Attachment 10 - Questions_Answers_2 Aug 2021.pdf

PDF 83 KB Posted

Attached to
Maintain Exterior Coatings of Multiple Facilities Federal contract opportunity
Solicitation number
FA301021R0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a solicitation for a federal contract to maintain exterior coatings of multiple facilities at Keesler Air Force Base. The proposed construction value is between $250,000 and $500,000, and the acquisition is being issued as a 100% HUBZone set-aside. The work includes repairs to exterior insulated finish systems and coatings on buildings 4106, 6950, and 7320. Gutters, downspouts and a large hole around a pipe are also included in the scope of work. An organized site visit was held on July 22, 2021 for offerors to gain access to the base. The period of performance will be between 60 to 120 days depending on the number of contract line items funded at time of award. Offerors are directed to review sections L and M of the solicitation for proposal preparation and evaluation factors. The contracting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maintain Exterior Coatings of Various Facilities, Phase 3

FA301021R0018

Questions and Answers

Q1: Are the Gutters and Downspouts to be included on buildings 6950 and 7320?

A1: Yes; SOW and Drawings have been updated to include gutters and downspouts for buildings 6950 and 7320.

Q2: Are the large louver panels set back above the main entrance on buildings 6950 and 7320 to be included?

A2: No; small vents and louvers around the buildings are included but the large, referenced louver panels are not included.

Q3: Are metal vents located on the roofs of buildings 6950 and 7320 to be included?

A3: No; rooftop mounted equipment, vents, or other items on these two building are not included with the exception of the gutters and downspouts.

Q4: Is the large hole around a pipe on the South-east corner of building 4106 to be included in the EIFS repairs?

A4: Yes; the referenced hole should be included in the EIFS repairs.