Attachment_1.doc

DOC document 31 KB Posted

Attached to
MULTIPATH INTERCOM SYSTEM INSTALLATION
Solicitation number
FA3002-15-T-0007
Issued by

About this file

Statement of Work Attachment 1

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation_.docx DOCX document
5_Bldg_INTERCOM_SOW.docx DOCX document
5_Bldg_INTERCOM_SOW__.docx DOCX document
Combined_Synopsis_Solicitation_.docx DOCX document
Attachment_1.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT - 1

REFERENCE 115 – 15-0042

DETAILED TASK

“ MULTIPATH” INTERCOM SYSTEM INSTALLATION FOR THE FOLLOWING VANCE FACILITIES: 200, 244, 690, 601, & 345 .

The work required by this turnkey contract shall be performed in accordance with the stated TIA/EIA & NEC/NFPA 70 specifications and references within this Statement of Work (SOW).

The contractor shall provide all materials, Cat3 OR better Plenum rated cabling, conduit, power and power supplies, battery backup, labor, tools, and any ancillary equipment to provide the above mentioned facilities with a zoned intercom working with the existing “Valcom MultiPath “ head end system. Note that the building information listed in this Statement of Work is provided to the contractor only as a guide, acoustics should be verified by the contractor. The contractor may complete a scheduled site survey to insure accuracy of labor, equipment and materials required to provide an interoperable system. Please find listed below, the following Vance building locations, materials, and labor as was provided by the contractor on the previous site surveys. Also note ports in the head end equipment will be required, and will require programming.

All wire runs to speakers shall be home-runs, plenum rated and is placed in accordance to NEC/NFPA 70. All wire provided and installed by the contractor shall meet NEC/NFPA 70 standards and be secured in a workmanship manner. Upon project completion the contractor shall provide PAE/ITO with test documentation of the system installed for review and concurrence by the Air Force, along with as-built drawings of the completed system and system manuals. Any work changes, additions or deletions to this statement of work require coordination and authorization from the Air Force, Procurement, and PAE/ITO before any change is accomplished.

The contractor shall insure compatibility with the Giant Voice and IPAS Bridge equipment currently being used on the Base in conjunction with “MultiPath” installation.

This system shall have no less than one (1) years warranty provided to the customer.

SCOPE OF WORK:

BUILDING 200 & 244 (Con-Log /Admin, Warehouse & Supply) All speakers in Building 200 Administration areas (1st & 2nd floors) plus the Warehouse areas shall be replaced on a one for one basis. Install 87 - Valcom 9022 One-way speakers in Administration areas, 5 – V-1036C horns in the Warehouse Area. All cables run in plenum rated areas shall be plenum rated and all home runs, 1-13-V1015B-WW unit, 3-Valcom 4124 Power Supplies, 3-Valcom 1092 Volume Controls. Building 244 requires 7 – V-1020C ceiling speakers, 7 – V-1036C horns, 14 home run cables with plenum rated cables required in plenum areas with all wall penetrations fire stopped upon completion. Vendor shall provide scissor lift to access and install Warehouse & Supply wiring and speakers.

BUILDING 690 (71 OSS)

Install 42 Valcom 9022 One-way speakers, Run 42 Plenum rated home run cables, 1-Valcom 4124 Power Supply, 9-Valcom 1092 Volume Controls, and 1-V-STX Paging Card to be installed in the Base DCO. Please note that no speakers are to be installed in rooms 41, 52, & 53 per 71 OSS. Please note all wall penetrations shall be fire stopped upon completion.

BUILDING 601 (Club)

Install 15 Valcom 9022 One-way speakers, Run 15 Plenum rated home run cables, 1-Tripplite TE-600 UPS Battery Back-up, 1-Valcom 4124 Power Supply. Please note all wall penetrations shall be fire stopped upon completion.

BUILDING 345 (Bowling Alley) Install 10 Valcom 9022 One-way speakers, Run 10 Plenum rated home run cables, 1-Tripplite TE-600 UPS Battery Back-up, 1-Valcom 4124 Power Supply, 1-Valcom 1092 Volume Control. Please note all wall penetrations shall be fire stopped upon completion.

BLDG. 500 ROOM 037 (DCO)

Turnkey installation includes programming of the Valcom “MultiPath” head end equipment including adding port cards to accommodate the new Valcom intercoms being installed at and providing PAE/ITO with the assigned Group/Code for system access at Bldgs. 200, 244, 690, 601, & 345. Also programming shall provide all Giant Voice announcements to the above mentioned buildings.

BASE SUPPORT

PAE/ITO will provide a copper cable pair from the Valcom “MultiPath” 66 block (already established) in Bldg. 500 Room 037 to Bldgs. 200, 244, 690, 601, & 345 TER and terminate on a RJ-11 connecting block labeled as “MultiPath Intercom”. The Base shall supply 1 quad 110 VAC outlet and 1- 3/4 “ X 4’ X 4’ in Building 690’s North Mechanical Room in the SW corner (See CE work request 332).

CONTACTS

POC:

Dan Bickerstaff

PAE/ITO

246 Brown Parkway

Bldg. 500 Rm. 028

(580 213-6045

ALTERNATE POC:

Joan Kelley

PAE/ITO

246 Brown Parkway

Bldg. 500 Rm. 028

(580) 213-7999