porcelain

Off White Intact

Off White Rusted

Brown Intact

Off White Intact

Off White lntacl

Off White Intact

Off While Intact

Off While lnlact

Off White Intact

Off While lnlact

Off While Intact

Pink Intact

Red Intact

Red Intact

Red lnlact

Off White Peeling

Off White Peeling

Off White lnlact

Tan lnlact

Off While lnlact

Off While lnlact

Pb PbErr Result

0.01 0.01 Negativ

0 0 Negaliv

0 0 Negativ

0 0 Negaliv

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negativ

0 0 Negaliv

0 0.01 Negativ

0.4 0.02 Positiv

0.4 0.01 Positiv

0.4 0.01 Positiv

0 0 Negativ

0 0 Negativ

0 0 Negativ

0.01 0.01 Negativ

0 Negativ

0 Negativ

Facility Number: 16 Facility Name: SHP AJSE STOR FCLT

Facility Address : 218712 SHP AISE STOR FCLT

Facility Summary Report:

A=West, B=North, C=East. D=South

Facility Type Unknown

Facility Status Manned

Facility Owner: 12 MSG/CE

Photo File Name

16.jpg

Drawing File Name:

None.dwg

Lead Based Paint Detected: '1/

Date Constructed: 1931

Square Footage: 87496

Number of Floors: 1

1/23/2012- W0#1 0757 Replace internet cable CAT 6, Interior concrete walls are positive for LBP. all other areas tested are negative for LBP. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping, blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.

11/22/2011 - Workorder, Hangar 16 for Com Premise Project - All Areas analyzed are Negative for Lead Based Paint

10/20/2011, W0#80082 Paint hangar floor, areas tested are negative for LBP.

08/09/11 - WORKORDER 10498- Paint hangar doors Inside and out- All hangar door interior and exterior are Positive for Lead Based Paint. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination will be required for this project by a certified Lead Firm

7-26-11 , W0#10449 Upgrade NPRNET, areas tested are negative for LBP

7107/11 , W0#1 0419 Paint interior walls, All interior walls are positive for LBP as well as the Hangar Doors inside. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. The OSHA requirement for these rules applies for any amount of LBP.

Lead Based Paint Samples for Facility 16 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

28 1/23/2012 hallway c Upper Wall Concrete Off White Peeling 0.08 0.03 Pos

29 1123/2012 server room A Upper Wall Drywall Off White Intact 0 0 Neg

30 1123/2012 break room B Middle Wall Drywall Off White Intact 0 0 Neg

31 1/23/2012 pneudraul ic shop A Lower Wall Drywall Off White Intact 0 0 Neg

32 1/23/2012 pneudraul ic shop B Lower Wall Drywall Off White Intact 0 0 Neg

33 1/23/2012 pneudraulic shop c Lower Wall Drywall Off White Intact 0 0 Neg

34 1/23/2012 pneudraulic shop D Lower Wall Drywall Off White Intact 0 0 Neg

35 1/23/2012 electric shop A Lower Wall Drywall Off White Intact 0.02 0.02 Neg

36 1/23/2012 lox shop B Lower Wall Drywall Off White Intact 0 0 Neg

Asbestos Containing Material (ACM) Results:

Year ID Location(s) HSA Type

Floor Sample ID Original Sample ID HSA Description Sample# Asbestos

2012 Breakroom 01 16-WLSH-00 1-8-001

Wall - Sheetrock East: Beige;Chatky;Gran

2012 2 Office - Wheel and nr 01 16-WLSH-002-B-001

Wall - Sheetrock North; Off White:Gran

2012 2 Office- Wheel and Tir 01 16-WLSH-002-B-002

Wall - Sheetrock East: Off White; Gran 2

2012 3 Room - Battery Shop 01 16-WLJ-003-B-001

Wall - Joint Tape/Joint Compoud East: Off White:Gran

2012 3 Room - Battery Shop 01 16-WLJ-003-B-002

Wall- Joint Tape/Joint Compoud North; Off White;;Gran;Beige Adhesive 2

2012 3 Room - Battery Shop 01 16-WLSH-003-B-003

Wall - Sheetrock East; Beige;Chalky;Gran 3

2012 3 Room - Battery Shop 01 16-WLSH-003-B-004

Wall - Sheetrock Northt1h; Beige ;Chalky;Gran 4

2012 4 Room- Pneudralics 01 16-WLSH-004-B-001

Wall - Sheetrock West; Off White;Chalky;Gran

2012 4 Room- Pneudralics 01 16-WLSH-004-B-002

Wall - Sheetrock North; Off White;Chalky;Gran 2

2012 4 Room· Pneudralics 01 16-WLSH-004-B-003

Wall - Sheetrock East; Off White;Chalky;Gran 3

2012 4 Room- Pneudralics 01 16-WLSH-004-B-004

Wall - Sheetrock South; Off White;Chalky;Gran 4

2012 5 Room· LOX 01 16-WLSH-005- 1 Wall - Sheetrock NOI1h; Pink;Chalky;Gran

2012 6 Electrical Room 01 16-WLSH-006-B-001 Wall - Sheetrock West: Off White;Chalky;Gran

2012 7 Mezzanine 02 16-WLSH-007-B-001 Wall - Sheetrock West: Beige:Chalky;Gran

2012 7 Mezzanine 02 16-WLSH-007 -B-002

Wall - Sheetrock West; Beige;Chalky;Gran 2

NAD. Cellulose 5%, Fiberglass 3%, Non Fibrous 92%

NAD, Cellulose 2%, Fiberglass 2%. Non Fibrous 96%

NAD. Cellulose 2%. Fiberglass 2%, Non Fibrous 96%

NAD, Non-Fibrous 100%

NAD, Non-Fibrous 100%

NAD, Cellulose 3%. Fiberglass 3%. Non Fibrous 94%

NAD. Cellulose 3%. Fiberglass 3%. Non Fibrous 94%

NAD. Cellulose 10%. Non-fibrous 90%

NAD, Cellulose 3%. Fiberglass 2%. Non Fibrous 95%

NAD, Cellulose 3%, Fiberglass 3%. Non Fibrous 94%

NAD, Cellulose 5%. Fiberglass 3%. Non Fibrous 92%

NAD. Cellulose 2%. Fiberglass 2%, Non Fibrous 96%

NAD. Cellulose 4%, Fiberglass 2%. Non Fibrous 94%

NAD. Cellulose 3%. Fiberglass 3%. Non Fibrous 94%

NAD, Cellulose 5%. Fiberglass 2%. Non Fibrous 93%

Dimension:

Floor Area:

Sample Area:

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 SF

SF

0 LF

SF

0 SF

SF

0 SF

0 SF

Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAUAVIONICS

Facility Address : 218712 SHP AISE STOR FCLT Asbestos:

Facility Site: BASE Facility Status Manned

Facility Type Maintenance

Facility Owner: 12 MSG/CE iiiillill _ _. _ _,_ .. _llliiOill;;;;;;;;;;;;;;;;;;;;;t" Number of Floors: 1

Photo File Name 16.jpg

Drawing File Name: B16.tif

Facility Summary Report:

Hangar 16 Premise Upgrade Project All areas for LAN Drops are NAD. No Asbestos Detected

Date Constructed: 1931

Square Footage: 87496

08/31 /2011 - Workorder 10499 - Conduct Lighting Survey, Replace Hangar Lights, All ceiling Panels are NAD, No Asbestos Detected

PCB

All light fixtures must be checked for PCB Ballasts. If ballasts are not marked "NO PCBs" then ballasts must be handled as PCB Waste, or recycled at an approve EPA PCB Recycling Facility . PCB's must be packaged lAW DOT regulations and Manifested.

Recycling Certificate Requir.ed if Recycled

Light Bulbs, HID Lamps are known to contain Mercury in small amounts. All lamps must be removed from fixture packaged lAW DOT regulations and manifested to an approved EPA recycling facility or handled as Universal Waste in the State of Texas.

8/02/2011 Workorder 10449 - Upgrade NPRNET- All sheetrock materials proposed for core drilling is (NAD) No Asbestos Detected

7 Mar 11 , Workorder 80006, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)

28 Jul 09 - Hangar Door Window Glazing is NAD for ACM

15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM

Lead Based Paint Samples for Facility 3 Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

19 1/23/2012 room 208 A Middle Wall Drywall Off lfllhite Intact 0 0 Neg

20 1/23/2012 room 208 B Lower Wall Drywall Off lfllhite Intact 0 0 Neg

21 1/23/2012 2nd floor stairwell D Upper Wall Drywall Off lfllhite Intact 0 0 Neg

22 1/23/2012 dock box 7 A Upper Wall Drywall Off lfllhite Intact 0 0 Neg

25 1/23/2012 dock box 7 B Middle Wall Drywall Off lfllhite Intact 0 0 Neg

26 1/23/2012 dock box 3 A Lower Wall Drywall Off lfllhite Intact 0 0 Neg

27 1/23/2012 dock box sheet metal c Lower Wall Drywall Off lfllh ite Intact 0 0 Neg

Facility Number: 16 Facility Name: AGE/ELECTRO ENVIRONMENTAL/AVIONICS

Facility Address : 21871 2 SHP A/SE STOR FCLT Asbestos:

Facility Site: BASE Facility Status Manned

Facility Type Maintenance

Facility Owner: 12 MSG/CE ilillil-.--. ... ---lllllil4 Number of Floors: 1

Date Constructed: 1931

Square Footage: 87496

Photo File Name 16.jpg

Drawing File Name: B16.tif

Facility Summary Report:

Area is NAD, (No Asbestos Detected) for Asbestos Containing Materials for this specific project

7 Mar 11, Workorder 806, Install ceiling Fans in Hangar, AI ceiling planks are NAD (No Asbestos Detected)

28 Jul 09 - Hangar Door Window Glazing is NAD for ACM

15 Jun 09 - Production Support Room Floor tile and mastic is NAD for ACM

Asbestos Containing Material (ACM) Results :

Year ID Location(s)

HSA Type

2011 Hangar Interior

Floor HSA Description Sample# Asbestos

Ceiling Board White:Gran:GrayBiack NAD. Non·Fibrous 100%

Dimension:

Floor Area:

Sample Area:

0 LF

2013-11-04_16_11327_Renovate multiple areas