This document contains a material submittal schedule and federal contract opportunity solicitation for maintaining exterior coatings of multiple facilities. The solicitation seeks pricing to repair and paint exterior surfaces between $250,000 and $500,000 as a 100% HUBZone set-aside. A site visit is scheduled for July 22, 2021, with base access requirements stated. The schedule outlines nine required submittals including repair and coating plans, warranties, and hazardous material questionnaires due prior to and after notice to proceed. The Air Force is soliciting offers through September 2021 to maintain exterior coatings systems at Keesler Air Force Base for a one year base period and option years exercisable through final bid guarantee dates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 002 - SF 30.pdf | ||
| Amendment 001 - SF 30.pdf | ||
| Attachment 3 - Exteriors Phase 3 DWG_2 Aug 2021.pdf | ||
| Attachment 1 - Exteriors Phase 3 SOW_2 Aug 2021.pdf | ||
| Attachment 10 - Questions_Answers_2 Aug 2021.pdf | ||
| Site Visit Sign-In_22 July.pdf | ||
| Attachment 1 - Exteriors Phase 3 SOW_6 July 2021.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Solicitation - FA301021R0018.pdf | ||
| Attachment 7 - Past Performance Questionnaire.pdf | ||
| Attachment 3 - Exteriors Phase 3 DWG_13 May 2021.pdf | ||
| Attachment 6 - Past Performance Reference List.pdf | ||
| Attachment 2 - Exteriors Phase 3 SPECS_6 July 2021.pdf | ||
| Attachment 8 - SF 1444.pdf | ||
| Attachment 5 - Wage Det MS20210050_2 Apr 2021.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG141001 | Project Title: | ||
| MAINTAIN EXTERIOR COATING SYSTEMS | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||||||||||||||
| 2 | HazMat Questionnaire | 3 | 5 Days Prior to Start Date | Must be filled out if Contractor answers YES to to the HazMat questinnaire | ||||||||||||||||||
| 3 | HazMat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submot Final Quantities | |||||||||||||||||
| 4 | HazMat Reporting entry Form | 3 | 3 | End of Contract | ||||||||||||||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||||||||||||||
| 6 | Warranty (Manufacture's) | 3 | End of Contract | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | 3 | End of Contract | |||||||||||||||||||
| 8 | Section 09 01 70 Repair of Exterior Insulation Finish Systems | 3 | 3 | 1 | 1 | 3 | 10 Days Following NTP | |||||||||||||||
| 9 | Section 09 90 00 Painting and Coating | 3 | 3 | 1 | 1 | 3 | 10 Days Following NTP |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .