This document consists of an amendment to a solicitation and the related federal contract opportunity. The amendment provides questions and answers to clarify requirements for an addition to a paint blast booth building at Keesler Air Force Base, Mississippi. The estimated value of the construction is between $1,000,000 and $5,000,000. The acquisition is set aside for Service-Disabled Veteran-Owned Small Businesses. The bid due date is extended to September 2, 2020. The amendment incorporates updated drawings and provisions regarding prohibitions on certain telecommunications and video surveillance services or equipment. The related federal contract opportunity specifies that the solicitation is for an addition to a paint blast booth and that funds are not presently available, with no award to be made until funding is appropriated. The Department of the Air Force is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA301020R00350002 SF 30.pdf | ||
| Attachment 3 - Addendum 01_DWG_21 Aug 2020.pdf | ||
| Attachment 11 - Provision 52.204-24 & Clause 52.204-25.pdf | ||
| Site Visit Sign In Sheet.pdf | ||
| Attachment 10 - DoD Building Code - AHJ defined.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 8 - SF 1444.pdf | ||
| Attachment 2 - Add Walk-in Blast Booth Building SPECS.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Solicitation - FA301020R0035.pdf | ||
| Attachment 5 - AF 66.xlsx | XLSX spreadsheet | |
| Attachment 1 - Add Walk-in Blast Booth Building SOW.pdf | ||
| Attachment 4 - Wage Determination.pdf | ||
| Attachment 3 - Add Walk-in Blast Booth Building DWG.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
0001 - MAHG 19-1072 Add Extension to Paint Blast Booth Shop IAW attached Statement of Work, Specifications, and Drawings.
WO#82188
Purchase Request Number: F2JTFA0154AW01
INFORMATION FROM TO
CIN 00000000000005445096
Section C - Specification/SOW/SOO/ORD
Miscellaneous text in this section has been modified to:
Addition to Paint Blast Booth Bldg Questions and Answers 24 August 2020
1. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?
A) This project is not sales tax exempt.
2. Where will the designated parking area be for workers accessing the construction site?
A) Designated parking area will be determined at pre-con meeting with winning contractor.
3. Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project?
A) The government will not accept Procore Project Management. Any large files can be uploaded to DOD
SAFE.
4. Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?
A) Name and contacts will be given after award.
5. Due to current potentially significant tariffs being placed on the importation of building materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would increase pricing on all steel or wood materials, regardless of origin.
A) No, the government will not consider a price escalation. Per the provision 52.216-1 in the solicitation, the government contemplates a firm-fixed-price contract award. Firm-fixed-price contracts are not subject to any adjustment on the basis of the contractor's cost experience in performing the contract.
6. Is AISC (American Iron and Steel Certification) required for the structural steel fabrication and/or erection for
FA301020R00350001
this project?
A) Yes, per Specification Section 05 12 00 Paragraph 1.3 and per note 2. Steel on S100.
7. Drawing C700: Erosion Control: this drawing describes the erosion control plan, including silt fence and construction entrance. The site is a concrete surface. Are these requirements to be completed per this drawing?
Please clarify.
A) Yes, per C700 silt fence should be installed together with temporary security fencing Specification Section 01561. Soil will be disturbed/stockpiled during site demolition.
8. Drawing A101: Equipment to be relocated on Blast Room 108:
a: Who is dismantling the equipment from the actual location and prepare for mobilization? Please clarify A) As stated on Sheet A101 General Note #7 General contractor is responsible for relocation and installation of existing blast cabinets from Bldg #4303 including but not limited to all Mechanical, electrical, and plumbing connections. See floor plan for relocated location.
The General contractor is responsible for all aspects of relocating the equipment, including but not limited to dismantling, relocating, and reinstallation.
b: Who is responsible for reinstallation and start up? Please clarify A) See response 8a above.
9. Drawing A101: Room 109 (existing building):
a: Is this space to receive painting, and a new coiling door on opening 109B? Please clarify A) Yes, all existing interior wall, steel, and decking to receive painting. Yes, new coiling door on opening 109B per the opening schedule.
b: Existing Structural Steel: is all exposed steel to receive new paint (columns, beams, joist, and deck)? Please clarify A) See response to 9a above.
c: Is any work related to the existing booth installed in this room 109 to be performed by the GC? Please clarify A) The General Contractor is responsible to cover/protect the existing booth installed in room 109 throughout construction as required to install new work.
10. Drawing Series S: Is the new exposed structural steel (columns, beams, joists, and deck) to receive paint?
Please clarify A) Yes.
11. Drawing S600 Detail 3: This detail shows an L shape piece 7" x 4" x 3/8" at top of CMU wall, located transversal to direction of joists. Are these L shape pieces to be located at all CMU walls reaching the metal deck? Please clarify A) Yes, per Details 3, 4, and 5 on S600 and Section 1 on S400.
12. Drawings A101- 3/S600: Is no detail on how the vertical gaps where the joist goes across CMU walls will be sealed. Please clarify A) Provide (2) layers of Type X Gyp Bd to 12" beyond the cut CMU on all sides w/ fire caulk at each side of all fire rated wall joist penetrations. Provide (1) layer of Type X Gyp Bd to 12" beyond the cut CMU on all sides w/ sealant at non-rated wall joist penetrations.
13. Drawing A101: Is no specifications for the Fire Curtain show on drawings. Please clarify A) As stated on Sheet A101, the fire curtain is to be model M2100 by Smoke Guard, or equal.
14. Drawing Series S: Are all CMU walls to be fully grouted? Please clarify A) No, per note 10. Concrete Masonry Unit Notes on S100, grout all cells below reference finish floor elevation or (full height) containing reinforcing or bolts.
15. Drawing E100: Light fixtures: are the new light fixtures to be located at the same locations as the actual light fixtures? Please clarify A) New interior and exterior lights may be close to existing. However, all conduit and wiring is to be new.
Locate lights as shown on drawing. Coordinate with any equipment or structure that may be in conflict.
16. Grounding verbiage indicates a counterpoise around the building. Is a counterpoise required?
A) No counterpoise around the building. Only electrical grounding and lightning protection grounding electrodes where shown.
17. If no counterpoise is required what resistance do you require on each of the four driven ground rods?
A) Less than 5 ohms
18. What is the intent on the lightning protection over the open slab area in the back of the building?
A) There is a metal canopy. Include LP on the canopy
19. Is there a hazard classification requirement on the blast booth areas?
A) Yes, the Blast Room 108 and existing Blast Chamber 109 are Class 2, Division 2.
20. What is the intent of the explosion proof light fixtures? And where does the explosion proof requirement start and stop as to installation of class1 Div.1 or Div. 2?
A) The Blast Room 108 and existing Blast Chamber 109 are Class 2, Division 2. Light fixtures should be classified accordingly. All conduit in these (2) rooms only shall be installed according the NEC for classified areas. All conduit, boxes, connections, fittings, etc. in these (2) rooms only shall be rigid. Provide and install conduit seal offs prior to where conduits enter these spaces. All devices, switches, disconnects, and electrical components in these (2) rooms shall be installed as explosion proof as well. Move the power packs for light fixture control to above ceiling in Corridor 104. All of the rest of the building shall be standard, electrical installations.
21. Are we to assume the existing ground meets the resistance readings required in your spec's?
A) Existing service ground remains. Lightning Protection system is required to bond to the service ground.
22. Is everything except the blast booth area lights wired in a non-classed means and methods standard?
A) All conduit and wiring in Blast Room 108 and existing Blast Chamber 109 shall be wired utilizing explosion proof, classified methods. The rest of the building shall be wired utilizing standard methods, follow specs for installations of EMT
23. The blast booths we were shown during the site visit had two power sources and it was uncertain if these were to be relocated or new booths were to be used. Is the power connection correct for what will be installed?
A) Our site investigation appeared the building only had (1) electrical service. Bid per the drawings. If field conditions are found to be different, we will address with successful electrical contractor.
24. Is the blast booth intended to have mass notification?
A) Yes. Mass notification shall be installed as specified. Change the drawing legend to indicate combination speaker strobes with white and amber lens. The operator control console shall be as follows:
SIGNALING DEVICES
A. Speaker/Strobe: Speaker/Strobe shall be a combination device with speaker, clear fire alarm strobe, and amber mass notification strobe. Interior devices shall be mounted using a combination box and cover. Exterior devices shall be mounted in dual weatherproof boxes. All devices shall be mounted veritical with fire alarm speaker/strobe above mass notification strobe.
B. Strobe only: Strobe shall be a combination device with clear fire alarm strobe and amber mass notification strobe. Interior devices shall be mounted using combination box and cover. Exterior devices shall be mounted in dual weatherproof boxes. All devices shall be mounted vertical with fire alarm strobe above mass notification strobe.
C. Speaker/Strobe and Strobe devices shall be as manufactured by Wheelock or equal.
OPERATOR CONTROL CONSOLES
A. Shall be provided adjacent to the main fire alarm panel. Final locations shall be verified with the end user prior to rough-in.
B. Operator Control Console shall be housed in a surface mounted steel enclosure with continuous hinged lockable door with pull slam latch and proper identification.
C. Operator interface devices at the console shall consist of microphone, eight alarm initiation buttons and a HVAC shut down push button.
D. Microphone shall be hand-held, push-to-talk type. Microphone and associated circuitry shall be fully compatible with the connected FACP. Live voice messages shall override prerecorded alarm messages.
E. Alarm initiation buttons shall be push-on/push-off type which provide a contact closure to initiate playback of a pre-recorded alarm message over the System's speaker network. Push buttons shall change color from black in the OFF position to green in the ON position. Each push button shall have a legend plate identifying the associated alarm message.
F. HVAC shut down pushbutton shall have a red mushroom head with maintained contacts for emergency shutdown interface with HVAC system(s). Pushbutton shall have a legend plate identifying the associated function. System shall be interfaced and connected to HVAC control system as required to shut down all air moving equipment.
G. Operator Control Consoles shall be as manufactured by Cooper Notification (Wheelock) model number SP4- LOC-KIT-SB (surface).
Section J - List of Attachments
The following attachments were added:
Attachment 3 - Addendum 01_DWG_ 21 Aug 2020 Attachment 11 - Provision 52.204-24 & Clause 52.204-25
The following attachments were deleted:
Attachment 3 - Add Walk-in Blast Booth Building DWG
| IDCode: |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 8/24/2020 |
| ReqNo: F2JTFA0154AW01 |
| ProjNo: MAHG19-1072 |
| IssCode: FA3010 |
| AdmCode: |
| IssuedBy: FA3010 81 CONS CC |
310 M ST BLDG 4605
CP 228 377 3230
KEESLER AFB, MS 39534-2701
United States Michael Wittmer, Email: michael.wittmer.1@us.af.mil Telephone: 597-1826
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA301020R0035 |
| SolDate: 7/28/2020 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: Off |
| Require: |
| Copies: |
| Descript: The purpose of this amendment is to: |
1. Provide Questions and Answers
2. Incorporate updated drawings - Attachment 3 - Addendum 01_DWG; 21 Aug 2020
3. Incorporate Attachment 11 - Provision 52.204-24 & Clause 52.204-25
4. Extend bid due date to: Wednesday, 2 September 2020 at 2:00 pm CST
| ContNameTitle: |
| CoNameTitle: Katie Fulford |
Email: katie.fulford.1@us.af.mil Telephone: 228-377-5504