This solicitation package seeks proposals for repair work to concrete aprons and a wash rack at Keesler Air Force Base. Offerors are to furnish all labor, materials, and equipment to complete repairs specified in the statement of work, specifications and drawings. The work is to be conducted as a HUBZone set aside utilizing a PPT procedure, with a NAICS code of 237310 and size standard of $39.5 million. The estimated value is between $1-5 million. The solicitation was tentatively scheduled to post on FedBizOpps on October 11, 2019 with a closing date of November 12, 2019 and a contract performance period of 250 days from the notice to proceed. Registration in SAM is required for all contractors wishing to do business with the government. Funds have not yet been obligated and no award will be made until funding is available, with the right reserved to cancel the solicitation before or after closing.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section C - Specification/SOW/SOO/ORD
Miscellaneous text in this section has been modified to:
Questions and Answers for FA301020R0003 Repair Apron Pavements, Keesler AFB, MS
1. Please confirm that the response date has been extended to 20 Nov 2019 at 2:00 pm Central Time.
a. Yes, per Amendment 1 issued and posted on FBO on 29 Oct, the response date has been extended to 20 Nov 2019 at 2:00 pm CST.
2. Please extend the Period of Performance to 300 days. Not wishing anything bad upon this, but as relatively trouble free as this Hurricane/Summer Storm season was, the coming year may present more challenges.
a. FAR 52.236-4, included in the solicitation, indicates weather conditions taken into account when determining the period of performance. The contractor may be granted an extension due to weather in a given month for days in excess of those already accounted for in the clause.
3. What will be the daily procedure for Contractor employees to gain access to the airfield work sites?
What will be the procedure for concrete and asphalt trucks to gain access to the airfield work sites?
a. Contractor and all necessary equipment/vehicles will be escorted on and off the site at the airfield by a Vectrus escort. An airfield free work zone will be created for the contractor to freely work within the construction boundaries at the site. Any need to leave the free work zone must require an escort.
4. Where will Contractor employees be permitted to park?
a. See attached map with permitted parking areas. When conducting work at Ramp 1 near spot 4 we will have spots 4 and 5 blocked off as a Free Zone and the contractors could park inside the free Zone area or next to the 41st APS facility on the north side of the building depending on how many vehicles are involved.
5. Will heavy equipment that might be used in the performance of this contract be allowed to remain on the airfield overnight?
a. Equipment can remain overnight at laydown area as specified on attached map. Equipment may remain overnight on the airfield and can be stored at the AGE yard near the 41st APS facility unless it cannot be moved in which case it would remain inside the free zone with OB light on top.
6. What is the possibility that Contractors may lose work days due to the airfield having to be closed to Contractor access without advance warning to the Contractor?
a. The likelihood is very slim. However any delay or loss in work days will be noted and considered by inspector and contracting in case an extension is requested.
7. Can the USAF provide assurance to the Contractor that assigned staging and storage area(s) will not be damaged by airplane use of the airfield?
a. The slab next to TA (Bldg 0234) could be used as the staging area, and it would not be affected by aircraft.
8. Please confirm that once the cause of the erosion underneath the existing asphalt is determined that any additional required work will be sufficient justification for a Contract Modification.
a. Work is to be done IAW the statement of work, specifications, and drawings. If the contract awardee determines deviations are needed an RFI shall be submitted to the Contracting Officer at the time of discovery.
9. What accommodation will be made for toilet facilities? And if Contractor is to provide toilet facilities, how can they be secured and what provision is there for servicing them?
a. There are no accommodation or servicing for toilet facilities. Contractor provided toilet facilities can be located within laydown area.
FA301020R00030002
10. In regards to the contract drawings, it appears page 8 has been omitted. Will the Government please issue page 8 of the contract drawings?
a. Drawings package only consists of 8 pages and has been attached.
11. Will this project require any grooving?
a. No.
12. Can we soil-cement the dirt under the concrete instead of digging out the dirt and hauling in limestone?
a. Contractor must install aggregate subbase.
13. Would we be able to crush the demolished concrete onsite and use it for base material instead of hauling in additional limestone?
a. Yes.
14. Will we be able to splice the rebar together or only full length pieces be allowed?
a. Rebar can be spliced together.
15. What are the requirements for the staff to get on base?
a. See Statement of Work Section 3.12
16. Please specify joint filler? Will cork or rubber expansion be acceptable or is this a liquid product only?
a. Joint filler shall be hot applied fuel-resistant rubberized asphalt joint filler.
18. Could you please clarify the deformed dowels you wish to install? Our experience is that the dowels will be smooth to allow expansion contraction but not up and down movement
a. Contractor should use regular, non-deformed dowels.
19. Will we be allowed to have a 500 gallon off-road diesel tank on site for our equipment? If so, what specific safety measures do you require?
a. Diesel tank can remain within laydown yard. Contractor will have to gain permit approval from fire safety, and CE Environmental will at some time throughout the duration of the project inspect fuel tank.
20. You indicate demo and remove 220'x90' concrete area (drawing page 3 of 9), however, within that same area, there is a concrete section (about 38'x90' area) that we shouldn't disturb. Please clarify?
a. Contractor should not disturb new concrete around airfield drainage area. This area is shaded on page 3 of 9. All other concrete pavement within demolition limits will be removed and replaced.
21. If de-watering is necessary, where do we pump the water? Please clarify if the filtration bags are required?
a. Contractor can use nearby storm drains. Filtration bags are required.
22. What size limestone sub base are the requirements? (Standard is 3/4")
a. Standard aggregate size is acceptable.
23. Please clarify the rebar location to be 4" from the top as you indicated? (industry standard is 1/3 of the slab thickness, from the bottom)
a. Yes, rebar location should be 4 inches from the bottom of slab.
24. Please spec joint sealer product? Will we be able to use cork or rubber expansion with snap cap and then install the joint sealer?
a. HI-SPEC Hot-Applied Polymeric Pavement Joint Sealant or equivalent as approved by Contracting Officer.
25. What is the thickness of the existing concrete?
a. Existing concrete is 9 inches thick +/- 1 inch in some areas.
26. Drawing Sheet 5 (of 9) indicates saw cut dowels into existing concrete and patch back, we believe this defeat the purpose of the dowels, shouldn't we drill the existing concrete and install the dowels that way?
a. Yes, drill the existing concrete and install the dowels.
27. Drawing page 9 of 9 shows mooring eye shaft (copper rod) driven into the ground 8', however, at the bottom, there is no auger or any other device attached. If the shaft is just a point at the bottom, it could easily be pulled back from the ground when an aircraft is attached to the eye. Please clarify.
a. Auger shall be attached to mooring shaft for plane stability.
28. Are there any Geo tech reports available?
a. No, there are no geotechnical reports. There is a brief evaluation of the subbase from the last pavement condition survey which states: "The subgrade soils around the airfield mostly categorize as Eustis loamy sand according to the United States Department of Agriculture (USDA) Web Soil Survey. These soil types are composed of varying degrees of silts, clays, and sands at varying depths, with sands typically comprising over 80 percent of the mix."
Section J - List of Attachments
The following attachments were added:
Attachment 10 - Apron 1 Work Site DWG
Attachment 2 Repair Airfield Aprons DWG (Nov 2019)
The following attachments were deleted:
Attachment 2 - Repair Airfield Aprons DWG
| IDCode: |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0002 |
| EffDate: 11/14/2019 |
| ReqNo: F2J31D9247AW03 |
| ProjNo: MAHG14-1010 |
| IssCode: FA3010 |
| AdmCode: |
| IssuedBy: FA3010 81 CONS CC |
CP 228 377 3230
310 M ST BLDG 4605
KEESLER AFB, MS 39534-2701
United States Clayton Petrie, Email: clayton.petrie@us.af.mil Telephone: 228-377-1087
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA301020R0003 |
| SolDate: 10/21/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: Off |
| Require: |
| Copies: |
| Descript: The purpose of this amendment is to: |
1. Provide questions and answers.
2. Replace Attachment 2 - Repair Airfield Aprons DWG (Dated 12 Nov 2018), Replace with Attachment 2 - Repair Airfield Aprons DWG (Dated Nov 2019)
3. Add Attachment 10 - Apron 1 Work Site DWG
| ContNameTitle: |
| CoNameTitle: Katie Fulford |
Email: katie.fulford.1@us.af.mil Telephone: 228-377-5504
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .